Loading...
HomeMy WebLinkAboutSDP200900075 Review Comments Preliminary Site Plan 2009-11-06vIRGIN� County of Albemarle Department of Community Development Memorandum To: Elizabeth Marotta, Senior Planner From: John P. Diez, Engineering Review Division: Current Development Date: November 6, 2009 Subject: SDP200900075 Pleasant Grove New Sanctuary - Preliminary Site Plan The preliminary site plan for Pleasant Grove New Sanctuary, submitted on October 16, 2009, has been reviewed. Current Development Engineering has the following comments: Preliminary Site Plan Comments 1. Benchmark location, elevation, and datum for topography must be provided. An existing utility or other known position will suffice. [18- 32.5.6a] 2. Please provide a proposed conceptual lay -out for a storm drain facility including a storm detention pond or structure, indicating direction of flow in all pipes and watercourses with arrows. [18- 32.5.6k, 17 -3031 Removal rates must be met for each project drainage area. Please provide a Simple Method Spreadsheet. [17 -315A] 4. Please provide a sight distance triangles at the entrance. [18- 4.12.17b] 5. All proposed slopes must be 2:1 or flatter. [DSM] \\ Cob- dts01 \cityviewlnk\Docs \2009 \SDP \SDP200900075 Pleasant Grove New Sanctuary - Final \CDE1_psp_JPD_09 -00075 Pleasant Grove New Sanctuary.doc