HomeMy WebLinkAboutSDP200900100 Review Comments Final Site Plan and Comps. 2010-01-13ALg�,�� �'IRGINZ� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: SDP - 200900100 & WP0200900070, Pleasant Grove — Final Site Plan Plan preparer: AC Shelton (ac00 @comcast.net) Owner or rep.: Pleasant Grove Baptist Church C/O James E Thomas Date received: 16 December 2009 Date of Comment: 13 January 2010 Engineer: John P. Diez — Engineering Technician The Final Site Plan for Pleasant Grove, received on 16 December 2009 has been reviewed. The plan cannot be approved as submitted and will require the following corrections before approval can be granted: A. General Review Comments 1. All slopes 25% and over (critical slopes by County Zoning Ordinance) must be shaded [18- 32.6.6] 2. Please specify on the plans that "All proposed slopes steeper than 3:1 must be provided with low maintenance (not grass) ground cover. 3. All entrances must have VDOT designations (PE -1, CG -9a, etc.) 4. Please provide unobstructed sight distance triangles at the entrance. 5. !2.5' minimum radii at the entrance (or per VDOT requirements, typically 25' -35') must be provided. 6. VDOT approval must be obtained for any plan affecting public right -of -way. 7. Some parking areas exceed the 5% grade minimum. Please revise. 8. Parking width x depth x aisle width is 9'x18'x24' or 10'x18'x20' (where a 2' grass overhang is possible, parking spaces can be 16' deep per detail 2 of the Design Standards Manual). [18- 4.12.16] 9. Sidewalks abutting parking must be a minimum of 6' wide (exclusive of curb), or bumper blocks must be provided. Please refer to the Design Standards Manual. 10. Sidewalks must be a minimum of 5' wide, exclusive of curb. Please refer to the Design Standards Manual. 11. Please provide a pavement design detail. 12. Please show all existing utilities on the plans. 13. Please provide a tree survey showing existing trees within the No Disturbance Zones. B. SWM Plan Review Comments 14. Manufactured pre- fabricated water quality facilities must have a written approval from the manufacturer. 15. A completed copy of the standard stormwater maintenance agreement and fee for recordation for any stormwater management facilities must be submitted. [17 -304E] 16. Please provide a drainage profile for the proposed stormwater pipes. 17. Please provide details and computations for the control riser for storm water detention. 18. Please provide coefficient and time of concentration for each drainage area. 19. Please provide an adequate channel analysis (MS -19). C. Erosion and Sediment Control Review Comments 20. Please provide an Erosion and Sediment Control Narrative. 21. It appears that the sediment trap will not capture most of the runoff during construction. Engineering recommends that the sediment trap be moved to the south side of the site (by the proposed SWM outlet). In addition, please provide a diversion dike along the southeast side of the site to capture and direct the runoff to the sediment trap. 22. Please provide details and computations for the sediment trap. 23. The diversion dike on the northeast side of the site is not necessary; Please remove. 24. Silt fence must not be installed across contours. Please remove the silt fence on the northeast side of the site. 25. Please provide dust control (DC) on the plans. 26. Please provide temporary and permanent seeding (TS, PS) on the plans. 27. Please provide a stockpile and staging area. 28. Please provide a construction sequence. 29. Please install outlet protection to all proposed outlets. \\ Cob- dts01 \cityviewlnk \Docs \2009 \SDP \SDP200900100 Pleasant Grove- Final \CDE1_fsp _ rp_JPD_09 -100 - Pleasant Grove.doc