Loading...
HomeMy WebLinkAboutWPO201000006 Review Comments Erosion Control Plan 2010-03-02� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer: Owner or rep.: Plan received date Date of comments: Reviewer: Force Main and Gravity Sewer Project Whitman, Requardt and Assoc., LLP University of Virginia Foundation 24 Jan 2004 1 March 2004 Max Greene WP0201000006 [fax (804) 272 -88971 [fax Unknown] The 60% complete E &SC plan for the Force Main and Gravity Sewer Project submitted 28 January 2010 has received Engineering review. The following comments will be adequately addressed prior to final approval. Plan does not appear to have adequate perimeter controls on several of the plan sheets. Only one copy of the plan was submitted so no redlined copy can be sent back to designer, a meeting is requested to discuss adequate E &SC protection. Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email m ,greene @albemarle.org to schedule an appointment. Erosion Control Plan (WP0201000006) a. Please label the beginning and ending locations of linear E &SC measures, such as silt fence and diversions, for the inspector and contractor. b. Sediment control structures will be designed for pre -, during- and post- construction drainage areas. The measures will be designed to the larger of the drainage areas. All sediment control structures will be installed prior to land disturbance in each drainage area. c. Tree protection will be shown 5' outside the actual drip edge of each tree to be protected. No other activity can occur within the limits of tree protection. Please move all other E &SC measures out of the tree protection limits. d. Silt fence outlet protection is not an approved State standard and will require a variance request submitted to the Program Administrator for approval. Please state in the variance why the standards of VESCH are not adequate for this application. e. VDOT approval will be required for work in right -of -way. Once these comments have been addressed, please submit 3 copies of the revised plans, calculations, and narratives to Current Development Engineering. Due to the required changes /corrections to the E &SC plan, additional comments or conditions will be forthcoming. File: E1_esc_MRG_Force Main and Gravity Sewer Project.doc