Loading...
HomeMy WebLinkAboutARB200900053 Review Comments Final Site Plan and Comps. 2009-12-02�'IRGINLP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 December 1, 2009 Scott Swanson Gresham, Smith and Partners 10 South Sixth Street, Suite 100 Richmond, Virginia 23219 RE: ARB- 2009 -53: Martha Jefferson Outpatient Care, Route 29N & Proffit Road - Final Review of a Site Development Plan TMP 032AO- 02- 00 -OOIAO Dear Mr. Swanson: I have reviewed your recent submittal for the above - referenced project consisting of: Site Plan Sheets: • Sheet 1 of 5, Existing Conditions Plan, latest revision date 11/12/09 • Sheet 2 of 5, Demolition and Tree Protection Plan, latest revision date 11/12/09 • Sheet 3 of 5, Layout Plan, latest revision date 11/12/09 • Sheet 4 of 5, Utility Plan, latest revision date 11/12/09 • Sheet 5 of 5, Grading and Drainage Plan, latest revision date 11/12/09 • Sheet LL -1, Existing Landscape Plan, latest revision date 8/4/09 • Sheet LL -2, Removal of Existing Plants, latest revision date 8/4/09 • Sheet LL -3, Proposed Landscape Plan, latest revision date 11/12/09 • Sheet LL -4, Proposed Landscape Plan, latest revision date 11/12/09 • Sheet E1.01, Site Plan — Lighting, latest revision date 10/16/09 • Sheet E1.02, Site Plan Zoning, date 3/31/09 • Sheet E1.03, Lighting Cutsheets, date 3/31/09 • Sheet E1.04, Lighting Cutsheets, date 3/31/09 • Sheet E1.05, Lighting Cutsheets, latest revision date 10/18/09 Sig_nage Sheets: • Sheet 19065, latest revision date 8/3/09 • Sheet 19065.MS2.4, latest revision date 5/15/09 • Sheet 19065.MS2.1, latest revision date 10/2/09 • Sheet 19065, latest revision date 8/3/09 • Sheet 19065.MS1, latest revision date 10/5/09 • Sheet 19065.I132, latest revision date 10/2/09 • Sheet 19065.I132, latest revision date 5/25/09 • Sheet 19065.I132, latest revision date 10/2/09 • Sheet 19065.R, latest revision date 5/27/09 • Sheet 19065.CD, latest revision date 4/27/09 Architectural Sheets: • Sheet A2.01, First Floor Plan, New Construction and Dimensions, date 10/7/09 • Sheet A3.1, Exterior Elevations, date 10/7/09 Outstanding issues that will need to be further addressed are shown in italics after the original comment from the Action Letter of September 24, 2009. 1. Provide a sample of the proposed spandrel glass for review. Issue: A sample of the proposed spandrel glass was not included in this latest resubmission. Recommendation: Provide a sample of the proposed spandrel glass for review. 2. Revise all applicable landscape drawings by revising the type or location of the frontage trees to avoid the tree canopy extending into the power line easement adjacent to the Route 29 North right -of -way. Issue: The proposed European Hornbeam trees, shown adjacent to the Route 29N right -of- way, are drawn with 20' diameter canopies. This species can reach mature canopies of 30' to 40' in diameter, therefore encroaching upon the power easement. Replacing these trees with a more columnar tree such as the Goldspire Sugar Maple, Acer saccharum "Goldspire" would resolve the issue. This species has a mature canopy diameter of 15' to 20'. Recommendation: Revise the landscape proposal by replacing the proposed European Hornbeam with a more columnar species whose canopy does not exceed a 20' diameter, consider using the Goldspire Sugar Maple, Acer saccharum "Goldspire. " Revise the sign drawings to indicate the cabinet height and the base height/width of the sign structure in the northwest corner of the site and the base height/width of the sign structure in the southwest corner of the site. Revise the sign drawings to indicate the method of illumination. Issue: The applicant has verbally indicated the ground- mounted lights shown for both freestanding signs are existing and to remain; however, this is not indicated on the photometric plan Recommendation: Revise the photometric plan to include a note indicating the signage lighting is existing and to remain. 4. Revise Sheet E1.05 by correctly identifying the canopy lighting cutsheet and including cutsheets for the wall- mounted building lights (BL) and the ground mounted signage lights. Make sure that all cutsheets are clearly labeled for type and location. Include the standard lighting note: Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one -half footcandle. Given the unique nature of an emergency 24 -hour facility, in this case the ARB will allow the ground- mounted building lights as proposed. Issue: The Luminaire Schedule shown on Sheet El. 01 does not include the proposed fixture and pole colors, the building lighting listed in the Lighting Fixture Schedule on Sheet El. 05, and the proposed poles for the site lighting. Recommendation: Revise the Luminaire Schedule shown on Sheet E1.01 to include all fixture and pole colors, proposed building light fixtures and the proposed poles for the site lighting. Please provide: 1. Two copies of the applicable drawings addressing these issues. 2. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staff s review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Brent Nelson Landscape Planner cc: Rachel McKinney (via email) RK &K Engineers File COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Brent Nelson DATE: PROJECT NAME: ARB2007 -00029 Van Dine Plaza Submittal Type Requiring Revisions O indicates submittal Code County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan (MP) 2 Brent Nelson Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private /public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment) (FSP) Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB2007 -29 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 2 Brent Nelson