HomeMy WebLinkAboutWPO200900030 Review Comments Stormwater Management Plan 2010-02-12Philip Custer From: Philip Custer Sent: Friday, February 12, 2010 1:39 PM To: 'JTAGG2 @aol.com' Cc: Ana Kilmer; Summer Frederick; John Paul Diez Subject: Approval of ESC and SWM Plans for Charlottesville First Church of the Nazarene (W PO- 2009 - 00030) Good afternoon, Engineering has completed their review of the latest submittal of the ESC and SWM plans for Charlottesville First Church of the Nazarene (WPO- 2009 - 00030), submitted 11 February 2010. The plans have met all County minimum standards and are hereby conditionally approved. Final approval of the plans will be given once the Stormwater Facility Maintenance Agreement (instruction are found here) has been recorded. Please submit three more copies of the plans so they can be distributed to the County inspectors. In the plans, please correct the proposed weir length of trap 2 (and remove the "Weir Length =17ft" note of Trap 1) and clarify the depth of the stone in the Basin Biofilter detail (the note is illegible because of the pattern). I will make these corrections on the plans currently at the county. The E &SC bond amount is $51,100. The SWM bond amount is $38,600. The forms and instructions to post the Water Protection Ordinance Bond can be found on the Community Development Department Web site on www.albemarle.org. You may contact Ana Kilmer (Albemarle County Department of Community Development) at (434)296 -5832 ext. 3246 for further information on bonding procedures or Maintenance Agreements. Once the Stormwater Maintenance Agreement is recorded, Engineering can recommend approval of the site plan to the Project Planner. Please contact me if you have any questions. Thanks, Phil (434)296 -5832 x3072 OF AL O ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: C'Ville First Church of the Nazarene [SDP200900050, WP0200900030] Plan preparer: Jimmy L. Taggart [JTagg2 @aol.com] Owner /Applicant: Albemarle Edgehill FarmLLC Plan received date: 23 June 2009 Rev 1: 7 October 2009 Rev 2: 11 December 2009 Rev 3: 1 February 2010 Date of comments: 17 July 2009 Rev 1: 22 October 2009 Rev 2: 22 January 2010 Rev 3: 4 February 2010 Reviewer: John P. Diez — Engineering Technician Rev 3: Phil Custer A. Final Site Plan 2. Please provide a completed copy of the standard stormwater maintenance agreement and fee for recordation for any stormwater management facilities. [ 17 -304E] (Rev.]) Comment has not been addressed. (Rev.2) Comment has not been addressed. (Rev.3) Comment has not been addressed. 4. VDOT approval must be obtained prior to final site plan approval. (Rev.]) Comment has been noted. (Rev. 3) Comment has been addressed. B. Stormwater Management Plan 23. Please address MS -19 at the proposed outfall of the proposed pond and at the outfall of structure 'IQ" (Rev.2) Please see the memo accompanying this comment letter. (Rev.3) Please see the memo accompanying this comment letter. 24. There appears to be no stormwater management facilities to treat the runoff to DA -Q. Please illustrate how this area will be treated. (Rev.]) Comment has not been addressed. Stormceptor facilities are awarded up to 20% removal rate in the Virginia Stormwater Management Handbook (Section 3.15). However, the pollutant removal rate that must be achieved for this project (based on the County's Simple Method Spreadsheet) is 83 %. (Rev.2) A biofilter has been provided in this area. However, please make the following adjustments to the biofilter draining to Point Q: -the biofilter is shown in plan view as having a bed area of around 800sf but the calculations refer to a bed area of 392sf; please clarify; if a bed of 800sf is provided 8 plantings will be needed Albemarle County Community Development Engineering Review Comments Page 2 of 2 -the maximum ponding depth of the biofilter is Ift; please drop the rim elevation of the inlet by 0.5ft (Rev.3) Comment has been addressed. C. Erosion and Sediment Control Plan 31. There seem to be discrepancies between the sediment basin calculations on the plans and the sediment basin sizing computations. (RevJ) Comment has not been addressed. The pond bottom elevation of the plan detail does not match with the engineering calc. packet. (Rev.2) Comment has not been addressed. Revised calculations for the sediment basin on the southwest corner of the site have not been submitted. (Rev.3) Calculations have been provided and are satisfactory. 