HomeMy WebLinkAboutSDP200100089 Approval - County Final Site Plan and Comps. 2001-12-06Albemarle Gunty . 0 ServiceAuthAin!Y Serving • Conserving Mr. Eric Woolley The Cox Company 220 East High Street Charlottesville, Virginia 22902 Re: Monticello Fire & Rescue Dear Mr. Woolley: December 6, 2001 The plans, entitled "Monticello Fire & Rescue" dated August 10, 2001, last revised November 20, 2001, are hereby approved for construction. One set of approved plans is enclosed for yourrecords. Any previously approved plans are voided with this approval. This approval is for basic compliance with the General Water & Sewer Construction Specifications of the Albemarle County Service Authority and does not relieve the -contractor from responsibility for his work as it relates to the plans and'specifications. The Albemarle County Service Authority requires that a copy of the approved construction plans be on the job site. It is .the contractor's responsibility to mark up a copy of the approved construction plans showing as -built information and provide this data to your client at the completion of utility installation. Final as -built plans shall be submitted in a digital format. A preconstruction conference shall be scheduled with the project manager to ensure coordination and answer any questions. This will be a short meeting to review the project, materials, test methods and schedule, in order to expedite construction. Please have the proper party call me at 977-4511 to schedule the meeting. ,? This approval is valid for a period of eighteen (18) months from this date. If construction is not in progress at the end of this time period, the approval shall be void. (ThP pre -,-.;tire for wn,ter may PxrPPd 80 nsi at some meter locations). If you have any questions or if we can be of assistance, please advise us. CAS:dmg cc: Co. of Albemarle State Health Dept. L,,P anning Dept. Bldg. Codes & Zoning Services Soil Erosion Inspector Scott Moms, ACSA Inspector 168 Spotnap Road • P.O. Box 2738 • Sincerely, ,,Christopp . ephan, P.E. Civil Engineer Charlottesville, VA 22902 • Tel (434) 977-4511 • Fax (434) 979-0698 1�p www.acsanet.com FAX (434) 972-4126 �N of AL6��r I `rRG1 COUNTY OF ALBEMARLE 10 _' 0- 0 ti 0 U: 3 0 1 N Department of Building Code and Zoning Services 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 TELEPHONE (434) 296-5832 MEMORANDUM TO: Margaret Doherty, Planner FROM: Susan Carol Snead, Zoning Plans Reviewer DATE: October 8, 2001 RE: SPD 01-089 Monticello Fire/Rescue Station Final Site Plan Revised October 1, 2001 TTD (434) 972-4012 Final tentative approval from the Department of Building Code and Zoning Services will be subject to the following conditions: (The following conditions are those that have been identified at this time. Additional conditions may be added or eliminated based on further review.) [4.17.4] A note most appear on the Final Mylar stating that the inground luminaires will emit less than 3000 initial lumens. Please contact me if you have questions or require additional information. Margaret Doherty From: Margaret Doherty Sent: Friday, September 28, 2001 4:34 PM To: Ron Lilley; 'Eric Woolley' Subject: Monticello Fire & Rescue The Department of Planning and Community Development hereby grants tentative approval of the final site plan. When all other reviewing agencies have granted tentative approval, please submit two mylar copies and one paper copy of the final site plan for signature. I will sign the mylars when all other reviewing agencies have signed. Let me know if you need any help with other agencies. Ma rg-cwet-ocherty Principle Planner Albemarle County Department of Planning and Community Development 401 McIntire Road Charlottesville, VA 22902 PH (804) 296-5823 x3250 FX (804) 972-4012 THE COX COMPANY Planners • Landscape Architects Civil Engineers • Urban Designers TO: Ms. Margaret Doherty Re: Monticello F&R Final Site Plan Company: County of Albemarle Transmittal I Date September 28, 2001 FROM: Eric Woolley job #: 00-60 Subject: Final Site Plan I Transmitted Via: ❑ FedEx ❑ USPS ❑ UPS ® Hand ❑ Other Transmitted Items: (1) Full Size Copy of revised Final Site Plan, cover dated: October 1, 2001 Margaret, In response to the SPIN comments you presented to me dated 8/28/01, I offer the following: 1. The special use permit number has been added to the general notes on sheet 1.00 of the plan. 2. The note you requested has been added to the site plan (sheet 3.00). 