Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200900013 Review Comments Bond Estimate 2010-01-25 (3)
BOND ESTIMATE - EROSION CONTROL PROJECT NAME: Van Dine Plaza PROJECT NUMBER: WPO200900013 DATE OF ESTIMATE: 01/25/10 ESTIMATE BY: JPD BASED ON: $3,165.00 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 2.11 $1,500.00 $3,165.00 SILT FENCE LF 607 $5.00 $3,035.00 SAFETY FENCE LF 0 $3.00 $0.00 TEMPORARY FILL DIVERSION LF 0 $3.00 $0.00 DIVERSION DIKE LF 413 $3.00 $1,239.00 TEMPORARY SLOPE DRAIN LF 0 $20.00 $0.00 SEDIMENT TRAP 1 ACRES 1.9 $1,000.00 $1,900.00 SEDIMENT TRAP2 ACRES 0 $1,000.00 $0.00 CULVERT INLET PROTECTION EA 0 $500.00 $0.00 INLET PROTECTION EA 5 $200.00 $1,000.00 OUTLET PROTECTION EA 1 $200.00 $200.00 EC -2 & 3 DITCH PROTECTION LF 0 $10.00 $0.00 RIP -RAP LF 0 $55.00 $0.00 CHECK DAMS SQ.YD. 0 $30.00 $0.00 STREAM CROSSING TYPE I EA 0 $1,000.00 $0.00 STREAM CROSSING TYPE II EA 0 $3,000.00 $0.00 STREAM CROSSING TYPE III EA 0 $5,000.00 $0.00 PAVED CONSTRUCTION ENTRANCE EA 1 $2,000.00 $2,000.00 SUBTOTAL 12539.00 PROJECT MANAGEMENT LS 15% 1880.85 TOTAL 14419.85 PROJECT ADMINISTRATION 10% 1441.985 BOND AMOUNT REQUIRED FF 15900.00 Spreadsheet last revised: 12-5-01