Loading...
HomeMy WebLinkAboutSDP200800118 Review Comments Final Site Plan and Comps. 2009-08-11SDP - 2008 -00118 Emanuel Episcopal Church Megan Yaniglos From: DeNunzio, Joel D., P.E. [ Joel .DeNunzio @VDOT.virginia.gov] Sent: Tuesday, August 11, 2009 10:02 AM To: Megan Yaniglos Cc: Amy Pflaum Subject: SDP - 2008 -00118 Emanuel Episcopal Church SDP - 2008 -00118 Emanuel Episcopal Church Megan, Page 1 of 2 VDOT's previous comments for the above site plan have been properly addressed. A Land Use Permit will be required for work within the Route 250 right of way. Thanks Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 ioeL den unzio(�bvdot.viroinia.00v From: DeNunzio, Joel D., P.E. Sent: Thursday, June 18, 2009 8:16 AM To: 'Elizabeth Marotta' Cc: 'Amy Pflaum' Subject: SDP - 2008 -00118 Emanuel Episcopal Church SDP - 2008 -00118 Emanuel Episcopal Church Elizabeth, I have reviewed the above site plan and have the following comments: 1. Please include a typical section for the turn lane on Route 250. 2. Commercial entrances should be labeled as CG -11. Please include the CG -11 detail and show the entrance profile for the proposed entrances. Curb and gutter does not need to be provided as shown in the CG- 11 detail but the grade changes for the entrance needs to be in accordance with the detail. If you have any questions or comments, please let me know. Thanks Joel 8/11/2009 SDP - 2008 -00118 Emanuel Episcopal Church Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 ioel.denunzio(c vdot.virainia.aov 8/11/2009 Page 2 of 2