Loading...
HomeMy WebLinkAboutSDP200400082 Calculations Final Site Plan and Comps. 2004-11-15 GLENWOOD STATION PHASE 2 'STORMWA, ER/BMP SUMMARY AND CALCULATIONS STORM WATER DETENTION: As part of Phase 1 of Glenwood Station a bio-retention facility was designed to satisfy County storrnwater detention requirements for both Phase 1 and Phase 2 of the project. Assumptions were made for the Phase 2 proposed improvements and a c factor of 0.64 was calculated and used for the pond modeling and design. With the proposed site plan for Phase 2 nearly complete,the c-factor was re-calculated for a value of 0.65. This is a very slight increase so since none of the other pond variables have changed,i.e.,the drainage area and time of concentration,the pond model has not been updated. This can be done if needed. From the previous pond calculations: Q2(pre)=22.92 ccs • Q2 postt=22.99 cffs Qio(pre)=31.02 offs Qio(post)=28.10 cfs STORM DRAINAGE SYSTEM A: Storm Drain System A was designed to handle Qlo,=16.06 cffs from fully developed Phase 2 portion of the property entering structure A7. With this proposed site plan for Phase 2,Q10=13.40 offs entering structure A7 as planned. WATER QUALITY/BMP: 31 Phase 1 consumed most of the water quality capacity in the proposed bio-retention facility, therefore,water quality control for this phase will be provided by a combination of three bio-filters constructed between Rio Road and the proposed buildings and by porous paving block along the parking spaces along the back of the office building parking lot. For the water quality control plan to be fully utilized,all roof drainage from the proposed building should be routed to the bio-filters. The surface area provided by the proposed BMP's exceeds the County requirement if full credit is given for square footage of porous paving block. Phase 2 Impervious Area=52,272 sf Required BMP Surface Area=52,272 x 0.05=2,614 sf Proposed BMP Surface Area=6,750 sf REDEWED • NOV 15 2004 Please see the enclosed storrnwater calculations. COMMUNITY '_NT GLENWO( D STATION PHASE 2 STORMWATER/BMP SUMMARY AND CALCULATIONS STORMVVATER MANAGEMENT/BMP CALCULATIONS: 0 E„,ba 51or wi !dale r "Dcfer) ; -e- ILlo - a-C-C Ovl ro 6). `11 40,c_re 9 (2 6 (-/.. \ Ab jk; pi-,2,1)0.y1 '901 ?114, -1-1;) -. P62_34_ I I _ 5 SS, g- •-npefaistA 67.4) A,„ 0, ;_ncceepi_5e. - rc es pppleael ricJ 61. ‘7-loco.,1 Dr^ -10 k2„:1 ottc D ( _.p 0;.1+ La D ""1 0 /), = - 3 A. e_ = 0- g(),/ Ali pc()_?,_5_, per 0 411 f dtribt e , mod 0 ttZn v Wet-1 e OcAa l ; - Co -7-(ro , ku a 1o)e ro r Se. j . 42/2er1/;,,, iliee / 2D Jere , 52/ 2 72 SF 4.0;14 &gyp 7�/�c e iea = 5 2/ Z7Z Y e. 0 S. i2, 2.Z7 it ;v - l lae�' - f s , He r = I 5 I• (� 2, Z 2 I SF .