From: Kirtley, Joshua (VDH) [ Joshua .Kirtley @vdh.virginia.gov]
Sent: Monday, October 26, 2009 10:26 AM
To: Elizabeth Marotta
Subject: Ashlynn Project
Elizabeth:
Thank you for sending over the site plan for Ashlynn. After reviewing the plan and making site
visits in the field, the applicant will need to make several septic modifications to an existing
system in order for the addition to be built. The applicant should come in to the Health
Department (with a copy of the building permit application in hand) to apply for a septic
modification permit. I ask that whatever modifications that are required be installed and
approved before a building permit is released. This is due to the fact that there will still be
an existing office and it will need to have a septic system while the work is being completed.
I will email you once the applicant has applied for the modification permit, when the work is
completed, and when the Health Department approves the work that was done. Please let me
know if you have any questions or if I need to clarify anything.
Thanks,
Josh
Josh Kirtley
Environmental Health Specialist Senior
Thomas Jefferson Health District
1138 Rose Hill Drive
Charlottesville, Virginia 22906
(434) 972 -6288