37. It seems that your layer for limits of disturbance has been turned off. Please revise. (Rev.3) Comment has been addressed. CDE4 _fsp,swm,escJPD_Rev4PBC_C'Ville First Church of the Nazarene.doc *-&A County of Albemarle Department of Community Development Memorandum To: John Diez, Current Development Engineer From: Phil Custer, Current Development Engineer Date: 22 January 2010 Subject: First Church of the Nazarene (WPO- 2009 - 00030) I have reviewed the project for MS -19 compliance. First of all, due to the reconfiguration of the site watersheds, it seems that the peak discharge, peak velocity, and total volume of runoff to Point Q are all reduced. Therefore, an adequate channel analysis for this discharge point is not required. On the other hand, the portion of the site draining to VDOT Culvert 3 -3 is nearly quadrupled. Because of this, more scrutiny should be applied to this downstream system. Upon first glance of the VDOT design drawing and calculations, the pipes downstream appear to be sized adequately for the discharges released from this site. The applicant compares the results of his 10 -year routing showing a peak release rate of 0.238cfs to the design hydrologic data of the culvert which shows a peak discharge of 9.98cfs. However, this comparison is misleading because there has been no analysis provided for the post - development drainage area to this culvert from the Edge Hill Farm property and the routing results from the facility are incorrect because the critical storm was not considered. In addition, the outlet of the drainage system on the south side of Route 250 appears to be eroding currently, which is indicative of an inadequate channel, though no computations have been provided by the applicant in this regard. Rather than providing more calculations for this project which would prolong the review time, I recommend that the applicant make the following changes to the plan to satisfy all County requirements: 1. Convert Facility 1 into a biofilter that has a bed area equal to 4% of the impervious area draining to it. It appears that the bottom bed elevation of 390 will provide a sufficient bed area for the facility, though this should be demonstrated in a short calculation. The modified simple spreadsheet which was first provided by the applicant in the 19 June 2009 submittal showed a required removal rate of 80% and the current proposed SWM facility falls well short of that mark (extended detention is granted only a 35% removal rate by VSMH). This biofilter facility should be designed to all requirements outlined in the Design Manual Checklist. 2. Please provide a note on the plan at the outlet of the larger biofilter that a Ift deep non - eroding channel is to be provided from the basin outlet to VDOT Culvert 3 -3 as determined by the County Erosion and Sediment Control Inspector. (The condition of this roadside ditch may not be as originally designed.) 3. To meet detention requirements while considering the critical storm, please provide a 5in. orifice at the elevation of 391. The top of the riser should also be raised so that it is at an elevation of 393.60. All other facility design dimensions appear to be satisfactory (barrel diameter, basin geometry, riser diameter, etc.). 