Loading...
HomeMy WebLinkAboutSUB200900108 Review Comments Miscellaneous Submittal 2009-09-01II COMMONWEALTH of VIRC NIA DEPARTMENT OF TRANSPORTATION CHARLOTTESVILLE RESIDENCY OFFICE 701 VDOT WAY CHARLOTTESVILLE, VA 22911 DAVID S. EKERN, P.E. COMMISSIONER September 1St, 2009 Mr. Glenn Brooks Department of Engineering and Development 401 McIntire Rd. Charlottesville, VA 22902 Subject: Site Review Meeting Comments September 3rd, 2009 site review meeting Dear Mr. Brooks: Below are VDOT's comments on the Site Plans for the September 3rd, 2009 Site Review Committee Meeting: SDP - 2009 -00062 Free Bridge Offices - Prelim Site Plan (Elizabeth Marotta • A basin is being removed from this site in order to construct the new parking lot. If it is a temporary silt basin, there are no concerns, but if it a permanent stormwater management basin, there is cause for concern due to an increase in peak discharges going into the storm system under Olympia Drive. SDP - 2009 -00065 Old Trail Village Block 3 (Phase B)- Prelim. (Megan Yaniglos) • Claremont Lane has a 20 mph design speed and the corresponding site distance is 225'. The connections to Claremont do not have adequate site distances shown. Sight distance triangles need to be contained within easements. The sight lines shown appear to cross structures or be very close to structures. • In accordance with VDOT's Road Design Manual, Appendix B, page B -15, intersections entering from the same side of the major street should have a spacing of 500 feet but with lower traffic volumes can be spaced at 250 feet. The 14 foot private road easement does not meet the minimum criteria. • The proposed grading of the private roads appears to drain water to the proposed public road. In accordance with 24 VAC 30 -71 -90 The Minimum Standards of Entrances to State Highways, the water should not drain into the public road. • There is a clear zone easement along Old Trail Dr. that needs to be shown on the plan. WE KEEP VIRGINIA MOVING SUB- 2009 -00108 Old Trail Village Block 2 Subdivision (Megan Yaniglos) • The vacation of the right of way for the proposed public streets will remove these streets from qualifying for addition to the State Secondary Road System. In addition, this removal may result in other connecting streets not qualifying for state maintenance. Please request the applicants provide a written description of revisions with re- submissions. If you have any questions or comments, please contact me prior to sharing these comments with the applicants. Sincerely, Joel DeNunzio, P.E. Staff Engineer VDOT Charlottesville Residency 434 - 293 -0011 WE KEEP VIRGINIA MOVING