HomeMy WebLinkAboutSDP200800125 Review Comments Final Site Plan and Comps. 2009-11-13Elizabeth Marotta
From: James Barber
Sent: Thursday, December 03, 2009 8:05 AM
To: Elizabeth Marotta
Subject: RE: Pavilions Phase III (SDP 2008 -125)
Good morning Elizabeth,
Thank you...yes I did receive a water model from the developer that indicated 2000 GPM was achievable with a 20 PSI
residual. Once the water lines and hydrants are in place a field test should be conducted to verify the fact. No further
comment is necessary on my part.
James
From: Elizabeth Marotta
Sent: Wednesday, November 25, 2009 9:29 AM
To: James Barber
Subject: FW: Pavilions Phase III (SDP 2008 -125)
Good morning James,
In reviewing this project, I noticed you replied "no objection- Must comply with the Virginia Statewide Fire Prevention
Code. Final approval is subject to field inspection and verification" to the latest submittal. I just want to confirm with you
that per the email below, you got the information you needed. I have not seen anything further on the issue, so I just
want to make sure I do not need to comment on it any further.
— elizabeth
From: James Barber
Sent: Tuesday, November 25, 2008 12:59 PM
To: Elizabeth Marotta
Subject: RE: Pavilions Phase III (SDP 2008 -125)
Good afternoon Elizabeth,
The side yard setback of ten feet is approved provided the applicant can ensure a minimum fire flow of 2000 GPM 0
20 PSI residual pressure. This information is typically provided through the service authority or through water modeling
done by the developer. In the case of water modeling, an actual flow test must be conducted after the water lines and
hydrants are in place.
Please feel free to contact me if you have additional questions.
James F. Barber
Assistant Chief, Prevention
County of Albemarle
Department of Fire /Rescue
460 Stagecoach Road, Suite F
Charlottesville, VA 22902 -6489
Ph: (434) 296 -5833
Fax: (434) 972 -4123
E -mail: JBarber@Albemarle.org
Web: www.ACFireRescue.org
From: Elizabeth Marotta
Sent: Tuesday, November 25, 2008 11:29 AM
To: James Barber
Subject: FW: Pavilions Phase III (SDP 2008 -125)
Hi James,
I am Elizabeth Marotta, the Senior Planner for the County working on this site plan. I see you have been working with
Keith on the review of Pavillions Phase 3.
In addition to regular site plan approval (for IBC /IFC issues), which I see is granted below, I need confirmation from you
that you have explicitly approved the side setback reduction to 10' on the units.
Sec. 4.11.3 of the County Code permits the applicant to reduce the side setbacks as long as the County fire official
approves it and there is adequate fire flows. I understand that the preliminary was reviewed and approved, and in that
plan reduced setbacks were shown, however in order to approve the final I do need a specific response to this issue.
The section from the ordinance is below (section A). Therefore, I am looking for an explicit statement from you regarding
your review of the reduced side setbacks.
Thank you for your help with this; I understand you are very busy over there.
Sincerely,
Elizabeth
4.11.3 REDUCTION OF BUILDING SEPARATION AND SIDE YARDS (Added 1 -1 -83, Amended
6- 11 -08)
The minimum building separation and side yards for primary structures may be reduced in
accordance with the applicable district regulations as follows:
A. Reductions for structures not within zero lot line developments; with adequate fire flows
or which are constructed in accordance with the building code. The minimum building
separation or side yards for primary structures may be reduced if the structure is not
located within a zero lot line development, but is located in an area where available fire
flows are adequate under Insurance Service Offices standards to allow the reduction.
Each primary structure for which the minimum building separation or side yard has been
reduced as provided in this subsection shall be subject to the following:
1. In the case of a side yard reduction, the Albemarle County fire official may require a
guarantee as deemed necessary to insure compliance with the provisions of this
section, and this guarantee may include, but not be limited to, appropriate deed
restrictions, disclosure, and other such instruments, which shall be of a substance and
be in a form approved by the fire official and the county attorney, and shall be
recorded in the records of the circuit court of the county;
2. No structure shall encroach within any emergency accessway required by the
Albemarle County fire official;
3. Unless constructed to a common wall, no structure shall be located closer than six (6)
feet to any lot line; and
4. No structure shall encroach on any utility, drainage or other easement, nor on any
feature required by this chapter or other applicable law.
