Loading...
HomeMy WebLinkAboutWPO200900043 Review Comments Bond Estimate 2009-10-19BOND ESTIMATE - EROSION CONTROL PROJECT NAME: PROJECT NUMBER: DATE OF ESTIMATE ESTIMATE BY: BASED ON: Profit Ridge Lot 3 W PO- 2009 -00043 10/19/09 PBC Drawing Signed 9 -30 -09 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 0.92 1500 1380 SILT FENCE LF 630 5 3150 EC -2 & 3 DITCH PROTECTION LF 240 10 2400 RIP -RAP LF 20 55 1100 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal project management subtotal CONTINGENCY TOTAL BOND AMOUNT REQUIRED 10030.00 1504.50 11534.50 LS 10% 1153.45 12687.95 12700.00 last revised:12 -5 -01