Loading...
HomeMy WebLinkAboutSDP200900060 Review Comments Major Amendment, Final Site Plan 2009-08-19 (3)II COMMONWEALTH of VIRC NIA DEPARTMENT OF TRANSPORTATION CHARLOTTESVILLE RESIDENCY OFFICE 701 VDOT WAY CHARLOTTESVILLE, VA 22911 DAVID S. EKERN, P.E. COMMISSIONER August 18, 2009 Mr. Glenn Brooks Department of Engineering and Development 401 McIntire Rd. Charlottesville, VA 22902 Subject: Site Review Meeting Comments August 2e, 2009 site review meeting Dear Mr. Brooks: Below are VDOT's comments on the Site Plans for the August 201", 2009 Site Review Committee Meeting: SDP - 2009 -00057 Harris Garage- Waiver (Gerald Gatobu) • No comments SDP - 2009 -00058 Luck Stone Corp. Proposed Entrance and Office Building- prelim (Megan Yaniglos) • VDOT is currently reviewing options for replacement of the Route 250 bridge to the east of the proposed entrance. The entrance plan and the bridge plan will need to be coordinated to ensure no conflicts will occur between the two plans. • VDOT is ready to install the signal when the entrance is constructed and will need a 3 month advance notice of the opening of the entrance to ensure the signal construction is complete. • Please indicate the purpose of the gate. Will it be open and free flowing during business hours or will all traffic have to stop at the gate to enter the site at all times? SDP - 2009 -00060 Martha Jefferson Hospital —Maior (Summer Frederick) • There is not currently a ditch along State Farm Blvd in this section and all drainage from the road and shoulder will flow over the proposed parking lot. This may cause problems and should be addressed with the plan. WE KEEP VIRGINIA MOVING • The new parking lot may affect the TIA for the project. In accordance with the Chapter 527 regulations, a letter of validity for the traffic study needs to be submitted for this change. SUB- 2009 -00101 Arthur M. & Marie Pealer Feiner —Final (Elizabeth Marotta) • No comments Please request the applicants provide a written description of revisions with re- submissions. If you have any questions or comments, please contact me prior to sharing these comments with the applicants. Sincerely, Joel DeNunzio, P.E. Staff Engineer VDOT Charlottesville Residency 434 - 293 -0011 WE KEEP VIRGINIA MOVING