Mr. Eric Woolley
The Cox Company
220 East High Street
Charlottesville, Virginia 22902
Re: Monticello Fire & Rescue
Dear Mr. Woolley:
December 6, 2001
The plans, entitled "Monticello Fire & Rescue" dated August 10, 2001, last revised November 20,
2001, are hereby approved for construction. One set of approved plans is enclosed for yourrecords. Any
previously approved plans are voided with this approval. This approval is for basic compliance with the
General Water & Sewer Construction Specifications of the Albemarle County Service Authority and does not
relieve the -contractor from responsibility for his work as it relates to the plans and'specifications.
The Albemarle County Service Authority requires that a copy of the approved construction plans be
on the job site. It is .the contractor's responsibility to mark up a copy of the approved construction plans
showing as -built information and provide this data to your client at the completion of utility installation. Final
as -built plans shall be submitted in a digital format.
A preconstruction conference shall be scheduled with the project manager to ensure coordination
and answer any questions. This will be a short meeting to review the project, materials, test methods and
schedule, in order to expedite construction. Please have the proper party call me at 977-4511 to schedule the
meeting. ,?
This approval is valid for a period of eighteen (18) months from this date. If construction is not in
progress at the end of this time period, the approval shall be void.
(ThP pre -,-.;tire for wn,ter may PxrPPd 80 nsi at some meter locations). If you have any questions or if
we can be of assistance, please advise us.
CAS:dmg
cc: Co. of Albemarle
State Health Dept.
L,,P anning Dept.
Bldg. Codes & Zoning Services
Soil Erosion Inspector
Scott Moms, ACSA Inspector
168 Spotnap Road • P.O. Box 2738 •
Sincerely,
,,Christopp . ephan, P.E.
Civil Engineer
Charlottesville, VA 22902 • Tel (434) 977-4511 • Fax (434) 979-0698
1�p
www.acsanet.com
FAX (434) 972-4126
�N of AL6��r
I
`rRG1
COUNTY OF ALBEMARLE 10 _' 0- 0 ti 0 U: 3 0 1 N
Department of Building Code and Zoning Services
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
TELEPHONE (434) 296-5832
MEMORANDUM
TO: Margaret Doherty, Planner
FROM: Susan Carol Snead, Zoning Plans Reviewer
DATE: October 8, 2001
RE: SPD 01-089 Monticello Fire/Rescue Station Final Site Plan
Revised October 1, 2001
TTD (434) 972-4012
Final tentative approval from the Department of Building Code and Zoning
Services will be subject to the following conditions: (The following
conditions are those that have been identified at this time. Additional
conditions may be added or eliminated based on further review.)
[4.17.4] A note most appear on the Final Mylar stating that the inground
luminaires will emit less than 3000 initial lumens.
Please contact me if you have questions or require additional information.
Margaret Doherty
From: Margaret Doherty
Sent: Friday, September 28, 2001 4:34 PM
To: Ron Lilley; 'Eric Woolley'
Subject: Monticello Fire & Rescue
The Department of Planning and Community Development hereby grants tentative approval of the final site
plan. When all other reviewing agencies have granted tentative approval, please submit two mylar copies and
one paper copy of the final site plan for signature. I will sign the mylars when all other reviewing agencies
have signed.
Let me know if you need any help with other agencies.
Ma rg-cwet-ocherty
Principle Planner
Albemarle County
Department of Planning and Community Development
401 McIntire Road
Charlottesville, VA 22902
PH (804) 296-5823 x3250
FX (804) 972-4012
THE COX COMPANY
Planners • Landscape Architects
Civil Engineers • Urban Designers
TO: Ms. Margaret Doherty
Re: Monticello F&R Final Site Plan
Company: County of Albemarle
Transmittal
I Date September 28, 2001
FROM: Eric Woolley
job #: 00-60
Subject: Final Site Plan
I Transmitted Via:
❑ FedEx ❑ USPS ❑ UPS ® Hand ❑ Other
Transmitted Items: (1) Full Size Copy of revised Final Site
Plan, cover dated: October 1, 2001
Margaret,
In response to the SPIN comments you presented to me dated 8/28/01, I
offer the following:
1. The special use permit number has been added to the general
notes on sheet 1.00 of the plan.