3. All other reviewing agencies are being coordinated with separately. I have attached a copy of the site plan for your file and review. Please feel free to call with any additional concerns. Thank you, Eric CC: File With Attachments: RECEIVED SEP c 8 20m 804.295.7131 220 East High Street Charlottesville, Virginia 22902 Planning Dept. O r - �'IRGII3IP COUNTY OF ALBEMARLE Department of Building Code and Zoning Services 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 FAX (804) 972-4126 TELEPHONE (804) 296-5832 TTD (804) 972-4012 September 11, 2001 Ron Lilley Albemarle County Engineering Department 401 McIntire Road Charlottesville, VA 22902 RE: SDP SDP2001 — 089 Monticello Fire & Rescue Station #11Final Site Plan Dear, Mr. Lilley Your tentative plan submission has been distributed to the reviewing agencies and the attached comments have been received. Please review the comments and revise the plan of the proposed development accordingly. Your revisions should be resubmitted directly to the commenting agency. If not previously submitted the landscaping and lighting plans should be submitted to both the Planning Department and the Building Code and Zoning Service Department. If not previously submitted your Erosion Control Plan should be submitted directly to the Engineering Department. I have not received comments from the Albemarle County Service Authority. I will forward those comments when I receive them. After all approvals have been received the final site plan may be submitted for signing. For final site plan submittal you will need to submit two mylar copies of the site plan (the original and a copy for County records) along with a $325 fee and completed application to the Planning Department. Submittals are received each Monday and the plan will be signed within one week of submittal. If you have any questions about the comments of a specific agency please contact that agency directly. If you have any questions about the review process please feel free to contact me. Sincerely, William D. Fritz, AICP Development Process Manager Albemarle County Development Departments SDP-2001-089 SPIN Submission and Comments Monticello Fire & Rescue Station #11 Final Engineering [description and date] revision 1 reviewer received reviewed decision Glenn Brooks 8/17/01 9/10/01 requested changes Project: Monticello Fire & Rescue Station Plan preparer:The Cox Company (fax 295-7540) Owner or rep.:Ron Lilley Plan received date:20 Aug 2001 (site plan) Date of comments:5 Sep 2001 Lead Engineer:Glenn Brooks, Senior Engineer A. Final site plan and drainage computation comments: (Glenn) 1. Drainage computations have not been received. -2. Materials specification or details were not found for the parking areas or asphalt sidewalk. 3. VDOT approval is required. Comments are attached. 4. Please provide a more gradual transition of travelway width from the entrance apron. 5. A ditch is needed next to the travelway at the toe of the slope. A good illustration of this is provided under E&S slope protection p.111-367. B. Road plan and drainage computation comments: (Glenn) 6. At this time the roads are being considered private travelways to serve the fire station property. The initial section of travelway grades appears adequate to serve any future road which may be placed along the same alignment. Similarly, the travelway to serve the parking lots next to the building is not being reviewed as a roadway at this time. When used to access the property in the rear, it may continue to be considered a travelway for inter -parcel access, rather than a private road. It is noted however that VDOT standards for non-residential roads allow a 24' width with parking restricted, or a 30' width with parking allowed. VDOT standards do not allow perpendicular parking spaces along roadways. C. Stormwater management plan comments: 7. Stormwater management is addressed with the facilities built on the Monticello High School property. D. Erosion and sediment control plan comments: (Max Greene, Erosion Control plan reviewer) #2164 Monticello Fire & Rescue Station Max GreeneSeptember 5, 2001 Suggested E&S review comments. Narrative: 8. Calculations - Detailed calculations for the design of temporary sediment basins, permanent stormwater detention basins, diversions, channels, etc. Include calculations for pre- and post - development runoff. Plan Sheet: 9. Show haul roads to stockpile area. 10. Move temporary paved construction entrance to the west enough to grade the proposed roadbed without effecting the egress / ingress to the site until the road bed can be utilized for the new paved construction entrance. 