Loading...
HomeMy WebLinkAboutSDP200900091 Review Comments Final Site Plan and Comps. 2010-01-21J � � vIRGIN�' County of Albemarle Department of Community Development Memorandum To: Gerald Gatobu, Principal Planner From: Amy Pflaum, Engineering Review Division: Current Development Date: December 8, 2009 REV #1: January 21, 2010 ect: Arden Place A )lex - Final Site Plan SDP2( & WPO200900062 The final site plan for the Arden Place Apartment Complex, resubmitted on January 12, 2009, has been reviewed. Current Development Engineering has the following comments (please note that,,§ince the previous letter was in DRAFT form, the order of the comments has changed): Final Site Plan Comments 1. Please show the proposed access easements to be granted for the Carmike connection. [18- 32.7.4] REV #1: Comment not addressed, eA#Ment is not seen on the site plan. 2. Please designate safety slabs (SL -1) is taller than 12 -feet (STR 48 6. The location of the matchline on Sheet S -3 makes it difficult to review details of the proposed Carmike connection crossing the existing drainageway. Are the Bridge Details on Sheet SWM -1 related to this crossing? Please provide more graphic information about the crossing on the street plan and profile and the grading plan. Also provide the hydraulic computations. REV #1: Comment has been addressed. Further graphical information has been added. The Existing Condistions Sheet and Site Plan appear to show a `fence' running with the new tree line. Is this a permanent or existing fence? If not, please remove from the site plan. Please do not show the proposed tree line on the Existing Conditions Sheet. 8. The existing 24 -inch pipes into and out of the existing sediment basin on TMP 61 -124E do not show up on the Drainage Plan. Private Road Plan Comments \\ Cob- dts01 \cityviewlnk\Docs \2009 \SDP \SDP200900091 Arden P1ace \CDE1_ fsp_ADP_09 -00091 Arden Place.doc