Loading...
HomeMy WebLinkAboutSDP200900080 Review Comments Final Site Plan and Comps. 2009-10-14jy�i ii1�►;'. County of Albemarle Department of Community Development Memorandum To: Bill Atwood, Atwood Architects, Inc. David Garth, South Plains Presbyterian Church of Keswick Virginia, Inc. om: Elizabeth M. Marotta, Senior Planner Division: Zoning & Current Development Date: October 14, 2009 Subject: SDP 2009 -80 South Plains Presbyterian Church -Final The Planner /Engineer for the Zoning & Current Development Division of the Albemarle County Department Community Development will recommend approve the Final plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] 1. [32.5.6.b] Denote tree buffer along shared property line with Mr. Rintels as part of Phase I work. 2. [32.5.6.p/ SP08 -28 #10] Change Arborvitae to "Green Giant" per Mr. Rintels email to Bill Atwood dated 10/9/09 (attached) and pursuant to establishing a private agreement. 3. [32:5.6.n] New concrete walkway is not drawn connecting to proposed building. Please revise drawing to show connection. 4. [32.6.6J] Standard lighting note must be provided. This may be provided on the cover sheet under Project Notes. Note is: Each outdoor lumi.naire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one -half footcandle. 5. [COMMENT] Please clarify on the plans the intent of hatching the "wooded area ". Generally, treelines are depicted with a simple treeline linetype, therefore the hatching seems to indicate special conditions. Per the conditions of the SP, this tree buffer may not be removed, so a note indicating trees in the wooded area is hatched in order to indicate they must remain may be appropriate... 6. [COAUdENT] Engineering, Fire Rescue, Inspections, and ARB approval is required. Please contact Elizabeth M. Marotta at the Department of Community Development 296 -5832 ext. 3432 for further information. Page 1 of 1 :Elizabeth Marotta From: Jonathan Rintels Drintels @gmail.com] Sent: Friday, October 09, 2009 11:18 AM To: Bill Atwood Cc: Elizabeth Marotta Subject: From Jon Rintels re South Plains Church Hi Bill, I met with Elizabeth Marotta and reviewed the Sept 16 site plan for the church. I noticed that the arborvitae specified is not the Green Giant variety that we agreed to with the church and presented as the agreed upon planting at the Board of Supervisors meeting. The Green Giant variety is Thuja standishii x plicata. Instead, the site plan specifies Thuja occidentalis 'Techny' (also known as 'Mission'). This is described on the Internet as "the long - standing traditional cultivar that has dark green foliage year - round, to 12' tall by 4' wide, broadly pyramidal or upright oval in shape." http: / /hcs osu edii/hes /TMI/Plantlist /th talis.htlnl http:llwww westonnurseries. com/ index. cfm ?fuseaction:—:�plants.plantDetail &plant id =986 The Green Giant arborvitae is fast growing and reaches 50 feet tall and eight feet wide. The Techny that is specified reaches only 12 -20 feet, is slow growing, and only 4 -6 feet wide. Thus, because of the lower elevation where these trees are to be planted, the arborvitae specified on the site plan doesn't help us at all. If the site plan were changed to specify the Green Giant arborvitae, as we agreed with the Church, then we would be willing to sign off on the staggered planting of the trees on the Church side of the property line as shown on the Sept. 16 site plan. I look forward to hearing from you on this. Best, .Jon Jonathan Rintels 434.971.8894 v 949.209.4081 f jrintels@gmail.com 10/14/200.9