HomeMy WebLinkAboutWPO201000009 Review Comments Stormwater Management Plan 2010-02-24� OF AL
,. vIRGI1`IZP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Crozet Elementary School Dropoff Area Minor Amendment
SDP - 2010 -00012 and WPO- 2010 -00009
Plan preparer: Mr. John Hash, PE; Timmons Group
Owner: School Board of Albemarle County
Representative: Neale Craft; Office of Facilities Development, County of Albemarle
Plan received date: 08 February 2010
Date of comments: 24 February 2010
Reviewer: Phil Custer
A. Minor Site Plan Amendment Comments (SDP- 2010 - 00012)
1. The Chief of Current Development has granted a waiver of the travelway width to allow the
current proposed configuration.
2. Drainage computations for the new pipe and inlet are needed. The computations should include a
map with the watershed's area, tc, and C value specified.
3. Please provide a channel computation for the newly created and existing channel downstream of
the 15" pipe outlet. Will this channel need a lining?
B. Stormwater Management Plan Comments (WPO- 2010 - 00009)
1. The depth of the biofilter mix must be 2.5ft.
2. The biofilter landscape plan must contain at least three species of trees. The ratio of shrubs to
trees should be at least 2:1. [VSMH, DM]
3. Please make sure the weir elevation is specified on Sheet C4.0 on the next submittal.
4. A sediment forebay is needed within the facility. A forebay composing of 10% -20% of the bed
area created by a horseshoe ring of stone is acceptable. The stone ring would be comparable to the
filter weir on a sediment trap with stone of a smaller diameter on the inlet side.
5. No SWM bond will be necessary since this is a County project.
C. Erosion & Sediment Control Plan Comments (WPO- 2010 - 00009)
1. Engineering review has concerns with the concept of the ESC plan. As the fill operation proceeds,
the earthwork will encroach upon the sediment trap. At the same time, the fill will direct runoff
around the west side of the mulched play area which is not protected by sediment control
measures. If possible, the biofilter should be lowered and designed as a trap for phases I and II of
construction to filter runoff once final grades are reached.
Also, the proposed drainage plan is dramatically increasing the discharge in the depression west of
the mulch area. This flow path does not appear it would meet the state's definition of an adequate
channel. Despite the mild grades, engineering review is concerned that increased intensity and
frequency of storms will cause lasting erosion. Our concerns would be diminished if the existing
watersheds were maintained and the offsite flow was directed into the existing channel between
the school and the play area. If warranted, this concept would be coupled with a few upgrades to
the channel downstream of the discharge point. If the current bypass concept is maintained, the
applicant must either prove downstream adequacy or create a new channel to the stream.
Albemarle County Community Development
Engineering Review Comments
Page 2 of 2
I recommend devising a few concept alternatives and meeting with me to discuss how the concerns
mentioned above can be dealt with.
2. Diversion dikes appear to be used as "cleanwater" diversions which is not a state approved
standard. Diversions should only be used to direct runoff to sediment traps and basins. Please
remove these diversions from the plan.
3. Please show the soil map within the plan. A separate detail or layer in the ESC plan are both
acceptable. [DM]
4. Inlet protection is generally adequate only for drainage areas less than 1 acre. Remove the IP
symbol from the DI -7 and wrap the silt fence around the south and east sides of the structure.
5. Please remove all notes about a temporary slope drain from the plan. The slope drain would get in
the way of the grading operations and would be impractical to maintain.
6. In the construction sequence specify that the mobile classroom units must be removed before the
bypass storm system is installed.
7. The construction entrance should be shown graphically as 70ft.
8. No ESC bond will be necessary since this is a County project.