Loading...
HomeMy WebLinkAboutWPO200900063 Review Comments Erosion Control Plan 2009-12-11� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Lone Oak Stream Mitigation Bank WP0200900063 Plan preparer: Wildlands Engineering, INC. [fax (704) 332 -33061 Owner or rep.: TCP II Lone Oak LLC [fax Unknown] Plan received date: 11 November 2009 Date of comments: 11 December 2009 Reviewer: Max Greene The erosion and Sediment Control plans for the Lone Oak Mitigation Bank submitted on 11 November 2009 have received Albemarle County Engineering review. The plan appears to require the following additional review information prior to approval. 1) Please clarify how downstream areas will be protected prior to soil stabilization. E &SC plan appears to show protection for the stockpile areas only. This office recommends utilizing the Virginia Uniform Coding System for Erosion and Sediment Control Practices. a) Please state whether the existing ponds will remain in place until areas above are stabilized. b) Please note on the plans: All work will be performed "in the dry' as per the Virginia Erosion and Sediment Control Handbook, 3rd edition. c) Please all show proposed grades. d) Show temporary vehicular stream crossings (Std. & Spec 3.24, VESCH) on the plans where contractor is expected to cross streams. e) Show utility stream crossings (Std. & Spec 3.25, VESCH) on the plans where contractor is expected to divert streams to work "in the dry ". f) Show temporary sediment traps (Std. & Spec. 3.13, VESCH) in areas not expected to be stabilized within 7 days of disturbance. 2) This office recommends limiting the acres of active disturbance to 10 acres or less without soil stabilization. 3) Page 3.0.1 - needs correction. There are two streams with 4.0 designations. 4) Page 5.6 - Construction entrances will be per VESCH 3.02 (i.e. a minimum 12'x 70' for one -way traffic.) Due to the level of requested items to be shown on the plans, additional comments /corrections may be forth coming. Once these comments have been addressed, please submit 2 copies of the revised plans, calculations, and narratives to Current Development Engineering. Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email mgreene @albemarle.org to schedule an appointment. File: E1_esc_MRG_Lone Oak Stream Mitigation Bank.doc