(20rort5 ?Ota;li gIo0-k 750 • ?1,0 C& il5Gr GLENWO( D STATION PHASE 2 STORMWATER/BMP SUMMARY AND CALCULATIONS PHASE 2 INLET AND PIPE CALCULATIONS: kr,-:--- .,,419 7.1. . '.%;''',7'`s-''''. ----'''Z.,..,....- .:':'.'''' ''-'v`.. :;1":.NZ,,W,;;;'. -----L-r--.'" ''''-'44q''''' '-'.--r---.' 1_:: _ --7,?'-:.1::t 1 '' ! '' ' it- \ .. `\ .;. ` . ;po. '': :... 4= :�a _..�'� ,---2;>. i' I -';tip, . .Jr!"e'. . - ----- - -`_- L /�._� `'';mil;l��i ,.' _ •,, "`p�j�.'- = ....• '— r -„_� ritp r €1 f �! • _ R► ( - ,;try I �i } 1 titjar:■;]` Y;171 i, .,,,.., it\ tlic.'-, ; / li i l: _. ,,,.,, ,..: . Mr', I/lit _.1J,,,m.Wil .. L, ,t ,..? . ,1 ii 1 „ _.;_ \I IN,j1.;„"'!„t 'ir ;1 i . Illaill 4 4111111 .74- lift/i' ' ...,L,L.1.51 ! ;1 --f_. , , -'..1:,"'IV \ 4,1 1 li OM 6• .n g .4-,"/ / I I i _.„,-.-:*.,,-:'‘:1' ;',:, ‘;'i'*' '17., illliM11.1... 1 i ‘,„ 7: ..,. ,_::4,,L,,:::x.,,,,,,. 1.. :Ina A.. imeimm.....,. _ it 4 i„ , ..:-.:;'_•.:;i. ., 'i .;ZI.M,,;1';'CiZill'' '4114:‘ --Tit / ,/," i ,. . .., ,.., , . ,..: .,,iiiik ..„....A1,..._., --- _,,,.I 'fit / i.r t;, r , 41a1k17,.4 ���11ik,1„'..k.4I WtI//.it q"t 1 / P /liy „. i -• ' is;,i;?::'i j / '1 @l I 8X, /• . it l \/r . % ' , :3.!! k•111, '‘ \ '-'''.IL awl. .i ii / , : , .... .„ 1 ' ! l+ `\ki,l',i\S 1'i 1k.•�%II1lr�jiral 4.. 1."I �, �0� I` J �i • \` , , ,, ;ti t_0: 7W�''"., �q`�l -` }C ! ; am`' ....„..,--. ',.... .._ 1`,,,,\•,.., • ':,,. 1\" .\a, 1 t !; ,' ' ii, ,, i ce. '' !rf i/ . . / ',/i-. /.,-',. -.- _ /• .j"•�� _' / ' �' ` m In < dap �9 I R xALBEMARLE COUNTY,vi.... mom gig x, o , N x INLET DRAINAGEAREA 111. o ' ;' MAP • • • NWA010VD 1/ A+' � NW CD -` 010) CO .a _1 n V m to v O O O G) G) G) O G) C) G) C) ) m N W AO1 CO V .. N W A 0) A .. -N N O 0 N -1 O n 11 A 0 0 C O O N to o 0 C o p O O X. 7 V O O O C) O ...N N to a CC.) a at O L.V p _' W 1 . o1 o A m 0) to0000. . . . 00 o 11311311113111 n IIIIIUItUIi !1fl 00 000000 p V 113131043 _ _0 f!: : 0 ' �":' p D A o) •N) O A 0) ON) w f0 O O A a W a O) O) O) 0) O1 01 m S -{ 01A N-a CO 0)P40 C z m1 ao) amab)VV a V • _ W 0)V V Co f0 C.. A -a 2 O A N F. CO VO)A in pspp a y p. +V Wa) N N N -- ZI A y o W CO V O) a O) A W O1 p) p pV1 CVO en cn m CO N CCa C COCD V• N Q p1 01 01 0) CO O1 0) a O O E NA coO.QOf ^07 W N O Ww :, m )o 2C°a m CD V A CVO aW)VO p011 O co f� 11111111 m400 0 0 0 0 0 0 0 0 o C -a N A O) W V CO (0 01 )Oo 1O A A. CO O)CO l0 taa AoCOVA. aom)o0) m pt • tiN V,, a CO CO CO OI w .Nimv P -. -a W p)a o00000000 0 0y Z O G) "1 Ch N +.a p .a-s .a A) NfN o 0)p11 01 NW 0 0 'p C c m CO CO CO CO CO CO O1 01 O1 11:0.4": N1111 2p.mJWO) NOPVaP10QW N CO CO OV) -aNOA) W A .'aaa VS i A a n 0 Cy 'VG � 1 A A1011011101111:1111H0 O O1 aaa0mm a 01 tJNIJ(J C) fJA /0 al p) s :Iiiiiiiiiiiiiii ° D O ^• � PPIW S▪n vi ::: A•fail A3 p, Y • m .oD xiz L. 4? cp000pp p L. a A1. 