2. The note you requested has been added to the site plan (sheet
3.00).
3. All other reviewing agencies are being coordinated with separately.
I have attached a copy of the site plan for your file and review. Please
feel free to call with any additional concerns. Thank you,
Eric
CC: File
With Attachments:
RECEIVED
SEP c 8 20m
804.295.7131
220 East High Street
Charlottesville, Virginia 22902
Planning Dept.
O
r
- �'IRGII3IP
COUNTY OF ALBEMARLE
Department of Building Code and Zoning Services
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
FAX (804) 972-4126 TELEPHONE (804) 296-5832 TTD (804) 972-4012
September 11, 2001
Ron Lilley
Albemarle County Engineering Department
401 McIntire Road
Charlottesville, VA 22902
RE: SDP SDP2001 — 089 Monticello Fire & Rescue Station #11Final Site Plan
Dear, Mr. Lilley
Your tentative plan submission has been distributed to the reviewing agencies and the attached comments have been
received. Please review the comments and revise the plan of the proposed development accordingly. Your revisions
should be resubmitted directly to the commenting agency. If not previously submitted the landscaping and lighting
plans should be submitted to both the Planning Department and the Building Code and Zoning Service Department. If
not previously submitted your Erosion Control Plan should be submitted directly to the Engineering Department. I have
not received comments from the Albemarle County Service Authority. I will forward those comments when I receive
them.
After all approvals have been received the final site plan may be submitted for signing. For final site plan submittal you
will need to submit two mylar copies of the site plan (the original and a copy for County records) along with a $325 fee
and completed application to the Planning Department. Submittals are received each Monday and the plan will be
signed within one week of submittal.
If you have any questions about the comments of a specific agency please contact that agency directly. If you have any
questions about the review process please feel free to contact me.
Sincerely,
William D. Fritz, AICP
Development Process Manager
Albemarle County Development Departments SDP-2001-089
SPIN Submission and Comments Monticello Fire & Rescue Station
#11 Final
Engineering [description and date] revision 1
reviewer received reviewed decision
Glenn Brooks 8/17/01 9/10/01 requested changes
Project: Monticello Fire & Rescue Station
Plan preparer:The Cox Company (fax 295-7540)
Owner or rep.:Ron Lilley
Plan received date:20 Aug 2001 (site plan)
Date of comments:5 Sep 2001
Lead Engineer:Glenn Brooks, Senior Engineer
A. Final site plan and drainage computation comments: (Glenn)
1. Drainage computations have not been received.
-2. Materials specification or details were not found for the parking areas or asphalt sidewalk.
3. VDOT approval is required. Comments are attached.
4. Please provide a more gradual transition of travelway width from the entrance apron.
5. A ditch is needed next to the travelway at the toe of the slope. A good illustration of this is provided
under E&S slope protection p.111-367.
B. Road plan and drainage computation comments: (Glenn)
6. At this time the roads are being considered private travelways to serve the fire station property. The
initial section of travelway grades appears adequate to serve any future road which may be placed along
the same alignment. Similarly, the travelway to serve the parking lots next to the building is not being
reviewed as a roadway at this time. When used to access the property in the rear, it may continue to be
considered a travelway for inter -parcel access, rather than a private road. It is noted however that VDOT
standards for non-residential roads allow a 24' width with parking restricted, or a 30' width with parking
allowed. VDOT standards do not allow perpendicular parking spaces along roadways.
C. Stormwater management plan comments:
7. Stormwater management is addressed with the facilities built on the Monticello High School property.
D. Erosion and sediment control plan comments: (Max Greene, Erosion Control plan reviewer)
#2164 Monticello Fire & Rescue Station
Max GreeneSeptember 5, 2001
Suggested E&S review comments.
