SDP - 2009 -00089 Airport Road Office Plaza - Final Site Plan
SDP - 2009 -00089 Airport Road Office Plaza - Final Site Pla
Elizabeth,
I received a new plan for Airport Road Office Plaza from Timmons and all VDOT comments have been adequately
addressed and I have no additional comments.
Thanks
Joel
Joel DeNunzio, P.E.
Staff Engineer
434 - 293 -0011 Ext. 120
joel.denunzio@vdot.virginia.gov
From: DeNunzio, Joel D., P.E.
Sent: Wednesday, December 16, 2009 10:43 AM
To: 'Elizabeth Marotta'
Cc: Amy Pflaum; 'Frank Pohl'
Subject: SDP - 2009 -00089 Airport Road Office Plaza - Final Site Plan
SDP - 2009 -00089 Airport Road Office Plaza - Final Site Plan
Elizabeth,
I have reviewed the above referenced site plan and have the following comments:
1. The installation of the waterline that is to be done by others will need to be in accordance with VDOT Land Use
Permit Manual and is the surface coarse asphalt is on Timberwood, one lane needs to be overlaid.
2. The pavement section from existing Timberwood Blvd to the ROW line needs to be the same material as
Timberwood and most likely includes a base asphalt.
3. Standard VDOT drawings on sheet C6.1 are out of date. Drawings from the 2008 Road and Bridge Standards need
to be used.
Provide an entrance profile for the proposed entrance to Timberwood Blvd.
If you have any questions or comments, please let me know.