0 � ( CQ4l -akIVAN L. 0 1- mt fh ',,$�N:a co C)N L.O O O O oa pp 0 Z1 ANaZ °4`yl -' in L. A C.) N� m m 7 ^n 6 p L • M m P.'. 0 . m co ° -1 y T y m CO STORMWATER INLET COMPUTATIONS GLENWOOD PHASE 2 9/27/2004 Terra Partners-AGF INLET SEE HY-22 OUTPUT 2 3 m oa o ° ton C) 0 IL > r. m ' yy .p a C e 01 .0 C V ` ?+ d N l0 �.. O t v x T v d o m >> ai L° a (� x y C 3 3 0 a o =Z F- J U) G C,1 0 C1 - U' a O U) U) F- s U) U) W C a -O (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) Remarks T3 3A 2.5 - 0.14 0.61 0.09 0.09 4.0 0.34 0.00 0.34 SAG 0.035 2.39 2.0 1.00 0.34 0.00 0.26 0.62 SUMP R2 2B 6.0 - 0.17 0.74 0.13 0.13 4.0 0.50 0.00 0.50 0.039. 0.010 1.64 2.0 1.22 0.083 8.30 0.92 0.46 0.04 OVERFLOW TO Q1 Q1 2B 6.0 - 0.30 0.76 0.23 0.23 4.0 0.91 0.04 0.96 SAG 0.010 12.35 2.0 1.00. 0.96 0.00 0.35 0.83 SUMP P1 2B 6.0 - 0.19 0.87 0.17 0.17 4.0. 0.66 0.00 0.66 0.035 0.020 1.85 '2.0 1.08 0.083 4.15 0.88 0.58 0.08 OVERFLOW TO 01 01 2B 6.0 - 0.22 0.88 0.19 0.19 4.0 0.77 0.08 0.86 0.035 0.020 2.21 2.0 0.90 0.083 4.15 0.82 0.71 0.15 OVERFLOW TO G1 G1 3B 6.0 - 0.47 0.80 0.38 0.38 4.0 1.50 0.15 1.65 SAG 0.020 8.86 2.0 1.00 1.65 0.00 0.39 0.93 SUMP G5 '3A 2.5 - 0.14 0.90 0.13 0.13 4.0 0.50 0.00 0.50 SAG 0.020 5.41 2.0 1.00 0.50 0.00 0.32 0.76 SUMP G5.TXT TLij4 FHWA Urban Drainage Design Program, HY-22 V Drainage of Highway Pavements Inlets on Sag , Date: 11/15/2004 Project No. . Project Name. : computed by . Inlets on Sag: Curb-opening Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0200 Sw Gutter Cross Slope (ft/ft) 0.0830 n Manning's Coefficient 0.013 W Gutter width (ft) 2.00 a Gutter Depression (inch) 1.00 Inlet Interception Inlet Type *Sag* Curb-Opening T Width of spread (ft) 5.41 L Curb-opening Length (ft) 2.50 H Curb-Opening Height (in) 5.00 d_curb Depth at Curb (ft) 0.318 Qi Intercepted Flow (cfs) 0.500 0 Page 1 G1..TXT FHWA urban Drainage Design Program, HY-22 ( i Drainage of Highway Pavements Inlets on Sag Date: 11/15/2004 . Project No. . Project Name. : Computed by . Inlets on Sag: Curb-opening Inlet Roadway and Discharge Data cross Slope Composite/Dep sx Pavement Cross Slope (ft/ft) 0.0200 Sw Gutter Cross Slope (ft/ft) 0.0830 n Manning's Coefficient 0.013 W Gutter width (ft) 2.00 a Gutter Depression (inch) 1.00 Inlet Interception Inlet Type *Sag* Curb-opening T width of spread (ft) 8.86 L Curb-Opening Length (ft) 6.00 H Curb-opening Height (in) 5.00 d_curb Depth at Curb (ft) 0.387 Qi Intercepted Flow (cfs) 1.650 0 Page 1 P1.TXT I (_ FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Grade Date: 11/15/2004 Project No. . Project Name. : Computed by . Inlets on Grade: Curb Opening Inlet Roadway and Discharge Data Cross Slope Composite S Longitudinal Slope (ft/ft) 0.0350 Sx