Loading...
HomeMy WebLinkAboutARB200900078 Review Comments Miscellaneous Submittal 2009-10-12ARCHITECTURAL REVIEW BOARD STAFF REPORT Project #: Name ARB- 2009 -78: Cedar Hill - Sign Review Type Certificate of Appropriateness for a Sign Parcel Identification Tax Map 32, Parcel 22I Location At the southwest corner of the intersection of Route 29 North and Cypress Drive, at the entrance to the Cedar Hill Mobile Home Park Zoned Residential (R4), Entrance Corridor (EC) Owner C. Ray Beard, Trustee of the C Ray Beard Living Trust Applicant C. Ray Beard Magisterial District Rio Proposal To install a freestanding monument sign. ARB Meeting Date October 19, 2009 Staff Contact Brent Nelson SITE/PROJECT HISTORY • 10/6/09: ARB 09 -78, Cedar Hill Sign, Staff conducted an administrative review of the proposal and determined that the proposed monument stone wall material could not be administratively approved. For this reason, the applicant requested a full review by the ARB. • 4/21/03: ARB 03 -37, Cedar Hill Mobile Estates, Conceptual Review of a Site Development Plan, Advisory Review for a Special Use Permit. The applicant proposed to expand the mobile home park to 109 units. Comments were provided for the benefit of the applicant's next submission. A resubmission has not been received. • The mobile home park was established prior to the adoption of Route 29 as an Entrance Corridor. LOCATION /CONTEXT The site is located on the west side of Route 29, approximately 600' northeast of Northside Drive and 2,100' southwest of Lewis and Clark Drive. The site is presently developed as a mobile home park with the mobile home park office located approximately 90' northwest of the intersection of Route 29 and the entry road Cypress Drive. The proposed freestanding sign is to be located in the lawn area between the evergreen trees at the southeast end of the office building and the Entrance Corridor. This section of the Corridor is sparsely developed with a mix of office, industrial, high density residential and commercial facilities. VISIBILITY Due to its proposed location 10' northwest of the Route 29 right -of -way, the double -sided sign is expected to be highly visible from the Entrance Corridor. ARB 10/19/09, Cedar Hill Sign - Page 1 PROPOSAL Type: Double -face freestanding monument sign Materials: Concrete, stone, aluminum Overall size: 56" (h) x 112" (w) x 12" (d) Text size: 15" (h) x 92" (w) Text: "Cedar Hill" Graphic: None Logos: None Materials /colors: Monument: Stone, Sanibel Coastal Reef; Cap, Eldorado Rustic Wall Text: Black Location: In the southwest corner of the intersection of Cypress Lane and the southbound lane of Route 29, 10' northwest of the Route 29 right -of -way. Illumination: None ANALYSIS (based on revised sign drawings received by email on 9/23/09 and 9/25/09, and material sample: Sanibel Coastal Reef received 10/6/09.) Issue: Proposed Monument Material Comments: The applicant is proposing the use of Sanibel Coastal Reef stone for the monument wall with Eldorado Rustic Wall as the wall cap. A sample of the Sanibel Coastal Reef was provided by the applicant. A sample of the Eldorado Rustic Wall cap was not provided; however, photos of that material and the Sanibel Coastal Reef were included on the brochure photo included with this submission. The stone shown in the photo /rendering of the proposed sign does not match the proposed material Sanibel Coastal Reef. The Sanibel Coastal Reef does not look like stone that is typical to this area. This material, with its uniform edge and flat marble -like surface, looks like stone from a more urban and coastal area. The stone products in the Mountain Ledge series, in the same brochure, have an appearance that is more typical of site walls in this area. The appropriateness of the proposed wall cap could not be determined due to the lack of a sample. Recommendations: Revise the sign proposal to show the use of a stone product representative of stone found in this area. Provide a sample of the revised wall stone and wall cap. Revise the sign photo /rendering, as needed, to show a stone wall more closely resembling the material that is approved for this proposal. Issue: Landscape Plan Comments: The applicant is proposing the use of Blue Rug Juniper, in a mulch bed around the base of the sign, as the only plant material. This low growing ground cover with its mature height of 4" - 6 ", by itself, would have minimal visual impact from the Entrance Corridor and would not integrate the sign into the existing landscape that includes a row of evergreen trees at the southeast end of the adjacent mobile home park office building. A plan view drawing of the landscape proposal, with a planting schedule, was not included in this submission. The addition of shrubs (24" min. at planting) and a medium size tree (2- 1/2" caliper min. at planting), in a planting bed extending from the northwest end of the sign to the row of existing evergreen trees, would further integrate the sign structure into the existing landscape. Recommendations: Provide a plan view drawing of the landscape proposal, including a planting schedule, showing shrubs (24" min. at planting) and a medium size tree (2 -1/2" caliper min. at planting) in a planting bed extending from the northwest end of the sign to the row of evergreen trees at the southeast end of the mobile home park office building. Issue: Drafting Errors /Omissions ARB 10/19/09, Cedar Hill Sign - Page 2 Comments: The sign drawing does not indicate the height of the proposed text. The applicant has verbally indicated that the sign is not to be illuminated; however, it is not noted on the sign drawing. Recommendations: Revise the sign drawing to indicate the height of the proposed sign text and to note that the sign shall not be illuminated. SUMMARY OF RECOMMENDATIONS Staff recommends the following as the primary points of discussion: 1. The proposed monument material 2. The proposed landscape plan RECOMMENDATIONS Staff recommends approval of a Certificate of Appropriateness pending staff administrative approval of the following conditions: 1. Revise the sign proposal to show the use of a stone product representative of stone found in this area. Provide a sample of the revised wall stone and wall cap. Revise the sign photo /rendering, as needed, to show a stone wall more closely resembling the material that is approved for this proposal. 2. Provide a plan view drawing of the landscape proposal, including a planting schedule, showing shrubs (24" min. at planting) and a medium size tree (2 -1/2" caliper min. at planting) in a planting bed extending from the northwest end of the sign to the row of evergreen trees at the southeast end of the mobile home park office building. 3. Revise the sign drawing to indicate the height of the proposed sign text and to note that the sign shall not be illuminated. ARB 10/19/09, Cedar Hill Sign - Page 3