Loading...
HomeMy WebLinkAboutWPO200900069 Review Comments Stormwater Management Plan 2009-12-07� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Gazebo Plaza Plan preparer: W.W. Associates; 1402 Greenbrier Pl, Charlottesville VA 22901 Owner or rep.: Spurzem, Richard; P.O. Drawer R, Charlottesville VA 22903 Plan received date: 30 Nov 2009 Date of comments: 7 Dec 2009 Reviewer: Glenn Brooks Stormwater Management Plan (WP0200900069) The "interim" stormwater management plan has been reviewed. This plan appears to be an attempt to leave the existing sediment basin in place, with very minor adjustments, on an otherwise undeveloped site. This plan cannot be approved. There is no need for an interim stormwater management plan on this property. None of the site is proposed to be development on an "interim" basis. When the owner requested bond releases, you, the owner and contractor were instructed that, in accordance with 4VAC50 -30 -40 minimum standard 18, the sediment trap must be removed. As a compromise, I propose that the dam be breeched, the pipes removed, and the breech stabilized with rip -rap, matting and permanent seeding. When this is stabilized along with the few remaining gulleys on the site, and there is no standing water or erosion, we will be in a position to release the bonds. File: E1 swm GEB GazeboPlaza.doc