Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200900048 Review Comments Bond Estimate 2009-09-23
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Abbington Crossing Clubhouse Replacement PROJECT NUMBER: WPO200900048 DATE OF ESTIMATE: 09/23/09 ESTIMATE BY: MRG BASED ON: Approved plan WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 0.8 1500 1200 SILT FENCE LF 1100 5 5500 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 7 200 1400 OUTLET PROTECTION EA 0 200 0 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 2 30 60 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal 10160.00 project management 1524.00 subtotal 11684.00 CONTINGENCY LS 10% 1168.40 TOTAL 12852.40 BOND AMOUNT REQUIRED 12900.00