Loading...
HomeMy WebLinkAboutSDP200900078 Review Comments Major Amendment, Final Site Plan 2009-10-05ALg�,�� �'IRGINZ� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: SDP - 2009 - 00078, City of Charlottesville CTS Operations Center Plan preparer: Mr. Justin Walton, VMDO Architects Owner or rep.: Mr. Scott Hendrix; City of Charlottesville Date received: 14 September 2009 Date of Comment: 5 October 2009 Engineer: Phil Custer The major site plan amendment for the City of Charlottesville CTS Operations Center, received on 14 September 2009, has been reviewed. The engineering review for current development can recommend approval to the plan after the following comments have been addressed. The storm sewer line from structure 4 -1 to 4 -4 must be included in the phase A. 2. The underground cistern must be included in phase A. 3. If the biofilter south of Building A is to be included in Phase A, please include the storm sewer from structures 2 -1 to 4 -4 in Phase A as well. From the perspective of engineering review, I do not see any need for this biofilter to be included in Phase A. To simplify the phasing, I recommend that the phase line be moved closer to building A. 4. Please remove all ESC and Stormwater management sheets from this set. The addition of phase lines for Zoning purposes will not affect the WPO plans. If substantial deviations from either the Stormwater or Erosion Control Plans are required at this time, please submit a separate WPO application and appropriate fees for amendments to those plans. The changes to the plan as currently listed (modifications to utility lines and the addition of zoning phase lines) will not require a WPO plan amendment. File: El_fmj_PBC_SDP200900078_CTS construction revisions.doc