Loading...
HomeMy WebLinkAboutWPO200900062 Review Comments Bond Estimate 2010-02-02BOND ESTIMATE - EROSION CONTROL PROJECT NAME: Arden Place PROJECT NUMBER: WPO200900062 DATE OF ESTIMATE: 02/02/10 ESTIMATE BY: MRG BASED ON: E &SC submittal WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 15.6 1500 23400 SILT FENCE LF 1000 5 5000 WIRE SUPPORTED SILT FENCE LF 2000 10 20000 SAFETY FENCE LF 1700 3 5100 TREE PROTECTION FENCE LF 3200 5 16000 TEMPORARY FILL DIVERSION LF 1000 3 3000 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 80 20 1600 SEDIMENT TRAP 1 ACRES 0.94 1000 940 SEDIMENT TRAP 2 ACRES 2.47 1000 2470 SEDIMENT BASIN 1 ACRES 16.9 1000 16900 SEDIMENT BASIN 2 ACRES 4.5 1000 4500 CULVERT INLET PROTECTION EA 1 500 500 INLET PROTECTION EA 35 200 7000 OUTLET PROTECTION EA 6 200 1200 UTILITY STREAM CROSSING EA 1 1000 1000 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 2 30 60 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal 110670.00 project management 16600.50 subtotal 127270.50 CONTINGENCY LS 10% 12727.05 TOTAL 139997.55 BOND AMOUNT REQUIRED 140000.00 last revised:12 -5 -01