Loading...
HomeMy WebLinkAboutSDP200600041 Review Comments Final Site Plan and Comps. 2009-09-15C � vIRGIN� County of Albemarle Department of Community Development Memorandum To: Mr. Michael Myers, PE From: Elizabeth Marotta, Senior Planner Division: Zoning and Current Development Date: September 15, 2009 Subject: SDP 06 -041 Briarwood, Phases 1A -1, 1B -1, 4, and 8- Final The Current Development Planner has reviewed the submitted tentative final site plan referenced above (stamped 6- 19 -09). This final site plan is subject to the conditions of Preliminary Site Plan SDP - 2005 -055. The following are required before Planning will issue tentative final site plan approval: Provide required lighting note on the plan (under General Site Plan Notes is acceptable): "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one -half footcandle. " 2. Off -site easements were submitted to the County for review on 9/3/09; all required off - site easements must be approved and recorded prior to tentative final site plan approval. 3. Open space must be dimensioned with metes/bounds on the final site plan, per conditions of preliminary approval and Proffer #1. The open space does not have to be platted prior to final site plan approval; however, it must be dimensioned on the final site plan. In addition to obtaining tentative approval from Current Development Planning, the final site plan will not be approved and signed until the following approvals have been granted: 4. Albemarle County Service Authority approval, as well as RWSA approval. 5. Current Development Engineering 6. Planning E911 Please contact Elizabeth Marotta at 296 -5832 ext. 3432 if you have any questions.