Loading...
HomeMy WebLinkAboutWPO200700082 Review Comments Bond Estimate 2010-08-20 (3)BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Ashcroft West PROJECT NUMBER: WPO- 2007 -00082 DATE OF ESTIMATE: 12/09/09 ESTIMATE BY: PBC BASED ON: Drawing Signed 12/1/09 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 10 1500 15000 SILT FENCE LF 2400 5 12000 DIVERSION DIKE LF 900 3 2700 SEDIMENT TRAP 1 ACRES 2.4 1000 2400 SEDIMENT TRAP 2 ACRES 3 1000 3000 SEDIMENT TRAP 3 ACRES 2.9 1000 2900 SEDIMENT TRAP 4 ACRES 0.92 1000 920 SEDIMENT TRAP 5 ACRES 1.29 1000 1290 CULVERT INLET PROTECTION EA 2 500 1000 OUTLET PROTECTION EA 2 200 400 EC -2 & 3 DITCH PROTECTION LF 4300 10 43000 RIP -RAP LF 50 55 2750 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal 89360.00 project management 13404.00 subtotal 102764.00 CONTINGENCY LS 10% 10276.40 TOTAL 113040.40 BOND AMOUNT REQUIRED 113100.00