Loading...
HomeMy WebLinkAboutWPO200900031 Review Comments Stormwater Management Plan 2009-10-19OF AL O ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Little Yellow Mountain [WP0200900031 ] Plan preparer: Kirk Hughes and Associates [email: rob @khals.net] Owner /Applicant: Bowen, Richard H or Joan C Plan received date: 22 June 2009 Rev 1: 9 September 2009 Date of comments: 24 July 2009 Rev 1: 16 October 2009 Reviewer: John P. Diez — Engineering Technician A. Road Plan i. riease provide updated Albemarle County General Construction notes. Please refer to the Design Standards Manual. (Rev. I) Comment has been addressed. B. Stormwater Management Plan 2. Please provide Albemarle County General Stormwater notes and General Construction Notes for Streets. Please refer to the Design Standards Manual. (Rev. I) Comment has been addressed. 3. Please revise the acreage in the drainage divide sheet. One is 0.1 (where it should be 0.01) and the other is 0.3 (where it should be 0.03) (Rev. I) Comment has been addressed. C. Erosion and Sediment Control Plan 4. Please provide Albemarle County Erosion Control notes. Please refer to the Design Standards Manual. (Rev. I) Comment has been addressed. 5. To facilitate drainage to a sediment trap (as required); please relocate the construction entrance to the other side of the bridge. (Rev. I) Comment has been addressed. 6. Please provide dust control (DC). (Rev. I) Comment has been addressed. 7. Please provide culvert inlet protection (CIP) to all culvert inlets. (Rev. I) Comment has been addressed. 8. Please provide outlet protection (OP) to all culvert outlets. (Rev. I) Comment has been addressed. Albemarle County Community Development Engineering Review Comments Page 2 of 2 The Erosion & Sediment Control and Stormwater Management Plans (WP0200900031) submitted 9 September 2009 have received Engineering Review and meet Albemarle County minimum checklist items for approval. Please submit 5 paper copies of the Plan to Current Development Engineering. The E &SC bond amount is $9,900.00. The SWM bond amount is $16,200.00. The forms and instructions to post the Water Protection Ordinance Bond can be found on the Community Development Department Web site on www.albemarle.org. A completed copy of the Standard Stormwater Maintenance Agreement and fee for recordation for the stormwater facilities is required prior to final approval. [17-304E] The forms and instructions can be found on the Community Development Department Web site on www.albemarle.org. You may contact Ana Kilmer (Albemarle County Department of Community Development) at ext. 3246 for further information on bonding procedures and Maintenance Agreements. Once the E &SC bond and the SWM bond have been posted, you may contact the Department of Community Development to arrange a pre - construction meeting with a County Erosion & Sediment Control Inspector. Should the County Inspector find the limits of disturbance increased or the need for additional control measures required to protect the site, additional fees will be required. \\ Cob- dts01 \cityviewlnk\Docs \2009 \WPO \WPO200900031 Little Yellow Mountain \CDE2_esc_siuw_7PD_Little Yellow Mountain.doc