HomeMy WebLinkAboutSDP200800124 Review Comments Final Site Plan and Comps. 2009-10-22ALg�,��
�'IRGINZ�
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project:
Plan preparer:
Owner or rep.:
Date received:
Rev 1:
Rev 2:
Rev 3:
Date of Comment:
Rev 1:
Rev 2:
Rev 3:
Engineer:
Rev 1,2,& 3:
SDP - 2008 - 00124, Whitehouse Commercial
Justin Shimp Oshimp @ddrva.com)
Hurt Investment Company Inc.
6 August 2008
29 October 2008
8 July 2009
18 September 2009
11 September 2008
3 December 2008
17 August 2009
22 October 2009
Amy Pflaum
John P. Diez
The Final Site Plan for Whitehouse Commercial, received on 18 September 2009 has been reviewed. The
plan cannot be approved as submitted and will require the following corrections before approval can be
granted:
A. General Review Comments
1. All plans submitted must be signed and sealed by a licensed professional. [18- 32.6.1]
(Rev. I) Comment has been addressed.
2. Please provide a benchmark location, elevation, and datum for topography. An existing utility or
other known position will suffice. [DM]
(Rev. I) Comment has not been addressed. Please show the benchmark on the plans. EX -7
cannot be located.
(Rev. 2) Comment has been addressed.
3. Please provide maximum height for all proposed retaining walls. [Building Official Policy]
(Rev. I) Comment has been addressed
4. Safety railing is required for retaining walls over 4 feet high.
(Rev. I) Comment has been addressed
5. Please provide dimensions for all proposed permanent easements. [18- 32.7.4]
(Rev. I) Comment has been addressed
6. Easements are not shown consistently throughout the plans (for example, Sh. C7 does not match
Sh. C8 for drainage easement from parcel TMP 78 -10).
(Rev. I) Comment has been addressed
7. Please label proposed entrance with VDOT designation.
(Rev. I) Comment has been addressed
8. VDOT approval must be obtained for any plan affecting public right -of -way.
(Rev. I) Comment has not been addressed.
(Rev. 2) Comment has been addressed.
9. Steep slopes and retaining walls adjacent to parking lots may interfere with the 2 foot grass
overhang required for 16' parking spaces. [18- 4.12.15]
(Rev. 1) Comment has been addressed
10. Please specify the slopes of travelway into the parking garage and the sight distance provided for
cars exiting the garage. [18 -4.12]
(Rev. 1) Comment has not been addressed. Please provide proposed contours or spots of
elevations inside the parking garage.
(Rev.2) Comment has been addressed.
11. Please check the Storm Drain Design Computations spreadsheet for consistency with the plans and
profiles. Measurements and hydrologic coefficients from the plan do not match the spreadsheet
(for example: STR -1 to STR -IA, & STR -1 to STR -EX3; ST -13).
(Rev. 1) Comment has not been addressed. Please provide diameters and lengths for all
proposed and existing pipes. Please check your CAD layers for any layers that might be turned
off (for example, STR -EX2, STR -EXI, etc.)
(Rev. 2) Comment has been addressed.
12. Please provide calculations for the pipe flow and capacity from manhole EX -2 to the pond.
(Rev. 1) Comment has been addressed
13. It appears that EX -3 is a grate inlet which will collect flow. Please provide information in the
Stormwater Inlet Computations.
(Rev. 1) Comment has been addressed
14. Carryover flows from inlets on grade do not appear to be accounted for on the Stormwater Inlet
Computations.
(Rev. 1) Comment has not been addressed. Carryover must be accounted for Stormwater Inlets
STR -7, STR -8, STR -11, STR -12, and STR -14A due to the inlets being set on grade.
(Rev. 2) Comment has been addressed.
15. Storm sewer pipe slopes should be a maximum of 16% or anchors per VDOT standards should be
provided.
(Rev. 1) Comment has been addressed
16. Please provide end sectional details and outlet protection computations for all outlets. Please
include dimensions and stone sizes for all outfalls.
(Rev. 1) Comment has been addressed
17. Please provide accurate details for all storm conveyance channels to match the storm water
conveyance channel schedule.
(Rev. 1) Comment has been addressed
18. Travelways shall not exceed 10% grade anywhere, in any direction. [18- 4.12.17]
(Rev. 2) Comment has not been addressed. Grading on the travelway north of the eastern
entrance of the parking garage still exceeds 10%.
(Rev. 3) Comment has not been addressed. Contours 60 thru 64 on the east side of bldg. C still
exceed 10%.
19. Please provide interparcel connectivity to Freebridge Auto Site as shown on the approved
preliminary site plan — SDP200800020
(Rev. 2)Comment has not been address. Please coordinate with previously approved plans for
WPO200800047. Once the plans have been coordinated, the location for the interparcel
connection will be determined.
(Rev. 3) Based on the previous meeting, please submit a WPO amendment illustrating the
removal of the temporary SWM facility from Tip Top (WPO200800047)
20. Please submit an Erosion & Sediment Control plan and WPO application for review and approval.
(Rev. 2) Comment has been addressed.
21. Concrete inlet shaping (IS -1) must be specified on any structure with a 4' or greater drop (for
example, STR -EX2).
(Rev. 2) Comment has not been addressed.
(Rev. 3) Comment has been addressed.
22. Storm Drain Design Computations show pipe STR -14 to STR -13 to have excessive outlet
velocities greater than 15 fps.
(Rev. 2)Comment has not been addressed.
(Rev. 3) Comment has been addressed. The sewer system is private and is designed by a
professional engineer.
B. SWM Plan Review Comments
23. Please provide a copy of an agreement between Whitehouse and the owner of parcel 78F -A for use
and maintenance of the stormwater management pond on this parcel.
(Rev. I) Comment has not been addressed.
(Rev. 2) Comment noted.
24. Please provide a copy of the calculations, details and plan showing that the stormwater pond
design accounted for the water quality and quantity requirements of the Whitehouse site.
(Rev. I) Comment has been addressed
25. If you are seeking pollutant removal credit from the two proposed rain gardens, you must submit a
WPO application with a Stormwater Management Plan and all required details and calculations.
(Rev. I) Comment has been addressed. Applicant stated that they are not seeking removal credit
for the two proposed rain gardens.
Once these comments have been addressed, please submit 2 copies of the revised plans,
calculations, and narratives to Current Development Engineering.
Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review
comments. Please contact John Diez at 434 - 296 -5832 ext. 3025 or email jdiez @albemarle.org to schedule
an appointment.
\\ Cob- dts01 \cityviewlnk\Docs \2008 \SDP \SDP200800124 - Whitehouse Commercial- Final\E4_fsp_rp_JPD_08 -124 - Whitehouse
Commercial.doc