4. Please specify a trash rack on the lower orifice that meets the minimum requirements of Chapter 3.02 of the VSMH. 5. Update ESC sediment basin calculations accordingly. Engineering will grant a waiver for having less than lft of freeboard from the riser top to the emergency spillway. File: 1- 22- 10_PBC to JPD memo_wpo200900030.doc OF AL O ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer: Owner /Applicant: Plan received date: Rev 1: Rev 2: Date of comments: Rev 1: Rev 2: Reviewer: A. Final Site Plan C'Ville First Church of the Nazarene [SDP200900050, WP0200900030] Jimmy L. Taggart [JTagg2 @ aol.com] Albemarle Edgehill FarmLLC 23 June 2009 7 October 2009 11 December 2009 17 July 2009 22 October 2009 22 January 2010 John P. Diez — Engineering Technician 1. Please revise the Tax Map and Parcel number on the plans. It appears that our county records show the work being done in on TMP 79 -8A. (Rev. 1) Comment has been addressed. 2. Please provide a completed copy of the standard stormwater maintenance agreement and fee for recordation for any stormwater management facilities. [17 -304E] (Rev.]) Comment has not been addressed. (Rev.2) Comment has not been addressed. 3. Please provide date of the topographic information. (Rev.]) Comment has been addressed. 4. VDOT approval must be obtained prior to final site plan approval. (Rev.]) Comment has been noted. 5. All entrances must have VDOT designations (PE -1, CG -9a, etc.) (Rev.]) Comment has been addressed. 6. It appears that the entrance exceeds the 4% grade maximum for the distance of 40' from the intersected street. Please revise. [18- 4.12.17] (Rev.]) Comment has been addressed. 7. Please provide an entrance road profile. [18- 4.12.17b] (Rev.]) Comment has been addressed. 8. Please provide site distance lines at the entrance. (Rev.]) Comment has been addressed. 9. Some of the texts on the plans are illegible. Please clarify. (Rev.]) Comment has been addressed. 10. Some parking areas exceed the 5% maximum grade. Please revise. [18- 4.12.15c] (Rev.]) Comment has not been addressed. (Rev.2) Comment has been addressed. 11. Sidewalks abutting parking must be 6' wide (exclusive of curb), or bumper blocks are provided. [ 18- 4.12.16e] (Rev.]) Comment has been addressed. Albemarle County Community Development Engineering Review Comments Page 2 of 3 12. The dumpster pad specifications must be a minimum 4" stone base and 6" concrete of 3000 psi at 28 days, or stronger, reinforced with a minimum grid of wire reinforcing or #4 bars @ 12" o.c. (Rev.]) Comment has been addressed. 13. Please provide existing ground, VDOT designations, throat length for each drop inlet, grate type for each grate inlet, and utility crossings on all drainage profiles. (Rev.]) Comment has been addressed. 14. Pipe slopes must be 0.5% min. to 16% max. (Rev.]) Comment has been addressed. 15. All labels on drainage profiles must match with storm inlet summary, (Rev.]) Comment has been addressed. 16. Please provide end sections (ES -1) or endwalls (EW -1)on all pipe outlets. (Rev.]) Comment has been addressed. 17. All inlet spreads must be less than 10'. (Rev.]) Comment has been addressed. 18. Please submit culvert calculations. (Rev.]) Comment has been addressed. 19. All directions of flow change (or deflection angles) in each drainage structure must be 90 degrees or greater. (Rev.]) Comment has not been addressed. (Rev.2) Comment has been addressed. 20. Please submit inlet drainage area maps with drainage acreage, limits of all areas and sub -areas draining to proposed structures (and existing structures or channels which will be impacted, hydrologic coefficients, and time of concentration for each drainage area. (Rev.]) Comment has been addressed. 21. The current design for the storm sewer requires a critical slopes waiver. (Rev.2) Design has been changed. Please disregard comment. B. Stormwater Management Plan 22. Please label pre - development and post - development drainage area maps with acreage, coefficients, and time of concentration. (Rev.]) Comment has been addressed. 23. Please address MS -19 at the proposed outfall of the proposed pond and at the outfall of structure «Q„ (Rev.2) Please see the memo accompanying this comment letter. 