To: Elizabeth Marotta, Senior Planner
From: John P. Diez, Engineering Review
Division: Current Development
Date: November 6, 2009
Subject: SDP200900075 Pleasant Grove New Sanctuary - Preliminary Site Plan
The preliminary site plan for Pleasant Grove New Sanctuary, submitted on October 16, 2009, has been
reviewed. Current Development Engineering has the following comments:
Preliminary Site Plan Comments
1. Benchmark location, elevation, and datum for topography must be provided. An existing utility or
other known position will suffice. [18- 32.5.6a]
2. Please provide a proposed conceptual lay -out for a storm drain facility including a storm detention
pond or structure, indicating direction of flow in all pipes and watercourses with arrows.
[18- 32.5.6k, 17 -3031
Removal rates must be met for each project drainage area. Please provide a Simple Method
Spreadsheet. [17 -315A]
4. Please provide a sight distance triangles at the entrance. [18- 4.12.17b]
5. All proposed slopes must be 2:1 or flatter. [DSM]