Loading...
HomeMy WebLinkAboutARB200900055 Review Comments Final Site Plan and Comps. 2009-08-05COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 August 10, 2009 Charles Luck, P.E. c/o Whitman, Requard & Associates LLP 9030 Stony Point Parkway, Suite 220 Richmond, VA 23235 RE: ARB- 2009 -55: North Fork Regional Pump Station Project Tax Map 32, Parcel 6A Dear Mr. Luck, The Albemarle County Architectural Review Board reviewed the above noted item at its meeting on Monday, August 3, 2009. The Board, by a vote of 3:0 approved the request, pending staff administrative approval of the following conditions: 1. Add a note to the site plan identifying the height and color of the mechanical equipment and submit an actual color sample. The color shall be an earth tone that blends well with the surrounding environment. Add the following note to the site plan: "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." 2. Revise the building elevations to show a soldier course made of approved brick to relieve the expanses of blank wall. Soldier course to be flush with face of corner projections. Provide a material schedule on the architectural drawings identifying all the proposed building materials; include details such as color, manufacturer name and brand. Revised building elevations, received 8/3/09, are approved. 3. Include the cut sheets for the proposed lighting within the set of full size site plan /lighting plan drawings. Include the LLF calculations, the lumens, and the watts in the luminaire schedule. Indicate in the luminaire schedule the color and finish of all light fixtures and light poles for the proposed development. Dark brown, dark bronze, or black are appropriate colors for free - standing pole mounted light fixtures in the EC. Revise the manufacturer note in the luminaire schedule for Fixture A to correspond to the cut sheet. Reduce the height of light fixture A to 15'. Include the following note on the photometric plan: "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle." Maintenance /utility light will be activated by a combination timer /motion sensor. 4. Show all of the proposed utility lines and their easements on the landscape plan. Highlight or lightly shade the easement areas so they are clearly identifiable. Identify areas where no plantings are allowed on the applicant's property. 5. Revise the landscape plan to show small to medium evergreen trees or deciduous shrubs with low, dense branch patterns interspersed with the shrubs and shade trees proposed along the EC and in front of the development, specifically within the 50' easement that is located north of the proposed driveway and within the easement located south of the generator. 6. Revise the landscape plan to shift the southern red oak to avoid conflict with the overhead utility line. 7. Revise the plant schedule to show that the shrubs proposed on the landscape plan will be at least 24" in height at planting. 8. Add the following note to the landscape plan: "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." 9. Eliminate the proposed treeline on the Existing Landscape Conditions plan on Sheet C -11. Please provide: 1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing and an ARB approval signature panel. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staff's review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Eryn Brennan Senior Planner Cc: Albemarle County Service Authortiy (Tom Garrison) 168 Spotnap Road Charlottesville, VA 22911 University Of Virginia Foundation P O Box 400218 Charlottesville, VA 22904 Gerald Gatobu, Current Development COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Eryn Brennan DATE: PROJECT NAME: ARB2009 -0055 North Fork Submittal Type Requiring Revisions ( ) indicates submittal Code County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan (MP) 2 Eryn Brennan Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private/ public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment) (FSP) Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB2009 -55 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 2 Eryn Brennan