24. There appears to be no stormwater management facilities to treat the runoff to DA -Q. Please illustrate how this area will be treated. (Rev.]) Comment has not been addressed. Stormceptor facilities are awarded up to 20% removal rate in the Virginia Stormwater Management Handbook (Section 3.15). However, the pollutant removal rate that must be achieved for this project (based on the County's Simple Method Spreadsheet) is 83 %. (Rev.2) A biofilter has been provided in this area. However, please make the following adjustments to the biofilter draining to Point Q: -the biofilter is shown in plan view as having a bed area of around 800sf but the calculations refer to a bed area of 392sf; please clarify; if a bed of 800sf is provided 8 plantings will be needed -the maximum ponding depth of the biofilter is Ift; please drop the rim elevation of the inlet by 0.5ft Albemarle County Community Development Engineering Review Comments Page 3 of 3 25. Please provide Albemarle County general stormwater notes. Please refer to the Design Standards Manual. (RevJ) Comment has been addressed. 26. This parcel is not is a development area, but in rural land. Please revise removal rate requirements. (RevJ) Comment has been addressed. 27. Please provide a vehicle access road to the proposed pond. The access must be graded to 10' width and less than 20% grade. (RevJ) Comment has been addressed. C. Erosion and Sediment Control Plan 28. Please provide a construction sequence. (RevJ) Comment has been addressed. 29. Prior to the installation of the curb and gutter and inlets, much of the site does not drain to the proposed sediment basin. It seems that a diversion dike may be necessary at the top of the proposed lot embankment. (RevJ) Comment has been addressed. 30. Please provide dust control symbols (DC). (RevJ) Comment has been addressed. 31. There seem to be discrepancies between the sediment basin calculations on the plans and the sediment basin sizing computations. (RevJ) Comment has not been addressed. The pond bottom elevation of the plan detail does not match with the engineering calc. packet. (Rev.2) Comment has not been addressed. Revised calculations for the sediment basin on the southwest corner of the site have not been submitted. 32. The construction entrance must drain to a sediment trap. (RevJ) Comment has not been addressed. The construction entrance should be moved up the travelway so that a sediment trap can be installed outside of the VDOT right -of -way. (Rev.2) Comment has been addressed. 33. Please provide a staging and /or parking area. (RevJ) Comment has been addressed. 34. Please provide outlet protection to all proposed outlets. (RevJ) Comment has been addressed. 35. Use storm drain inlet protection (IP) on inlets only. (RevJ) Comment has been addressed. 36. Use culvert inlet protection (CIP) on culvert inlets only. (RevJ) Comment has been addressed. 37. It seems that your layer for limits of disturbance has been turned off. Please revise. C: \pcuster_DOCS\My Reviews \WPO's\ Nazarene \CDE3_fsp,swm,escJPD_C'Ville First Church of the Nazarene.doc � OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: C' Ville First Church of the Nazarene [SDP200900050, WP0200900030] Plan preparer: Jimmy L. Taggart [JTagg2 @aol.com] Owner or rep.: Albemarle Edgehill Farm LLC Plan received date: 23 June 2009 Rev. 1: 7 October 2009 Date of comments: 17 July 2009 Rev. 1: 22 October 2009 Reviewer: John P. Diez — Current Development - Engineering Technician A. Final site plan (SDP200900050) 1. Please revise the Tax Map and Parcel number on the plans. It appears that our county records show the work being done is on TMP 79 -8A. (Rev. 1) Comment has been addressed. 2. Please provide a completed copy of the standards stormwater maintenance agreement and fee for recordation for any stormwater management facilities [17 -304E] (Rev. 1) Comment has been noted. 3. Please provide date of the topographic information. (Rev. 1) Comment has been addressed. 4. VDOT approval must be obtained prior to final site plan approval. (Rev. 1) Comment has been noted. 5. All entrances must have VDOT designations (PE -1, CG -9a, etc.) (Rev. 1) Comment has been addressed. 