Pavement Cross Slope (ft/ft) 0.0200 Sw Gutter cross Slope (ft/ft) 0.0830 n Manning's Coefficient 0.013 W Gutter width (ft) 2.00 a Gutter Depression (inch) 1.00 Q Discharge (cfs) 0.660 T width of Spread (ft) 1.85 Gutter Flow Eo Gutter Flow Ratio 1.000 d Depth of Flow (ft) 0.15 ✓ Average Velocity (ft/sec) 3.98 Inlet Interception Inlet Type Curb-opening LT Length for 100% Inteception (ft) 8.70 L Curb-Opening Length (ft) 6.00 e Inlet Efficiency 0.878 Qi Intercepted Flow (cfs) 0.579 Qb By-pass Flow (cfs) 0.081 0 Page 1 Q1.TXT (e+ FHWA Urban Drainage Design Program, HY-22 Q I Drainage of Highway Pavements Inlets on Sag Date: 11/15/2004 Protect No. . Project Name. : Computed by . Inlets on Sag: Curb-Opening Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0100 Sw Gutter Cross Slope `(ft/ft) 0.0830 n Manning's Coefficient 0.016 W Gutter width (ft) 2.00 a Gutter Depression (inch) 1.00 Inlet Interception Inlet Type *Sag* Curb-opening T width of Spread (ft) 12.35 L Curb-opening Length (ft) 6.00 H curb-opening Height (in) 5.00 d_curb Depth at Curb (ft) 0.353 Qi Intercepted Flow (cfs) 0.960 0 Page 1 R2.TXT (� I e/- CZ/ FHWA Urban Drainage Design Program, HY-22 Drainage of Highway _ Pavements Inlets on Grade Date: 11/15/2004 Project No. . Project Name. : Computed by . Inlets on Grade: Curb opening Inlet Roadway and Discharge Data Cross slope Composite S Longitudinal slope (ft/ft) 0.0390 Sx Pavement Cross slope (ft/ft) 0.0100 sw Gutter cross Slope (ft/ft) 0.0830 n Manning's Coefficient 0.013 W Gutter width (ft) 2.00 a Gutter Depression (inch) 1.00 Q Discharge (cfs) 0.500 T width of Spread (ft) 1.64 Gutter Flow Eo Gutter Flow Ratio 1.000 d Depth of Flow (ft) 0.14 ✓ Average Velocity (ft/sec) 3.01. . Inlet Interception Inlet Type Curb-opening LT Length for 100% Inteception (ft) 8.00 L Curb-opening Length (ft) 6.00 e Inlet Efficiency 0.917 Qi Intercepted Flow (cfs) 0.459 Qb By-pass Flow (cfs) 0.041 0 Page 1 T3.TXT FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 11/15/2004 Protect No. . Project Name. : Computed by . Inlets on sag: curb-opening Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0350 Sw Gutter Cross Slope (ft/ft) 0.0830 n Manning's Coefficient 0.013 w Gutter width (ft) 2.00 a Gutter Depression (inch) 1.00 Inlet Interception Inlet Type *Sag* Curb-Opening T width of Spread (ft) 2.39 curb-opening Length (ft) 2.50 H Curb-opening Height (in) 5.00 d_curb Depth at curb (ft) 0.263 Qi Intercepted Flow (cfs) 0.340 0 Page 1 & B Chapter 9-Storm Drains .: a 2,_ c__F Appendix 9C-13 Performance Curve DI-1 in a Sump ,--T----------_------.