HomeMy WebLinkAboutSDP200800125 Review Comments Final Site Plan and Comps. 2010-02-11Elizabeth Marotta
From: Justin Weiler [weiler @rivanna.org]
Sent: Thursday, February 11, 2010 2:04 PM
To: jlynn @serviceauthority.org
Cc: Michelle S. Simpson, PE; Elizabeth Marotta
Subject: Pavilions at Pantops Phase 3
Attachments: Flow Acceptance Review Pavilions at Pantops Phase 3 2 11 10.pdf
Jeremy,
RWSA has reviewed the plans for Pavilions at Pantops Phase 3 as prepared by W &W Associates and dated 1/8/2010 and
consents to the proposed construction as shown. All changes to the proposed work from that shown in the drawings shall
be approved in writing by RWSA prior to construction of the work. RWSA reserves all existing rights associated with its
easement, including (but not limited to) its rights to access, construction, operation, maintenance and repair of its facilities
within the easement, and such consent shall not be construed to modify or increase in any way RWSA's obligations, if
any, to repair and restore following such activities. All future construction or site improvements made within the RWSA
easement shall not limit, modify, or prohibit any existing easement rights held by the RWSA, nor modify or increase its
obligations, if any, to repair or restore.
I have attached a flow acceptance review letter for this project since Phase 3 was not included in the original flow
acceptance for Pavilions at Pantops.
Please let me know when the preconstruction conference is scheduled. Thanks.
Justin
Justin Sterling Weiler, E.I.T.
Civil Engineer
Rivanna Water and Sewer Authority
695 Moores Creek Lane
Charlottesville, VA 22902
Phone: 434.977.2970 ext.206
Fax: 434.295.1146