11. The sediment trap "C" should be moved downslope to allow for the safe use of the temporary paved 9/11/01 10:28 AM Page 1 of 5 Albemarle County Development Departments SDP-2001-089 SPIN Submission and Comments Monticello Fire & Rescue Station #11 Final Engineering [description and date] revision 1 reviewer received reviewed decision Glenn Brooks 48/17/01 9/10/01 requested changes construction entrance. 12. Move sediment trap "B" downslope to accommodate new stockpile area on the eastern portion of the site. 13. Show how site is to be protected from start to finish..... the existing drainage direction is proposed to change 180 degrees and nothing is shown to stop the storm flows into Mill Creek Drive. 14. Show details and calculations for B/M Swale along the proposed temporary road. Show the swale grading on the plan sheet. 15. Plan must meet or exceed the requirements of MS-8. 16. Silt fence does not work as shown on plan sheet. Silt fence must all be installed at the same ground elevation or a modified sediment trap must be included at the bottom of the swale or low point to capture concentrated runoff. Silt fence is not adequate for lengths of stormflow over 100', you maybe able to incorporate a weir located in the lowest spot along the silt fence to allow for a high flow filter system that may suffice. However, if the inspector finds that the controls are not working then he will ask for a proper trap to be installed in the locations that silt fence has proven to be insufficient. This sediment trap may be constructed as a field modification provided the County's Erosion Control Inspector approves it. 17. All storm drain structures shall empty into a sediment control structures until the site is considered stabilized by the Engineering Department. 18. These comments may not be all inclusive due to required changes. 19. E&S portion of the Water Protection Bond could not be determined at this time. Engineering Department approval of the construction plans will be given when "all comments have been addressed" for items A-D above. A grading permit will be issued when approvals have been granted from all applicable departments and agencies, and erosion control bond has been posted, and a pre - construction conference held with the contractor, owner and county staff. Attachment: (none) Copy:file 2164 File: Monticello Fire Station fsp ecp 2164 (1).doc 9/11/01 10:28 AM Page 2 of 5 e Albemarle County Development Departments SDP-2001-089 SPIN Submission and Comments Monticello Fire & Rescue Station #11 Final Planning Final Site Plan revision 1 reviewer received reviewed decision Margaret Doherty 8/17/01 8/28/01 requested changes The Department of Planning and Community Development will not approve the final plan until the following items have been satisfactorily addressed: 1. Please put the Special Use Permit approval number "SP-00-39" with the zoning information; 2. Please add the following notes to the Site Plan: "When the property to the east is developed, the sidewalk along. the public driveway shall be extended to that property, and an additional sidewalk, connecting the future building to the fire and rescue station shall be provided"; and 3. All other reviewing agency approvals. 9/11/01 10:28 AM Page 3 of 5 e Albemarle County Development Departments SDP-2001-089 SPIN Submission and Comments Monticello Fire & Rescue Station #11 Final Service Authority [description and date] revision 1 reviewer received reviewed decision unassigned 8/17/01 9/11/01 10:28 AM Page 4 of 5 it Albemarle County Development Departments SDP-2001-089 SPIN Submission and Comments Monticello Fire & Rescue Station #11 Final Zoning [description and date] revision 1 reviewer received reviewed decision susan snead 8/17/01 9/6/01 requested changes FROM: Susan Carol Snead, Zoning Plans Reviewer DATE: September 6, 2001 RE: SPD 01-089 Monticello Fire/Rescue Station Final Site Plan Final tentative approval from the Department of Building Code and Zoning Services will be subject to the following conditions: (The following conditions are those that have been identified at this time. Additional conditions may be added or eliminated based on further review.) 