-- , :—_____________________ NIIMINIIIIIMIN1111111111 TAMIIIIIIIIIIIIIIIIIIIII 111111111111111111111111111 r INNIENNI11111111111111111 1111111111111111111111111111111111MIRMIA IIIIIIIIIIIIIIII 111111111111111111111 MI 111111111111111 lissommoinastra imam 11111111111J III 11111111F 9 min : 11111 .vc,, cAl -.,-,, Q Nil , 111; IA . , , . 0 La_ 111=1111•115111111111111111111/4111111111.m 111111111•111111•11111111 • iii 11.111111111111121111111111111111111PAIMME 111•11111111,1111111111111= 1 numminnivi =111111111111111111111•1111111111111 ; •111111110111111111111FAI 1111111111111111111111111111111111 0 a-, 1 1111121111111111111111 ,.IIIIIIIIIMIIIIIHIIIII 1 1111111111111111 . IIIIIIIIIII iiiiriiilli j, NEU . ..,- 111Prall1111 - , . ing ! : OPEN AREA = 2.33 FT2 . , PERIMETER = 9_00 FT 5 I 121 i 4 - .50 11710 DISCHARGE CCFS ) Source: VDOT . , 1 of 1 VDOT Drainage Manual 11_11.) Lc(' U7 Chapter 9—Storm Drains = 0 to 9 q 1 6 Appendix,9C-13 Performance Curve D1-1 in a Sump • --/1•. •_ _�•�1•�.. I T IIIIC( 4% 11111 1114�J� 1111111_ le0. „ LL ■ All __ ., .1It- li -. . . ,_ i . 0 cL ; INIIIIMIIIENNIIIIIIIIMIIIIMIIMI IIIMINIIIIIIIIIIIIIIIIIIII 0Lu ����11- �����5 ®•1lM111•11111II '•••111111/ ; INIE1111111111,11 •S11111111•111 r IIIl- ti,II iii 111 zi„ a17 OPEN AREA =2.33 FT2 PERIMETER = 9.00 FT` DISCHARGE r CrFS i Source: VDOT of I VDOT Drainage Manual , • . . . ,e2 „.. Chapter 9—Storm Drains 00 z— Z. 0 `1, • Appendix 9C-13 Performance Curve D1-1 in a Sump ,- w . 11111111111=1111111111.1111 r FAM111111111111M111111 ! :i IIIIIIIIIIIIIIIIIIMIIII I 111111111111111111111111M111111 i . 111M1111111111111101111110111111111111/A11111111111111111111111111 , . i • inillii i Wall111111111111111111 ! 111111111111111. - • 12111111111111111 :. I '1 1111111111111 , ‹,, 1111111111111111 i - (.)- , I () (j. cA.,_ Ion 4\,- ., ,_. . , „,_ 1 - ._. , , i - - ,.,,,, . i , 1110 : ,. . 01 Li i ., 1110111111111111111111111111111,1111/1.211M. 0 ml tu AE 0 i t 11111111111111111111111111111101111111111111111M•1111IM101111I1N11111I110II1I 1!I 1111111111111111111111 f ! 1 11111112111111111121 - 111111111111111111111 ' O. 5 : 1 ''.' 11211111111J111 IIIIIIIIIIIII ,,, 1 Mill1111111111 1111111 ! „it -, 0. ., i ... 1 I II-11111 • - 111111 s . .. .II • OPEN AREA = 2.33 FT2 i PERIMETER = 9.00 FT . .1 . 5 10 50 100 fri' .0 ,...- DISCHARGE ( CFS Y ' . Source: VDOT z ; .. . '1 of I ' VDOT Drainage Manual GLENWOO 1 STATION PHASE 2 STORMWATER/BMP SUMMARY AND CALCULATIONS PHASE 1 CALCULATIONS: DaaaaaaaDaa v -n n 'a - N W A 01 CO V CO CO G -�aN — N coN iN W -� -aN --aa v 0 0 '_0 w 2 Z - N W A010) rCD01a0p ; .aim W CO A + N Dt7 D N O -1 m O Xi a t y + CO Z O -f C/ O f71 O O O O O O p O 0 0 A O O O O O i N W 0 0 O n O 01 0) IN 0 0) 0) IV IN O 0 to O 4 N C.) C.) L. i '01 b) i bpi�y CO 01 O N O V W O tD N tD -a 0 0 0) -a -a 0) O 14. g tD 00) v m D O N 0 O o 00000000000 00 M4'3 O O 0 0 0 O O O O O C C 0) CO hobo 