6. It appears that the entrance exceeds the 4% grade minimum for the distance of 40' from the intersected street. Please revise. [18- 4.12.17] (Rev. 1) Comment has been addressed. 7. Please provide an entrance road profile. [18- 4.12.17b] (Rev. 1) Comment has been addressed. 8. Please provide site distance lines at the entrance. (Rev. 1) Comment has been addressed. 9. Some of the texts on the plans are illegible. Please clarify. (Rev. 1) Comment has been addressed. 10. Some parking areas exceed the 5% maximum grade. Please revise. [18- 4.12.15c] (Rev. 1) Comment has not been addressed. 11. Sidewalks abutting parking must be 6' wide (exclusive of curb), or bumper blocks are provided. [ 18- 4.12.16e] (Rev. 1) Comment has been addressed. 12. The dumpster pad specifications must be a minimum 4" stone base and 6" concrete of 3000 psi at 28 days, or stronger, reinforced with a minimum grid of wire reinforcing or #4 bars @ 12" on center. (Rev. 1) Comment has been addressed. 13. Please provide existing ground, VDOT designations, throat length for each drop inlet, grate type for each grate inlet, and utility crossings on all drainage profiles. (Rev. 1) Comment has been addressed. Engineering Review Comments Page 2 of 3 14. Pipe slopes must be 0.5% min. to 16% max. (Rev. 1) Comment has been addressed. 15. All labels on drainage profiles must match with storm inlet summary. (Rev. 1) Comment has been addressed. 16. Please provide end sections (ES -1) or endwalls (EW -1) on all pipe outlets. (Rev. 1) Comment has been addressed. 17. All inlet spreads must be less than 10'. (Rev. 1) Comment has been addressed. 18. Please submit culvert calculations. (Rev. I) Comment has been addressed. 19. All directions of flow change (or deflection angles) in each drainage structure must be 90 degrees or greater. (Rev. 1) Comment has not been addressed. Pipes LED still have an angle of less than 90 degrees. 20. Please submit inlet drainage area maps with drainage acreage, limits of all areas and sub -areas draining to proposed structures (and existing structures or channels which will be impacted, hydrologic coefficients, and time of concentration for each drainage area. (Rev. 1) Comment has been addressed. 21. The current design for the storm sewer system requires a critical slopes waiver. B. Stormwater Management Plan (WPO200900030) 22. Please label pre - development and post - development drainage area maps with acreage, coefficients, and time of concentration. (Rev. 1) Comment has been addressed. 23. Please address MS -19 at the proposed outfall of the proposed pond and at the outfall of structure 'IQ" (Rev. 1) Comment has not been addressed. Please provide information as to where the water flows to from point "Q' 24. There appears to be no stormwater management facilities to treat the runoff to DA -Q. Please illustrate how this area will be treated. (Rev. 1) Comment has not been addressed. Stormceptor facilities are awarded up to 20% removal rate in the Virginia Stormwater Management Handbook (Section 3.15). However, the pollutant removal rate that must be achieved for this project (based on the County's Simple Method Spreadsheet) is 83%. 25. Please provide Albemarle County general stormwater notes. Please refer to the Design Standards Manual. (Rev. 1) Comment has been addressed. 26. This parcel is not in a development area, but in other rural land. Please, revise removal rate requirements. (Rev. 1) Comment has been addressed. 27. Please provide a vehicle access road to the proposed pond. The access must be graded to 10' width and less than 20% grade. 'Rev. 1) Comment has been addressed. C. Erosion Control Plan (WPO200900030) 28. Please provide a construction sequence. (Rev. 1) Comment has been addressed. Engineering Review Comments Page 3 of 3 29. Prior to the installation of the curb and gutter and inlets, much of the site does not drain to the proposed sediment basin. It seems that a diversion dike may be necessary at the top of the proposed lot embankment. (Rev. 1) Comment has been addressed. 