Loading...
HomeMy WebLinkAboutSP200800056 Review Comments Special Use Permit 2010-01-05ALB��� � vIRGIT`�� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 January 4, 2010 Mr. Justin Shimp Dominion Development Resources 172 South Pantops Drive Charlottesville, VA 22911 RE: SP 2008 -00056 Unity Church Dear Mr. Shimp: County staff has reviewed the resubmitted concept plan for the development proposal referenced above. Our comments are given below. Division of Zoning and Current Development 1. A site plan amendment will be required. 2. This site will need to meet all the requirements for final site plans and the Water Protection Ordinance. The computations submitted with the special use permit can be reviewed with the final plans. It is unlikely that this much parking can be added without requiring the biofilter to be enlarged, but enlargement appears feasible, so review of this detail can be deferred to final plans. Likewise, it appears curbing will be required, although it does not appear to be on this drawing. Unless waivers are specifically requested and granted with the SP, the ordinance requirements will need to be met. 3. The total number of parking spaces indicated in the notes is not consistent with the number of spaces shown on the drawings. The total given in 147 spaces, but 134 are shown on the revised concept plan. Further, the total for grass -paved spaces is given as 48, but 35 are shown on the plan. Also, 11 grass -paved spaces are mislabeled as 12. Please clarify /correct the numbers. 4. County staff has not received a Parking Study that meets the requirements of Section 4.12.6 of the Zoning Ordinance. The applicants will need to submit a parking study in writing in order to provide a basis or justification for the 147 (134 ?) proposed spaces. 5. Are other buildings being used for the congregation or other activities while the sanctuary is being used? If the answer to this question is "yes," then it will change the parking needs and will affect your parking study described in #4 above. 6. The County Engineer has indicated that "grass pave" surfaces have been very unsuccessful in Albemarle County. Therefore, he cannot support the use of this product. However, a plan could be approved with "pervious pavers" or a "pervious block or paving type" in general. SP 2008 -056 Unity Church Comment Letter, January 4, 2010 7. Staff would like to see screening between the parking spaces and US 29. We will coordinate this request with comments made by the Architectural Review Board (see below). Architectural Review Board Comments will be provided after the Architectural Review Board (ARB) reviews your proposal on January 19, 2010. These comments will be in addition to those given in this letter. Please make the revisions that have been identified as necessary for preliminary approval by the Site Review Committee. If you choose not to make the requested revisions, please submit in writing justification for not incorporating such revisions. Submit seven full size copies of the proposed site plan and one 11" x 17" or legible reduced copy to the Community Development Department. Please contact me at your earliest convenience to discuss these comments. My email address is jwiegand @albemarle.org and my phone number is 434/296 -5832, ext. 3438. Sincerely, Judith C. Wiegand Senior Planner Cc: Unity Church of Charlottesville 2825 Hydraulic Road Charlottesville, VA 22901