Project:
Plan preparer:
Owner or rep.:
Plan received date
Date of comments:
Reviewer:
Force Main and Gravity Sewer Project
Whitman, Requardt and Assoc., LLP
University of Virginia Foundation
24 Jan 2004
1 March 2004
Max Greene
WP0201000006
[fax (804) 272 -88971
[fax Unknown]
The 60% complete E &SC plan for the Force Main and Gravity Sewer Project submitted 28 January 2010
has received Engineering review. The following comments will be adequately addressed prior to final
approval.
Plan does not appear to have adequate perimeter controls on several of the plan sheets. Only one copy of
the plan was submitted so no redlined copy can be sent back to designer, a meeting is requested to discuss
adequate E &SC protection. Current Development Engineering is available from 2:30 -4 PM on Thursdays
to discuss these review comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email
m ,greene @albemarle.org to schedule an appointment.
Erosion Control Plan (WP0201000006)
a. Please label the beginning and ending locations of linear E &SC measures, such as silt
fence and diversions, for the inspector and contractor.
b. Sediment control structures will be designed for pre -, during- and post- construction
drainage areas. The measures will be designed to the larger of the drainage areas. All
sediment control structures will be installed prior to land disturbance in each drainage
area.
c. Tree protection will be shown 5' outside the actual drip edge of each tree to be protected.
No other activity can occur within the limits of tree protection. Please move all other
E &SC measures out of the tree protection limits.
d. Silt fence outlet protection is not an approved State standard and will require a variance
request submitted to the Program Administrator for approval. Please state in the variance
why the standards of VESCH are not adequate for this application.
e. VDOT approval will be required for work in right -of -way.
Once these comments have been addressed, please submit 3 copies of the revised plans, calculations, and
narratives to Current Development Engineering. Due to the required changes /corrections to the E &SC
plan, additional comments or conditions will be forthcoming.