30. Please provide dust control symbols (DC). (Rev. 1) Comment has been addressed. 31. There seem to be discrepancies between the sediment basin calculations on the plans and the sediment basin sizing computations. (Rev. 1) Comment has not been addressed. The pond bottom elevation of the plan detail does not match with the engineering calc. packet. 32. The construction entrance must drain to a sediment trap. (Rev. 1) Comment has not been addressed. The construction entrance should be moved up the travelway so that a sediment trap can be installed outside of the VDOT right -of -way. 33. Please provide a staging and /or parking area. (Rev. 1) Comment has been addressed. 34. Please provide outlet protection to all proposed outlets. (Rev. 1) Comment has been addressed. 35. Use storm drain inlet protection (OP) on inlets only. (Rev. 1) Comment has been addressed. 36. Use culvert inlet protection (CIP) on culvert inlets only. (Rev. 1) Comment has been addressed. Once these comments have been addressed, please submit two (2) copies of the revised plans, calculations, and narratives to Current Development Engineering. Current Development Engineering is available from 2:30pm — 4:00pm on Thursdays to discuss these review comments. Please contact Amy Pflaum at 434 - 296 -5832 or apflaum @albemarle.org to schedule an appointment. If you have any questions, you can reach me, John Diez, at (434) 296 -5832 ext. 3025, or my email: jdiez@albemarle.org. \\ Cob- dts01 \cityviewlnk\Docs \2009 \SDP \SDP200900050 C'Ville First Church of the Nazarene \CDE2- fsp,swm,esc_JPD_C'Ville First Church of the Nazarene.doc � OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: C' Ville First Church of the Nazarene [SDP200900050, WP0200900030] Plan preparer: Jimmy L. Taggart [JTagg2 @aol.com] Owner or rep.: Albemarle Edgehill Farm LLC Plan received date: 23 June 2009 Date of comments: 17 July 2009 Reviewer: John P. Diez — Current Development - Engineering Technician A. Final site plan (SDP200900050) 1. Please revise the Tax Map and Parcel number on the plans. It appears that our county records show the work being done is on TMP 79 -8A. 2. Please provide a completed copy of the standards stormwater maintenance agreement and fee for recordation for any stormwater management facilities [17 -304E] 3. Please provide date of the topographic information. 4. VDOT approval must be obtained prior to final site plan approval. 5. All entrances must have VDOT designations (PE -1, CG -9a, etc.) 6. It appears that the entrance exceeds the 4% grade minimum for the distance of 40' from the intersected street. Please revise. [18- 4.12.17] 7. Please provide an entrance road profile. [18- 4.12.17b] 8. Please provide site distance lines at the entrance. 9. Some of the texts on the plans are illegible. Please clarify. 10. Some parking areas exceed the 5% maximum grade. Please revise. [18- 4.12.15c] 11. Sidewalks abutting parking must be 6' wide (exclusive of curb), or bumper blocks are provided. [ 18- 4.12.16e] 12. The dumpster pad specifications must be a minimum 4" stone base and 6" concrete of 3000 psi at 28 days, or stronger, reinforced with a minimum grid of wire reinforcing or #4 bars @ 12" on center. 13. Please provide existing ground, VDOT designations, throat length for each drop inlet, grate type for each grate inlet, and utility crossings on all drainage profiles. 14. Pipe slopes must be 0.5% min. to 16% max. 15. All labels on drainage profiles must match with storm inlet summary. 16. Please provide end sections (ES -1) or endwalls (EW -1) on all pipe outlets. 17. All inlet spreads must be less than 10' 18. Please submit culvert calculations. 19. All directions of flow change (or deflection angles) in each drainage structure must be 90 degrees or greater. 