00 co CO G CO in O En in at bob) CO .1 .ii 'O 001001 as A O 0 Fri OI 0) o 01 0) 01 O o 01 m(n 0) o O) O m -n N co p a L. O 0 �0a, p O, O O O O O O A 0 CO 0 0 O -. -► 'N O O O O 0 N O A W IV N co O L. O is y 0 CO O O i 10 _ . Z A co CO N O CO CO Co O V Co V 01 #-Oa CO N 001 n CD A N NCO CO CO P A pAp�� yAya� A 0 0 0 0 W Co -a I ita O O O D D 0 W 0 0 -.O N V A --CA V V A to 0 V O CO V -a L.N 001 i -Oa N 001 Ili P O. -a 1 Cao j -a-a00000000 0) Sn 01 to co Co Co V sn0) p) n -'IZ V f0 IN N CO b) 0) A Ea la I. 0 soO A. 0. la0 O O N Cs O 2 'S m m � A V 01 0) 01 O) Into 01 01 01 O) V .) O) V O! O) Of A V V V Z - CO L. 1a A is 01 to • cm C) C) C) V O L. (D L. :a La i A O i L. ,m- _ -11 M D , r r- co70 co hl oa In co 0) A A A,p N N N N N tD W Of V tll A Q) O O1 A N hi -a N C CO iD i { W N O O C co 11 01 Of -aW W CO0 CO i i coO N CO Q� Z lD N N g COo W O CO0 V V 10 ?i 0 -n 1) A A A A A A A 0) O) 0 01 04 0) A A A A A A 01 to C Z 0) CO V V V CO CD 00 to O O O I tD W V CD O) N 01 co -a A 0) N V COD eta O —CO W .001 W N CO0 0 213 m V O la C) C) N 01 A. N O co f0 01 7A OI CO N OOf tOT1 O C m .�.� 01 0 CO O) A 01 CD W CA w 0 W O O O � ' cn A A A 1 A A ? A A O) 0)01 0) Ot AA AAA A0) 01rErm 01 01 V V V V W iD tD tD 0 0A 01 -a A V <D O) N 01 W - A O a V V CVD CVO CO— W 0) O - m 0to O V C) V V COb) 014) fDO) O) O01 N - � Z � O O tD O) A 01 CO W 0) wo w COO 00)) 01 A 00) 0)) Om 0 W V W •CO UP CD C4 ti is y O O) 01 O A A UOD CCO -a .,A.CVD _OOf f0D C o N fD V A 100 N .a T m o 0 0 0 0 0 0 0 0 0 0 O O O O O 0 O O 0 O O O 0 N O 2 01 0) -a. A A N N N pa A pa pa pa tos -a .a CO ps so co co r o in 0) O co V V y V Co Co OO 00 •LVD 0O C ? - CO Cs Ca L. .ei o O W N 0) A Al CO CO CO CO --I A 0 0 10 O O CO .D m CO --1 W Al Co CO CO CO W CO N N Al N N -a -a .a te ,a -a — j Z 0 0 co co O O O 0 A A A A A t11 01 to N A A W a0 0) 01 01 A S XI / �v coHhIiI1t , 0 N V CD .i t000 Q! W N ...' iO) AA O N0 0) f0IDiIn rz IN, O) tD sW tDt0 ?' W O) 0) fDW Opv f1'fl A W O) W ..a .a 0) W A W �_ _. .a 01nD CD O iON O AN IDi C7 V CfOi _. 7, m O N W 01 O) O O O CD N N O W 01 a0 co C. v (0 1-' yov O o 000000000 o0 00 oOo o ZO m N L. -. :. 0001 is L. i _. :a NN 0).A L. o O ON 0 V (Z) r Rzl -Dj(mj Z TT (/� O -a -• -a-a0000000 00 00 coop• D ?� m -a 0 so - A Ea la N tD b) O) A W la L. A N t0 A :a L. 0 CD OD N :a Co n 3 QP 7 0 c) m w o IT m. is! ,E H • m � � St» "4 co � 0b ' 0 S' " A z C' LA ...If) 7:1.5e j_ �.z fc 5 Short Version BMP Computations For Worksheets 2-6 Albemarle County Water Protection Ordinance:Modified Simple Method Plan: GLENWOOD STATION Water Resources Area: Development Area Preparer: Alan G.Franklin, PE Date: 10/29/20031 Project Drainage Area Designation DA 1 L storm pollutant export in pounds, L=[P(Pj)Rv/12][C(A)2.72] Rv