Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200900064 Review Comments Bond Estimate 2010-03-03
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Old Trail Village Block 3 Phase B PROJECT NUMBER: WPO200900064 - SDP200900093 - SUB200900161 DATE OF ESTIMATE: 03/03/10 ESTIMATE BY: ADP BASED ON: E &SC submittal WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 8.3 1500 12450 SILT FENCE LF 0 5 0 WIRE SUPPORTED SILT FENCE LF 950 10 9500 SAFETY FENCE LF 0 3 0 TREE PROTECTION FENCE LF 0 5 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 540 3 1620 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 1.35 1000 1350 SEDIMENT TRAP 2 ACRES 0.61 1000 610 SEDIMENT BASIN 1 ACRES 0 1000 0 SEDIMENT BASIN 2 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 13 200 2600 OUTLET PROTECTION EA 0 200 0 UTILITY STREAM CROSSING EA 1 1000 1000 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal 31130.00 project management 4669.50 subtotal 35799.50 CONTINGENCY LS 10% 3579.95 TOTAL 39379.45 BOND AMOUNT REQUIRED 39400.00