Loading...
HomeMy WebLinkAboutWPO200900066 Review Comments Erosion Control Plan 2009-12-23OF AL O ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer: Owner /Applicant: Plan received date: Date of comments: Reviewer: A. Final Site Plan Camelot Pump Station [SDP200900096, WP0200900066] Charles Luck, P.E. [cluck @wrallp.com] HMC Holdings LLC 24 November 2009 23 December 2009 John P. Diez — Engineering Technician 1. Please provide a benchmark location, elevation, and datum for topography. An existing utility or other known position will suffice. 2. Please provide FEMA map and date references labeled for FEMA floodplains. 3. All slopes 25% and over (critical slopes by County Zoning Ordinance) must be shaded. [18- 32.6.6] Critical slope disturbance will be considered exempt per 18- 4.2.6.c unless the unnecessary construction entrance south of the new appurtenances are to remain. 4. Proposed slopes steeper than 3:1 must have low maintenance (not grass) ground cover specified on the plan. Examples of acceptable groundcovers can be found in Table 3.37C of the VESCH. 5. Please provide all offsite temporary and permanent easements necessary to construct the site as proposed. Temporary easements (for construction) can be in the form of letters or emails from the property owner. To assist county review in determining where all easements are needed, please show existing easement lines on the plan with references to deed book and page numbers. B. Erosion and Sediment Control Plan 1. Please include the inlet protection in the limits of disturbance. Please also include the work within the VDOT ROW as part of the limits of disturbance. 2. Please provide dust control (DC). 3. Please provide a construction entrance to the offsite portion of the site on the West side of US -29. 4. Please remove the construction entrance south of the proposed site. 5. Clean water diversions are not a state standard. If the applicant wishes to divert offsite water around the construction site, a riprap or sod V -ditch with be necessary. 6. Please remove the silt fence outlet protections. 7. Silt fence must be placed parallel to contour lines wherever possible. For instance, east of the larger WWTP basin, at least 100ft of silt fence can be provided along a contour line. 8. All diversions should be removed from the plan. In their place, please provide silt fence parallel to contour lines wherever possible. 9. Additional comments may be required based on enforcement of adjacent parcel earthwork currently underway. Once these comments have been addressed, please submit two (2) copies of the revised plans, calculations, and narratives to Current Development Engineering. Albemarle County Community Development Engineering Review Comments Page 2 of 2 Current Development Engineering is available from 2:30pm — 4:00pm on Thursdays to discuss these review comments. Please contact Amy Pflaum at 434 - 296 -5832 or apflaum @albemarle.org to schedule an appointment. \\ Cob- dts01 \cityviewlnk\Docs \2009 \SDP \SDP200900096 Camelot Pump Station - Final \CDE1_fsp_JPD_Camelot Pump Station.doc