Narrative:
8. Calculations - Detailed calculations for the design of temporary sediment basins, permanent
stormwater detention basins, diversions, channels, etc. Include calculations for pre- and post -
development runoff.
Plan Sheet:
9. Show haul roads to stockpile area.
10. Move temporary paved construction entrance to the west enough to grade the proposed roadbed
without effecting the egress / ingress to the site until the road bed can be utilized for the new paved
construction entrance.
11. The sediment trap "C" should be moved downslope to allow for the safe use of the temporary paved
9/11/01 10:28 AM
Page 1 of 5
Albemarle County Development Departments SDP-2001-089
SPIN Submission and Comments Monticello Fire & Rescue Station
#11 Final
Engineering [description and date] revision 1
reviewer received reviewed decision
Glenn Brooks 48/17/01 9/10/01 requested changes
construction entrance.
12. Move sediment trap "B" downslope to accommodate new stockpile area on the eastern portion of the
site.
13. Show how site is to be protected from start to finish..... the existing drainage direction is proposed to
change 180 degrees and nothing is shown to stop the storm flows into Mill Creek Drive.
14. Show details and calculations for B/M Swale along the proposed temporary road. Show the swale
grading on the plan sheet.
15. Plan must meet or exceed the requirements of MS-8.
16. Silt fence does not work as shown on plan sheet. Silt fence must all be installed at the same ground
elevation or a modified sediment trap must be included at the bottom of the swale or low point to capture
concentrated runoff. Silt fence is not adequate for lengths of stormflow over 100', you maybe able to
incorporate a weir located in the lowest spot along the silt fence to allow for a high flow filter system that
may suffice. However, if the inspector finds that the controls are not working then he will ask for a
proper trap to be installed in the locations that silt fence has proven to be insufficient. This sediment trap
may be constructed as a field modification provided the County's Erosion Control Inspector approves it.
17. All storm drain structures shall empty into a sediment control structures until the site is considered
stabilized by the Engineering Department.
18. These comments may not be all inclusive due to required changes.
19. E&S portion of the Water Protection Bond could not be determined at this time.
Engineering Department approval of the construction plans will be given when "all comments have been
addressed" for items A-D above. A grading permit will be issued when approvals have been granted
from all applicable departments and agencies, and erosion control bond has been posted, and a pre -
construction conference held with the contractor, owner and county staff.
Attachment: (none)
Copy:file 2164
File: Monticello Fire Station fsp ecp 2164 (1).doc
9/11/01 10:28 AM
Page 2 of 5
e
Albemarle County Development Departments SDP-2001-089
SPIN Submission and Comments Monticello Fire & Rescue Station
#11 Final
Planning Final Site Plan revision 1
reviewer received reviewed decision
Margaret Doherty 8/17/01 8/28/01 requested changes
The Department of Planning and Community Development will not approve the final plan until the
following items have been satisfactorily addressed:
1. Please put the Special Use Permit approval number "SP-00-39" with the zoning information;
2. Please add the following notes to the Site Plan: "When the property to the east is developed, the
sidewalk along. the public driveway shall be extended to that property, and an additional sidewalk,
connecting the future building to the fire and rescue station shall be provided"; and
3. All other reviewing agency approvals.
9/11/01 10:28 AM Page 3 of 5
e
Albemarle County Development Departments SDP-2001-089
SPIN Submission and Comments Monticello Fire & Rescue Station
#11 Final
Service Authority [description and date] revision 1
reviewer received reviewed decision
unassigned 8/17/01
9/11/01 10:28 AM Page 4 of 5
it
Albemarle County Development Departments SDP-2001-089
SPIN Submission and Comments Monticello Fire & Rescue Station
#11 Final
Zoning [description and date] revision 1
reviewer received reviewed decision
susan snead 8/17/01 9/6/01 requested changes
FROM: Susan Carol Snead, Zoning Plans Reviewer
DATE: September 6, 2001
RE: SPD 01-089 Monticello Fire/Rescue Station Final Site Plan
Final tentative approval from the Department of Building Code and Zoning Services will be subject to the
following conditions: (The following conditions are those that have been identified at this time. Additional
conditions may be added or eliminated based on further review.)