20. Please submit inlet drainage area maps with drainage acreage, limits of all areas and sub -areas draining to proposed structures (and existing structures or channels which will be impacted, hydrologic coefficients, and time of concentration for each drainage area. Engineering Review Comments Page 2 of 2 B. Stormwater Management Plan (WPO200900030) 21. Please label pre - development and post - development drainage area maps with acreage, coefficients, and time of concentration. 22. Please address MS -19 at the proposed outfall of the proposed pond and at the outfall of structure 41T 23. There appears to be no stormwater management facilities to treat the runoff to DA -Q. Please illustrate how this area will be treated. 24. Please provide Albemarle County general stormwater notes. Please refer to the Design Standards Manual. 25. This parcel is not in a development area, but in other rural land. Please, revise removal rate requirements. 26. Please provide a vehicle access road to the proposed pond. The access must be graded to 10' width and less than 20% grade. C. Erosion Control Plan (WPO200900030) 27. Please provide a construction sequence. 28. Prior to the installation of the curb and gutter and inlets, much of the site does not drain to the proposed sediment basin. It seems that a diversion dike may be necessary at the top of the proposed lot embankment. 29. Please provide dust control symbols (DC). 30. There seem to be discrepancies between the sediment basin calculations on the plans and the sediment basin sizing computations. 31. The construction entrance must drain to a sediment trap. 32. Please provide a staging and/or parking area. 33. Please provide outlet protection to all proposed outlets. 34. Use storm drain inlet protection (OP) on inlets only. 35. Use culvert inlet protection (CIP) on culvert inlets only. Once these comments have been addressed, please submit two (2) copies of the revised plans, calculations, and narratives to Current Development Engineering. Current Development Engineering is available from 2:30pm — 4:00pm on Thursdays to discuss these review comments. Please contact Amy Pflaum at 434 - 296 -5832 or apflaum @albemarle.org to schedule an appointment. If you have any questions, you can reach me, John Diez, at (434) 296 -5832 ext. 3025, or my email: jdiez@albemarle.org. \\ Cob- dts01 \cityviewlnk\Docs \2009 \SDP \SDP200900050 C'Ville First Church of the Nazarene \CDE1- fsp,swm,esc_JPD_C'Ville First Church of the Nazarene.doc PROJECT NAME: Charlottesville First Church of the Nazarene FILE #: WPO- 2009 -00030 DATE APPROVED: 12 February 2010 (Plans signed 11 February 2010) Item Unit Amount Unit Cost Subtotal Basin Biofilter trees & shrubs ball /burlap planted 38 $100.00 $3,800 underdrain stone cubic yard 215 $17.00 $3,655 biofilter surface area/ 27* 1' dept stone delivery load 22 $45.00 $990 underdrain pipe, 6" PVC linear foot 220 $1.35 $297 filter fabric square yard 115 $10.00 $1,150 biofilter surface area/ 27* 1' dept sand /soil mixture cubic yard 359 $20.00 $7,180 biofilter surface area/ 27* 2' dept EC -1 outlet protection each 2 $200.00 $400 class 1 rip -rap square yard 18 $55.00 $990 Riser structure each 1 $1,000.00 $1,000 EC -2 EC -3 ditch stabilization linear foot 120.00 $10.00 $1,200 maintenance road linear foot 200.00 $8.00 $1,600 Concrete pipe linear foot 60.00 $25.00 $1,500 subtotal $23,762 Trap Biofilter trees & shrubs ball/burlap planted 4 $100.00 $400 underdrain stone cubic yard 21 $17.00 $357 biofilter surface area/ 27* 1' dept stone delivery load 3 $45.00 $135 underdrain pipe, 6" PVC linear foot 42 $1.35 $57 filter fabric square yard 42 $10.00 $420 biofilter surface area/ 27* 1' dept sand /soil mixture cubic yard 35 $20.00 $700 biofilter surface area/ 27* 2' dept EC -1 outlet protection each 1 $200.00 $200 class 1 rip -rap square yard 17 $55.00 $935 48" concrete riser structure each 1 $1,000.00 $1,000 EC -2 EC -3 ditch stabilization linear foot 30.00 $10.00 $300 maintenance road linear foot 31.00 $8.00 $248 Concrete pipe linear foot 80.00 $25.00 $2,000 subtotal $6,752 subtotal $30,514 project management $4,5 77 subtotal $35,091 10% Contingency $3,509 TOTAL $38,600 ROUNDED TOTAL $38,600 min total after reduction $7,720