1. [4.17.4] The proposed ingrade luminaire (Hydrel 9100 Series) does not comply with the Ordinance and cannot be approved. 2. [4.12.6.6] The required number of parking spaces is 16. Please revise the note on the plan. 9/11/01 10:28 AM Page 5 of 5 i MEMORANDUM From: Bill Fritz To: �Margaret-Dofterty Glenn Brooks Pete Gorham Susan Snead Date: August 17, 2001 BE: SUP2001- 089 Monticello Fire a Rescue Station #11 Final Site Plan [Tentative Application Submittall The attached plan and preliminary approval letter are being distributed to you for tentative approval. Please review these plans and enter your comments into SPIN by September 7, 2001.1 will distribute the comments to the applicant and advise the applicant to work with each of you to address your comments and to submit an erosion and sediment control plan to the Engineering Department. 1 have reviewed the plan submitted for compliance with the Preliminary Approval letter and can offer the following comments: 1. The plan includes the stockpiling of soil on the opposite side of the access road to the fire station. COUNTY OF ALBEMARLE Department of Planning & Community Development 401 McIntire Road, Room 213 Charlottesville, Virginia 22902-4596 (804) 296 - 5823 Fax (804) 972 - 4012 August 1, 2001 f Ron Lilley County of Albemarle 401 McIntire Road Charlottesville, VA 22902-4596 RE. SDP-2001-043 Monticello Fire & Rescue Station Preliminary Site Plan Tax Map 91, Parcel 2E Dear Mr Lilley- The Albemarle County Planning Commission, at its meeting on July 24, 2001, unanimously approved the preliminary site plan and the one way circulation waiver, with conditions. 1 The following note shall be shown on the final site plan: When the property to the east is developed. the sidewalk along the public driveway shall be extended to that property, and an additional sidewalk. connecting the future building to the fire and rescue station shall be provided; 2. The landscape plan, to be submitted with the final site plan, shall include street trees or their equivalent along the front of the station building; 3. A sign shall be installed at the southern -most entrance, which indicates that this drive is for emergency vehicles only; 4 A note shall be added to the final site plan, which includes the square footage of the area of assembly Also, the parking information shall be revised to show a parking requirement of 1 space per 2 staff persons plus 1 space per 75 square feet of area for assembly 5. The following items must be reviewed and approved by the Engineering Department before tentative approval of the final site plan can be granted: a An erosion and sediment control plan, narrative and computations; b Road plans and computations; and C. VDOT approval of road plans and entrance design. 6 The following items must be reviewed and approved by the Service Authority before tentative approval of the final site plan can be granted: a. Approval of final water and sewer construction drawings, which shall be submitted directly to the Service Authority Page 2 August 1, 2001 b Show proposed water and sewer easements. c. The street trees proposed for the west side of the access road will be in direct conflict with the new 18" water main. Also trees around the east side of the site conflict with the new 6" water main, sprinkler line and water meter. The final utility and landscape plans must reconcile these conflicts. If you have any questions, please do not hesitate to contact me. Sincerely, Margaret Doherty Principal Planner M D/jcf Cc. Amelia McCulley Jack Kelsey THE COX COMPANY Planners • Landscape Architects Civil Engineers • Urban Designers TO: Ms. Margare oherty Re: Monticello F&R Final Site Plan Company: Albemarle County Transmittal I Date August 13, 2001 FROM: Eric Woolley job #: 00-60 Subject: Site Plan Submittal I Transmitted Via: ❑ FedEx ❑ USPS ❑ UPS ® Hand ❑ Other Transmitted Items: • (16) Full Size Sets of the Final Site Plan • Final Site Plan Application Margaret, I have attached the Final Site Plan package to this transmittal. Please let me know if you will require any additional information. Thank you for all your help. Eric CC: With Attachments: Ron Lilley, Project Manager, Albemarle County Bill Adams, Architect, Train & Partners File 804.295.7131 220 East High Street Charlottesville, Virginia 22902