1. [4.17.4] The proposed ingrade luminaire (Hydrel 9100 Series) does not comply with the Ordinance
and cannot be approved.
2. [4.12.6.6] The required number of parking spaces is 16. Please revise the note on the plan.
9/11/01 10:28 AM Page 5 of 5
i
MEMORANDUM
From: Bill Fritz
To: �Margaret-Dofterty
Glenn Brooks
Pete Gorham
Susan Snead
Date: August 17, 2001
BE: SUP2001- 089 Monticello Fire a Rescue Station #11 Final Site Plan [Tentative Application Submittall
The attached plan and preliminary approval letter are being distributed to you for tentative approval.
Please review these plans and enter your comments into SPIN by September 7, 2001.1 will distribute the
comments to the applicant and advise the applicant to work with each of you to address your comments and
to submit an erosion and sediment control plan to the Engineering Department. 1 have reviewed the plan
submitted for compliance with the Preliminary Approval letter and can offer the following comments:
1. The plan includes the stockpiling of soil on the opposite side of the access road to the fire station.
COUNTY OF ALBEMARLE
Department of Planning & Community Development
401 McIntire Road, Room 213
Charlottesville, Virginia 22902-4596
(804) 296 - 5823
Fax (804) 972 - 4012
August 1, 2001
f
Ron Lilley
County of Albemarle
401 McIntire Road
Charlottesville, VA 22902-4596
RE. SDP-2001-043 Monticello Fire & Rescue Station Preliminary Site Plan
Tax Map 91, Parcel 2E
Dear Mr Lilley-
The Albemarle County Planning Commission, at its meeting on July 24, 2001, unanimously approved the
preliminary site plan and the one way circulation waiver, with conditions.
1 The following note shall be shown on the final site plan: When the property to the east is developed.
the sidewalk along the public driveway shall be extended to that property, and an additional sidewalk.
connecting the future building to the fire and rescue station shall be provided;
2. The landscape plan, to be submitted with the final site plan, shall include street trees or their
equivalent along the front of the station building;
3. A sign shall be installed at the southern -most entrance, which indicates that this drive is for
emergency vehicles only;
4 A note shall be added to the final site plan, which includes the square footage of the area of
assembly Also, the parking information shall be revised to show a parking requirement of 1 space
per 2 staff persons plus 1 space per 75 square feet of area for assembly
5. The following items must be reviewed and approved by the Engineering Department before tentative
approval of the final site plan can be granted:
a An erosion and sediment control plan, narrative and computations;
b Road plans and computations; and
C. VDOT approval of road plans and entrance design.
6 The following items must be reviewed and approved by the Service Authority before tentative
approval of the final site plan can be granted:
a. Approval of final water and sewer construction drawings, which shall be submitted directly to the
Service Authority
Page 2
August 1, 2001
b Show proposed water and sewer easements.
c. The street trees proposed for the west side of the access road will be in direct conflict with the new
18" water main. Also trees around the east side of the site conflict with the new 6" water main,
sprinkler line and water meter. The final utility and landscape plans must reconcile these conflicts.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Margaret Doherty
Principal Planner
M D/jcf
Cc. Amelia McCulley
Jack Kelsey
THE COX COMPANY
Planners • Landscape Architects
Civil Engineers • Urban Designers
TO: Ms. Margare oherty
Re: Monticello F&R Final Site Plan
Company: Albemarle County
Transmittal
I Date August 13, 2001
FROM: Eric Woolley
job #: 00-60
Subject: Site Plan Submittal
I Transmitted Via: ❑ FedEx ❑ USPS ❑ UPS ® Hand ❑ Other
Transmitted Items: • (16) Full Size Sets of the Final Site Plan
• Final Site Plan Application
Margaret,
I have attached the Final Site Plan package to this transmittal.
Please let me know if you will require any additional information. Thank
you for all your help.
Eric