HomeMy WebLinkAboutWPO201000007 Review Comments Erosion Control Plan 2010-02-16ALg�,�� �'IRGINZ� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Vierbuchen Residence; WPO- 2010 -00007 Plan preparer: Mr. Alan Franklin, PE and Mr. Mark Keller, CLA; Terra Concepts, PC Owner or rep.: Mr. Richard Vierbuchen Date received: 29 January 2010 Date of Comment: 16 February 2010 Engineer: Phil Custer The ESC plan for Vierbuchen Residence has been reviewed. The following comments are provided. 1. Critical slopes are disturbed with this plan. And, because a 401000sf building site exists on the property, I do not think the disturbance is exempt. I have forwarded the plan to the Zoning Administrator for a determination on this matter. This waiver would be considered by the Planning Commission if the Zoning Administrator determines it is needed prior to plan approval. 2. Is earth disturbance occurring between the `Y' in the driveway and the state route? If not, please move the construction entrance farther into the site where it can be protected by already proposed ESC measures. If this section of the driveway is proposed to be disturbed, please provide more silt fence in this corner of the site. (If the gravel driveway is simply being paved, no ESC measures are necessary and the construction entrance should be moved farther into the site.) 3. Is the diversion ditch intended to be temporary? If so, please provide a note indicating that the diversion is to be removed at the same time as the trap, once the rest of the site is stabilized. If the ditch is to be permanent, please extend the channel to an adequate channel. 4. Please remove all references to straw bale barriers in place of silt fence in the plan and narrative. We feel that straw bale barriers are ineffective and problematic in the field. Also, the proper installation of the straw bale barriers requires trenching as well. 5. Please provide dust control symbols on the plan. [DM] 6. In step 2 of the construction sequence, please state that the trap and diversion should be constructed after the pond is drained. 7. An ESC bond will be calculated at the time of plan approval. File: El_esc_PBC _ wpo- 2010 -00007 Vierbuchen Residence.doc