Loading...
HomeMy WebLinkAboutWPO200900013 Review Comments Stormwater Management Plan 2009-09-21OF AL O ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer: Owner /Applicant: Plan received date: Rev. 1: Rev. 2: Date of comments: Rev. 1: Rev. 2: Reviewer: Van Dine Plaza [SDP200900024 & WP0200900013] Justin Shimp, PE; Dominion Development Resources [email: j shimp @ ddrva.com] Auto LLC 9 April 2009 1 June 2009 7 August 2009 30 April 2009 26 June 2009 21 September 2009 John P. Diez — Engineering Technician A. Final Site Plan 1. Please provide source and date of topographic verification. [ 18- 32.6.6] (Rev. 1) Comment has been addressed. 2. Some of the grading in the parking areas exceeds 5% slopes. [18- 4.12.15C] (Rev. 1) Comment has been addressed. 3. Some of the grading in the travelways adjacent to the parking lots exceeds 10% slopes. [18- 4.12.17A] (Rev. 1) Comment has been addressed. 4. Please adjust the loading space to meet 12'X25' requirement on the northwest part of the site. (Rev. 1) Comment has been addressed. 5. All travelways without parking must be 20' wide measured from curb faces. (Rev. 1) Comment has been addressed. 6. Sidewalks abutting parking must be 6' wide, or bumper blocks are provided. (Rev. 1) Comment has been addressed. 7. Please provide guardrails with VDOT designations shown for retaining walls next to parking or travelways. [18- 32.7.2] (Rev. 1) Comment has been addressed. 8. Safety railings must be shown for retaining walls over 4' high. (Rev. 1) Comment has been addressed. 9. Please provide a retaining wall detail. (Rev. 1) Comment has been addressed. B. Stormwater Management Plan 10. Please proviae routing models for the stormwater detention facilities. (Rev. 1) Comment has been addressed. 11. Please provide impervious area and removal rate calculations. (Rev. 1) Comment has been addressed. However, the areas on the newly submitted simple method spreadsheet do not match the areas on the plans. Albemarle County Community Development Engineering Review Comments Page 2 of 3 (Rev. 2) Please update the spreadsheet so the pre and post development acreage equals the drainage area of the detention facility. The percent impervious for pre and post should also be updated accordingly. 12. Please provide Albemarle County general stormwater notes. (Rev. 1) Comment has been addressed. 13. A completed copy of the Standard Stormwater Management Maintenance Agreement and fee for recordation for the stormwater facilities on TMP 45 -100 required prior to final approval. [17 -304E] The forms and instructions can be found on the Community Development Department website on www.albemarle.org. (Rev. 1) Comment has been noted. (Rev. 2) Comment has been addressed. 14. Please provide adequate channel analysis (MS -19) for the proposed outfall. (Rev. 1) Comment has not been addressed. (Rev. 2) The adequate channel analysis has been reviewed. The following modifications are required before approval can be given: a. Adequate channel analyses must be evaluated using the 24 hour storm (SCS). This would mean that the 24 -hour storm must be routed through the detention facility. b. Each segment of the channel cross - section must have a specific n- value, permissible velocity, and calculated velocity. For instance, in cross section A, the side slopes is vegetated and not lined with coarse gravel. For other sections of the stream, the side slopes are exposed earth. c. Current Erosion and Sediment Control law requires that the adequate channel analysis be performed to the point where the developed area is equal 1% of the watershed of the channel. However, for county approval, the analysis only needs to be performed to within 100ft of the structure at the VDOT ROW. There are several channel cross - sections through this section of the stream that appear to be exhibiting erosion and these sections should be analyzed. d. Because of the severe angle of the release from the detention facility, riprap into the stream channel to the opposite bank will be necessary to protect the stream from scour. Approval from the Army Corps of Engineers will be needed for this work. Revisions to the adequate channel calculations (a, b, and c) will not be needed if the applicant provides one of the following: - Provide extra storage and a smaller orifice size in the detention facility to reduce the 2 and IO year discharges to I cfs and 2 cfs. - Obtain the necessary offsite easements and provide additional riprap on all sideslopes that are currently exposed soil. Some sides would need to be modified so that the slope is not steeper than the maximum grade allowed for riprap (1 -112 : 1). Work within the existing stream will need to be approved by the Army Corps of Engineers. 15. Please provide calculations for the existing 24" culvert at the north side of the site. (Rev. 1) Comment has been addressed. 16. Please provide a Detention Compliance Table. (Rev. 1) Comment has been addressed. 17. Post - Development drainage areas do not match inlet drainage areas. (Rev. 1) Comment has been addressed. 18. Please provide a blow up plan view of the riser including invert shaping, if applicable. (Rev. 1) Comment has been addressed. C. Erosion and Sediment Control Plan Albemarle County Community Development Engineering Review Comments Page 3 of 3 19. Please extend the diversion dike on the northwest side of the property up to contour 526. (Rev. I) Comment has been addressed. 20. Please provide a stockpile location. (Rev. I) Comment has been addressed. 21. Please provide staging or parking area. (Rev. I) Comment has been addressed. 22. Please show the outlet protection for the Sediment Trap on sheet E -3. (Rev. I) Comment has been addressed. Once these comments have been addressed, please submit two (2) copies of the revised plans, calculations, and narratives to Current Development Engineering. Current Development Engineering is available from 2:30pm — 4:OOpm on Thursdays to discuss these review comments. Please contact Amy Pflaum at 434 - 296 -5832 or apflaum @albemarle.org to schedule an appointment. CDE3_fsp_esc_smw_JPD_Van Dine Plaza_PHIL.doc