HomeMy WebLinkAboutWPO200900048 Review Comments Erosion Control Plan 2009-09-23� OF AL
,. vIRGI1`IZP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Abbington Crossing Clubhouse Replacement [WP02009000481
Plan preparer: Timmons Group [fax (804) 560 -13251
Owner or rep.: Abbington Crossing I LLC [fax (804) 747 -6742]
Plan received date: 16 September 2009
Date of comments: 23 September 2009
Reviewer: Max Greene
The Erosion & Sediment Control Plans (WP0200900048) submitted 16 September 2009 have received
Engineering Review and meet Albemarle County design manual minimum checklist items for approval.
Please submit 5 paper copies of the Plan to Current Development Engineering.
The E &SC bond amount is $12,900.00. The SWM bond amount is not required due to the reduction in
existing impervious area. The forms and instructions to post the Water Protection Ordinance Bond can be
found on the Community Development Department Web site on www.albemarle.org.
You may contact Pam Shifflett (Albemarle County Department of Community Development) at ext. 3246
for further information on bonding procedures.
Once the E &SC bond has been posted, you may contact the Department of Community Development to
arrange a pre - construction meeting with a County Erosion & Sediment Control Inspector. Should the
County Inspector find the limits of disturbance increased or the need for additional control measures
required to protect the site, additional fees will be required.
Current Development Engineering review is completed on the Final Site Plan (SDP200900069) and I have
notified the project's lead planner, Elizabeth Marotta, that all engineering concerns have been satisfied.
Once all other County departments and VDOT have completed their reviews of the Plan, Elizabeth
Marotta will contact you to request mylars of the Plan be submitted to Current Development for signature.
Please contact Elizabeth Marotta of Current Development Planning at ext. 3432 regarding approval of the
Final Site Plan.
File: CDE1_esc_MRG_Abbington Crossing Clubhouse.doc