Loading...
HomeMy WebLinkAboutSDP200800125 Review Comments Traffic Study 2010-01-22Elizabeth Marotta From: DeNunzio, Joel D., P.E. [ Joel .DeNunzio @VDOT.virginia.gov] Sent: Friday, January 22, 2010 1:51 PM To: Elizabeth Marotta Subject: RE: pavillions at pantops Elizabeth, There calculations for 81 towhnhomes/ condominiums generating 537 trips according to land use code 230 are correct. Typically a single unit house generates approximately 10 trips per day but when you go to condos, apartments and townhomes, you see values are 6 trips per day per unit. Thanks Joel From: Elizabeth Marotta [mailto:emarotta @albemarle.org] Sent: Friday, January 22, 2010 1:23 PM To: DeNunzio, Joel D., P.E. Subject: pavillions at pantops Joel, Pavillions at pantops Phase 3 has resubmitted plans to me and addressed comments from the previous submitta.. I see you approved the plans back on Dec 10, but I need to consult with you on one issue: The traffic counts they presented in the set you reviewed and approved were significantly less than on previous submittals (currently they are stating estimated traffic generation at 537 ADT for 81 townhouse units) I asked them to please address the decrease, and their response was: The traffic number previously reported was based on 10 vehicle trips per day per unit. The traffic generation number now reported is based on the ITE 7`" Edition Trip Generation (for townhouse ITE Code 230 equation Ln(T) =0.85 Ln(X)2.55). A copy is attached for your used. I just need to verify with you that you reviewed the change and find this method acceptable. Elizabeth M. Marotta Senior Planner County of Albemarle Community Development Department 401 McIntire Road Charlottesville, VA 22902 (434) 296 -5832 Ext. 3432