mean runoff coefficient, Rv=0:05+0.009(1) Pj small storm correction factor,0.9 . I percent imperviousness P annual precipitation,43"in Albemarle • A project area in acres in subject drainage area, A_= _ 9.47 C pollutant concentration,mg/I or ppm target phosphorus f factor applied to RR V required treatment volume in cy,0.5"over imperv.area= A(I)43560(0.5/12)/27 ' RR required removal, L(post)-f x L(pre) %RR removal efficiency, RR100/L(post) Impervious Cover Computation(values_in feet&square feet) c Item pre-development .Area post-development Roads Length Width subtotal _ Area Length Width subtotal 0: 0 0 t 0- 0 0 _0 ... . 0 _ ._0- 0' 0 0 0 -0 _ ._. 0 , Width0 0 ;; - Driveways Length no. , subtotal _gam 0 and walks 0 00 LenWidth no. subtotal 0 - --._. -0 .._. 0_ . _ 0 o 0: 0 0 Parking Lots 1 2 0 0 0 0 3 4 f." 3 4 • Structures 0 _ 0- 0 Area Area_no. subtotal ' no. subtotal 0 0. 0.. - 0 0. 0 O. •- -- 0 0 _ - 0; 0 . .." _- 0 Actively-grazed pasture& Area D' 0 0 0 Area - 0• 0 yards and cultivated turf *O:x 0.08= 00 x 0.08=Active crop land Area "" .-- ,. ..d 0 Area - . . 0x0,25= 0 x0.25= 0 Other Impervious Areas Impervious Cover 0 236625 O% 57% RV(post)'__"- V l(Pre)..._ I(post) • 0.57 365.2 New Development(For Development Areas,existing impervious cover<=20%) C f I(pre)* ` Rv(pre) L(pre) L(post) RR .. .%RR 3 Area Type . • 0.70 -.1;00: ,.20% 0.23 ; 13.37 • 32.92 ..1 _9.55 59% Development Area 0:35 'LOP, ` _ .0%' 0.05 1.45 16.46 ; 15.01 91%1 Drinking Water Watersheds -0.40 _ 21:00 :- JP* 0.06 1.96 18_81 " 16_85 ' .. 96%1 Other Rural Land 'min.values Redevelopment(For Development Areas,existing impervious cover>20%) C f I(pre).' Rv(pre). L(pre) L(post)- -RR %RR `Area Type 0 70-. 0:90. 26% 0.23 13.37 , 32.92 , 20.89 . " .. ... 63%'s DevetopmentArea b 85•.... 0%: 0.05 1.45 16.46 15.22 92%j Drinking Water Watersheds 0.40 0.85' _ -1% 0.06 1.96 18.81 17.15 '91%; Other Rural Land Interim Manual,Page 70 rev.31 March 1998 GEB Phac,,e._ 1 (4 .Y 5 l/,/ "R"rarn V V War r G I Q�� iod:or, U I 4-;,n0.+C � : - a-�- (?6.5e_ 1 z, 9.171 ni0Va• /at) bi;r'e 7 ; o . Vow 1 - Meet T3M ? iZetta;-€-9e- -fr c +0 LA-I; ! Ze_ _Se_ 4reo ooF — Dj 7Y,9 Z6./Iaces F�e„�gin$� Pa+ue-oe,1-1- H 109 i L( fF a friine, 0% % e(.J vi° / 9, Ste Z sf = 6/. 5 ,-ng ?no+ 5e- Z l npev oy+5 Arem 'hod I o$8 Roe. e_rit — sec. rn:re�e�t 23-7/817 x o.o5 = 11 l �-- Vha . 66, Rp 3 x 0.0 5 = i 4-71,07-0 bikiq -)s-y" a 0j. a1 qr1''°ri' If., Q u i iw(i { - )"a✓144 --i js' 1 bg 11 < As 'Z i 04 iZ / c/9 sl"Iv -": to JO414°3 v`- �,��� '_� _��� - J-s c S 9- --- '-15 Id2 -� � Ja fv"j v Jai;) -�,g - �S l2 // - ! ' 3r ) , r{ I/ 1% )/ ___4S -z/z/l_ 45,7 Cf>f- / 10!7✓itvaia) vi >cc/ A/I 5-00 Q og2 s er0,24.L ��a erg_.3.l!II- ra/S- 45 044/� ilf #.?fy von yj -a {_o(