Loading...
HomeMy WebLinkAboutWPO200900059 Review Comments Bond Estimate 2009-12-07 (3)BOND ESTIMATE - EROSION CONTROL PROJECT NAME: Helleberg Property PROJECT NUMBER: WPO200900059 DATE OF ESTIMATE: 12/07/09 ESTIMATE BY: MRG BASED ON: Approved plan WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 1.8 1500 2700 SILT FENCE LF 1500 5 7500 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 1 500 500 INLET PROTECTION EA 0 200 0 OUTLET PROTECTION EA 0 200 0 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 12 30 360 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal 13060.00 project management 1959.00 subtotal 15019.00 CONTINGENCY LS 10% 1501.90 TOTAL 16520.90 BOND AMOUNT REQUIRED 16600.00 last revised:12 -5 -01