B. Reductions for dwelling units within zero lot line developments. The minimum building
separation or side yards for detached dwelling units may be reduced to zero (0) feet on
one side for each dwelling unit located within a zero lot line development if the structure
is located in an area where available fire flows are adequate under Insurance Service
Offices standards to allow the reduction. Each zero lot line development shall be subject
to the following:
1. The subdivider shall submit with the final subdivision plat a lot development plan
showing all the lots in the zero lot line development and delineating the location of
each zero lot line dwelling unit;
2. The subdivider shall establish a perpetual wall maintenance easement on the lot
abutting the zero lot line side of the dwelling unit so that, with the exception of
fences, a minimum width of ten (10) feet between dwelling units shall be kept clear
of structures in perpetuity. This easement shall be shown on the final plat, shall be
of a substance and be in a form approved by the director of community development
and the county attorney, shall be recorded in the records of the circuit court of the
county with the approved final subdivision plat, and shall be incorporated by
reference in each deed transferring title to each lot that is a dominant and servient
estate; and .
3. Building footings may penetrate the easement on the adjacent lot to a maximum
distance of eight (8) inches.
(1 -1 -83; 10- 15 -86; Ord. 08- 18(4), 6- 11 -08)
From: Keith Lancaster [mailto:klancaster @southern - development.com]
Sent: Tuesday, November 25, 2008 8:04 AM
To: Elizabeth Marotta
Cc: diensen @wwassociates.net; jkinney @wwassociates.net
Subject: FW: Pavilions Phase III (SDP 2008 -125)
Elizabeth,
I finally have the approval for the Fire Department please let me know if you have any questions about this email.
Thanks,
Keith
From: James Barber [mailto:JBARBER @albemarle.org]
Sent: Tuesday, November 25, 2008 6:57 AM
To: Jay Schlothauer; Keith Lancaster
Cc: Bill Fritz
Subject: RE: Pavilions Phase III (SDP 2008 -125)
Keith,
I apologize for the difficulty you have experienced in contacting me. Our department, like many others across the county,
has experienced budget shortfalls and to that end, our plan review position has been eliminated. I am doing both jobs, and
at times, there is a lag which you may not have previously experienced.
In general, I will have no objection with plans submitted which are in compliance with the Virginia Uniform Building Code
(IBC) and the Virginia Statewide Fire Prevention Code (IFC). If you have specific questions or need guidance on a local
issue, e-mail is the easiest way for you to reach me.
Please let me know if I can be of further assistance.
James F. Barber
Assistant Chief, Prevention
County of Albemarle
Department of Fire /Rescue
460 Stagecoach Road, Suite F
Charlottesville, VA 22902 -6489
Ph: (434) 296 -5833
Fax: (434) 972 -4123
E -mail: JBarber@Albemarle.org
Web: www.ACFireRescue.org
From: Jay Schlothauer
Sent: Monday, November 24, 2008 3:47 PM
To: 'Keith Lancaster'
Cc: Bill Fritz; James Barber
Subject: RE: Pavilions Phase III (SDP 2008 -125)
Keith,
I am not working on plans for James. Please continue your efforts through him.
Jay Schlothauer
Director of Inspections / Building Official
Albemarle County Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
telephone: (434) 296 -5832, ext. 3228
fax: (434) 972 -4126
From: Keith Lancaster [mailto:klancaster @southern - development.com]
Sent: Monday, November 24, 2008 3:16 PM
To: Jay Schlothauer
Subject: Pavilions Phase III (SDP 2008 -125)
Jay,
We've been working on this site plan for the past few months and every time comments are due from James Barber we
never get comments. I've sent him a few emails and have spoken to him, but still have not heard from him. So, I talked
with Bill Fritz and he thought you might be working on plans for them through the site plan process. Please let me know if
this is true and if you need a copy of the site plan.
Thanks for your help on this.
Keith Lancaster
Planner
Southern Development
170 South Pantops Drive
Charlottesville, VA 22911
(434) 245 -0894 x106
(434) 245 -0895 (fax)