HomeMy WebLinkAboutSDP200600041 Review Comments Final Site Plan and Comps. 2010-01-22Elizabeth Marotta
From:
Jeremy Lynn [jlynn@serviceauthority.org]
Sent:
Friday, January 22, 2010 8:49 AM
To:
Philip Custer; Justin Weiler
Cc:
Elizabeth Marotta; 'Gary Whelan'
Subject:
RE: Briarwood Stormwater Plan Comments
Phil, the ACSA is prepared to sign the mylars. Let Gary know when they are available.
From: Philip Custer [mailto:pcuster @albemarle.org]
Sent: Thursday, January 07, 2010 10:22 AM
To: Jeremy Lynn; Justin Weiler
Cc: Elizabeth Marotta
Subject: RE: Briarwood Stormwater Plan Comments
We can do that. Are you okay with two copies of just the site plan or do you want any of the road, esc, and swm
packages?
From: Jeremy Lynn [mailto:jlynn @serviceauthority.org]
Sent: Thursday, January 07, 2010 10:07 AM
To: Philip Custer; Justin Weiler
Cc: Elizabeth Marotta
Subject: RE: Briarwood Stormwater Plan Comments
Phil, we will need a revised set of plans to re -issue our approval. Can you have the engineer provide us with 2 sets?
From: Philip Custer [mailto:pcuster @albemarle.org]
Sent: Wednesday, January 06, 2010 10:49 AM
To: Justin Weiler; Jeremy Lynn
Cc: Elizabeth Marotta
Subject: RE: Briarwood Stormwater Plan Comments
Is this RWSA's official approval for the whole project? If so, is this now ACSA's official approval for these phases of
Briarwood?
From: Justin Weiler [mailto:jweiler @rivanna.org]
Sent: Wednesday, January 06, 2010 10:32 AM
To: Philip Custer; 'Jeremy Lynn'
Cc: bReese @enggroupe.com; Michelle S. Simpson, PE; jMatusik @enggroupe.com; Ulcwww @embarqmail.com
Subject: RE: Briarwood Stormwater Plan Comments
Phil and Jeremy,
RWSA has reviewed sheet 11 of the Stormwater Management Plan for Briarwood Phases 1 A -1, 1 B -1, 4 and 8 that was
prepared by The Engineering Groupe and dated 12/29/09. It appears that RWSA previous comments regarding these
plans (comments were dated 12/18/09) have been adequately addressed. Please let me know if you need anything else
from RWSA at this time. Thanks.
Justin
Justin Sterling Weiler, E.I.T.
Civil Engineer
Rivanna Water and Sewer Authority
695 Moores Creek Lane
Charlottesville, VA 22902
Phone: 434.977.2970 ext.206
Fax: 434.295.1146
From: jMatusik @enggroupe.com [mailto:jMatusik @ enggroupe.com]
Sent: Tuesday, December 29, 2009 3:47 PM
To: jweiler @rivanna.org; Ulcwww @embarqmail.com
Cc: bReese @enggroupe.com; bwichser @rivanna.org; jwhitaker @rivanna.org; msimpson @rivanna.org;
pcuster @albemarle.org
Subject: RE: Briarwood Stormwater Plan Comments
Justin,
Attached is the drawing showing the revisions per comments 1 -3 below. I have added cross section W -W at
the crossing of the outfall ditch and the RWSA waterline; the label " VDOT Std. Cl. I rip -rap" label has been
added to the plan view, and the profile view of the outfall ditch shows the modified proposed grade of the
outfall ditch matching existing grade to allow RWSA to traverse the easement without any hindrance.
Please contact me if you have further questions.
Thanks for your help.
John Matusik PE, LEED AP
Vice President
The Engineering Groupe, Inc.
13580 Groupe Drive, Suite 200
Woodbridge, VA 22192
Ph. (703) 670 -0985
Fx. (703) 670 -7769
www.enggroupe.com
From: Justin Weiler [mailto:jweiler @ rivanna.org]
Sent: Monday, December 28, 2009 9:27 AM
To: Ulcwww @embarqmail.com
Cc: John Matusik; Bruce Reese; 'Robert Wichser'; jwhitaker @rivanna.org; 'Michelle Simpson'
Subject: FW: Briarwood Stormwater Plan Comments
O0a ••.1
This morning I received the voice mail that you left me on 12/23. My understanding is that you were concerned because
you thought that RWSA had not finished reviewing the Stormwater Management Plans for Briarwood Phases 1 A -1, 1 B -1,
4 and 8. RWSA sent comments out for these plans on 12/18. The email that was sent on 12/18 is shown below. Please
let me know if you need anything else from RWSA at this time. Thanks.
Justin
Justin Sterling Weiler, E.I.T.
Civil Engineer
Rivanna Water and Sewer Authority
695 Moores Creek Lane
Charlottesville, VA 22902
Phone: 434.977.2970 ext.206
Fax: 434.295.1146
From: Justin Weiler [mailto:jweiler @rivanna.org]
Sent: Friday, December 18, 2009 2:34 PM
To: 'Jeremy Lynn'
Cc: JMatusik @enggroupe.com'; 'bReese @enggroupe.com'; 'Michelle Simpson'
Subject: Briarwood Stormwater Plan Comments
Jeremy,
RWSA has reviewed the Stormwater Management Plan for Briarwood Phases 1 A -1, 1 B -1, 4 and 8 that was prepared by
The Engineering Groupe and dated 12/3/09 and has the following comments for the engineer:
1. On sheet 11, please show a cross section of the outfall ditch for Pond #1 at the crossing of the RWSA waterline.
2. On sheet 11, please call out that the outfall ditch for Pond #1 will be lined with Class 1 Riprap.
3. On sheet 11, the current profile for the outfall ditch for Pond #1 shows no grading directly over the waterline, but
the cut immediately downstream of the waterline crossing may hinder RWSA from traversing its easement and
maintaining its waterline. Please modify the slope of the ditch where it crosses the RWSA easement so that it is
not steeper than the current grade, while maintaining no cut over the RWSA waterline.
4. Please note that although not required for County approval, the stormwater piping to Pond #4 may need to be
modified in association with maintaining conformance to ACSA's approval letter (dated 10/20/2009) which states
"the approval is expressly subject to a resolution of a boundary line dispute between Rivanna Water and Sewer
Authority and Woodbrair Associates."
Please let me know if you have any questions or concerns. Thanks.
Justin
Justin Sterling Weiler, E.I.T.
Civil Engineer
Rivanna Water and Sewer Authority
695 Moores Creek Lane
Charlottesville, VA 22902
Phone: 434.977.2970 ext.206
Fax: 434.295.1146
NOTICE: This email and any files transmitted with it are confidential and intended solely for the use of the
individual or entity to whom they are addressed. If you receive this email message in error, notify the sender by
email and delete the email without reading, copying or disclosing the email contents. The unauthorized use or
dissemination of any confidential or privileged information contained in this email is prohibited.