Loading...
HomeMy WebLinkAboutWPO200800104 Review Comments Bond Estimate 2009-08-14BOND ESTIMATE - EROSION CONTROL PROJECT NAME: EMMANUEL EPISCOPAL CHURCH PROJECT NUMBER: WPO200800104 DATE OF ESTIMATE: 08/12/09 ESTIMATE BY: JPD BASED ON: WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 3.7 $1,500.00 $5,550.00 SILT FENCE LF 350 $5.00 $1,750.00 SAFETY FENCE LF 0 $3.00 $0.00 TEMPORARY FILL DIVERSION LF 0 $3.00 $0.00 DIVERSION DIKE LF 429 $3.00 $1,287.00 TEMPORARY SLOPE DRAIN LF 27 $20.00 $540.00 SEDIMENT TRAP A ACRES 2.6 $1,000.00 $2,600.00 SEDIMENT TRAP B ACRES 0.87 $1,000.00 $870.00 SEDIMENT BASIN 1 ACRES 0 $1,000.00 $0.00 CULVERT INLET PROTECTION EA 1 $500.00 $500.00 INLET PROTECTION EA 0 $200.00 $0.00 OUTLET PROTECTION EA 6 $200.00 $1,200.00 EC -2 & 3 DITCH PROTECTION LF 0 $10.00 $0.00 RIP -RAP LF 0 $55.00 $0.00 CHECK DAMS SQ.YD. 0 $30.00 $0.00 STREAM CROSSING TYPE I EA 0 $1,000.00 $0.00 STREAM CROSSING TYPE II EA 0 $3,000.00 $0.00 STREAM CROSSING TYPE III EA 0 $5,000.00 $0.00 PAVED CONSTRUCTION ENTRANCE EA 1 $2,000.00 $2,000.00 SUBTOTAL 16297.00 PROJECT MANAGEMENT LS 15% 2444.55 TOTAL 18741.55 PROJECT ADMINISTRATION 10% 1874.155 BOND AMOUNT REQUIRED 20700.00 Spreadsheet last revised: 12-5-01