Loading...
HomeMy WebLinkAboutSDP200900075 Review Comments Final Site Plan and Comps. 2009-10-05 (3)vIRGIN� County of Albemarle Department of Community Development Memorandum To: Elizabeth Marotta, Senior Planner From: John P. Diez, Engineering Review Division: Current Development Date: October 6, 2009 Subject: SDP200900075 Pleasant Grove New Sanctuary - Final Site Plan The final site plan for Pleasant Grove New Sanctuary, submitted on September 15, 2009, has been reviewed. Current Development Engineering has the following comments: General Final Site Plan Comments 1. Proposed contour lines must tie into existing contours. [18- 32.6.6] 2. Please provide date and source of the topographic information. All topography should be at least field verified by the designer within the last year. [18- 32.6.6] 3. Benchmark location, elevation, and datum for topography must be provided. An existing utility or other known position will suffice. [18- 32.5.6a] 4. Please provide all existing easements (access, drainage, sight, sanitary easements, etc.) with deed book references, locations, and dimensions. [18- 32.6.6] 5. All proposed slopes must be 2:1 (horizontal:vertical) or flatter. [Policy] 6. The plans mention a private sewer and a private well, but are not shown on the plans. Please show any existing and proposed utilities on the plans. [18- 32.5.61] 7. All entrances must have VDOT designations (PE -1, CG -9a, etc.) 8. Please show sight distance triangles at entrances. [18- 32.5.6] 9. Please note whether the culvert on SR 743 is existing or proposed. If it is a proposed culvert, then please include it within the limits of disturbance. 10. VDOT approval must be obtained for any plan affecting public right -of -way. 11. Curbing on all parking areas and travelways must have VDOT designations (CG -2, CG -6) 12. Please label all edges of pavement (where there is no curbing). 13. Parking areas cannot exceed 5% grade anywhere, in any direction. [18- 4.15c] 14. Proposed parking width x depth x aisle width must be 9'x 18' x24' or 10' x 18' x20' (where a 2' grass overhang is possible, parking spaces can be 16' deep). [18- 4.12.16] 15. Please indicate what material will be use for the parking area (gravel, asphalt, etc). [18- 32.5.6n] 16. Sidewalk detail or specifications must be provided. Sidewalk to be minimum 4" stone base and 4" concrete of 3000psi at 28 days, or stronger. [18- 32.7.2.8] 17. Please provide a typical retaining wall detail. A typical manufacturer's drawing for segmental block walls, or VDOT reference, is acceptable, with any applicable safety railings or guardrail shown. 18. Please provide Albemarle County General Construction Notes. Please refer to the Design Standards Manual. 19. Please provide drainage profiles and computations for the proposed storm sewer pipes. 20. Please provide curb inlet computations. 21. Please provide lines to all setbacks. Water Protection Plan Comments 22. Final Site Plan cannot be approved until Water Protection Ordinance application and fee together with Stormwater Management and Erosion and Sediment Control plans have been submitted, reviewed, and approved. 23. The plans can possibly be exempt for detention per Section 17 -314. However, detention might be required to address MS -19. \\ Cob- dts01 \cityviewlnk\Docs \2009 \SDP \SDP200900075 Pleasant Grove New Sanctuary - Final \CDE1_psp_JPD_09 -00075 Pleasant Grove New Sanctuary.doc