Loading...
HomeMy WebLinkAboutWPO200900050 Review Comments Stormwater Management Plan 2009-10-13ALg�,�� �'IRGINZ� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: South Plains Presbyterian Church; WPO- 2009 - 00050; SDP - 2009 -00080 Plan preparer: Mr. Bill Atwood; Atwood Architects Mrs. Ashley Cooper; Cooper Planning Mr. Clark Gathwright; Daggett and Griggs Architects Owner or rep.: South Plains Presbyterian Church Date received: 23 September 2009 Date of Comment: 13 October 2009 Engineer: Phil Custer The final site, ESC, and SWM plan for South Plains Presbyterian Church has been reviewed. The following comments are provided. A. SDP - 2009 -00080 Final Site Plan Comments 1. Engineering review recommends that the parking lot along Black Cat Road be modified to provide for one VDOT standard entrance. This is not a requirement due to a determination from the Chief of Current Development. 2. Please modify the grading in the western portion of the courtyard/garden so that the topography works with the raingarden/biofilter. 3. Please provide a detail for the sidewalk that meets or exceeds the county's requirement of 4" of 3000psi concrete @ 28days and 4" of stone base beneath. [DM] B. WPO- 2009 -00050 Stormwater Management Plan Comments 1. A SWM facility maintenance agreement will need to be recorded before the site plan can be approved. Please submit this document with $17 fee directly to Ana Kilmer after consulting the guidelines available on the county website. 2. Please provide a modified simple removal rate spreadsheet for each drainage area/facility, not the whole site, which corresponds to drainage area lines drawn on the plan. This is necessary to confirm that each facility is sized appropriately for the watershed draining to it. 3. Please provide two permeability tests for the infiltration trench. The VMSH specifies that the in- situ permeability tests must yield infiltration rates greater that 0.52" per hour in order to consider infiltration facilities practical. The VSMH also states that the infiltration facility must drain in 48hours and the soil test must clearly show this. [VSMH 3.10] 4. On the infiltration trench detail, please specify that the depth is 3ft minimum, the bottom of the trench is flat, and the #57 gravel is clean- washed. 5. Engineering review recommends removing the filter fabric from the infiltration trench and biofilter. Depending on the type used, the fabric could wind up being the limiting factor in both facilities. If the filter fabric is removed from the biofilter, it should be replaced with a 4" layer of pea gravel. If the filter fabric is to remain in the plan, I recommend specifying the product number. This is not a requirement. 6. The following modifications are required to the biofilter /rain garden detail: a. The depth of the biofilter mix must be 2.5ft. b. The thickness of the gravel layer must be between 12" and 18 ". c. The soil media must be called out as state approved mix. 7. Please provide a planting plan for the biofilter. There must be at least three species of shrub proposed. 8. Please provide the following note on sheets C 1.1 and C3.1: When the stormwater management plan for Phase 77 is submitted, detention and stormwater quality computations will need to consider the pre- development condition as the property before the construction of the fellowship hall. 9. A SWM bond will be computed once the WPO plan is ready for approval. C. WPO- 2009 -00050 Erosion and Sediment Control Plan Comments 1. Please add to the set the County's standard ESC notes. These notes can be found in the design manual, available online. 2. The limits of construction areas should be connected. 3. Please add Dust Control (DC) to the plan. 4. Please provide silt fence on the north side from the treeline of the 9" spruce to the midpoint between the 9" Holly and the 9" Dogwood. 5. Tree protection is being shown throughout the site but the tree layer has been turned off. Please show the dripline of all trees on the ESC plan. Construction cannot be shown within the dripline of trees required to be protected. This rule appears to have been violated in the garden /courtyard and adjacent to the fill area. To rectify this, the grading of the courtyard can be modified to keep fill out of the dripline of the cherry and dogwood trees or tree wells can be provided. Regarding the fill area, I recommend moving it to the northern border because fill will likely be necessary to construct the parking lot in Phase II at the minimum parking lot grade of 5 %. (The area of fill was also shown outside the limits of work on the approved SP plan and may require a determination from the Zoning Administrator if the applicant wishes to continue to propose fill in this location.) Please remove grading from within the dripline of 12" Holly. Also, please move the infiltration trench to the south as much as possible out of the roots of the 27" Gum. For all other areas showing the limits of construction within the dripline of tree, please provide a letter from a certified arborist attesting that the latest revision of the site/ESC plan would not compromise the health of any tree shown with construction within its dripline. 6. Please demonstrate that this development meets VESCH Minimum Standard 19 regarding adequate channels. 7. An ESC bond will be computed once the WPO plan is ready for approval. File: E1_fsp swm esc_PBC_wpo090005O- sdpO90008O South Plains Presbyterian.doc