Loading...
HomeMy WebLinkAboutSDP200800086 Correspondence Final Site Plan and Comps. 2008-09-19—'- ---- ENVIRONMENTAL "Environmental Services -11116 Hampton Drive CONTROL With aynesboro, Virginia 22980 OPPORTUNITIES, LLC Economical Solutions" Telephone: (540) 942 -1104 September 19, 2008 Dickerson Ridge, LLC Attention: Mr. George W. Ray, Jr. 690 Berkmar Circle Charlottesville, Virginia 22901 Re: Wetland Permit Proposed Willow Glen Development Albemarle County, Virginia Mr. Ray: I completed and mailed the enclosed Wetland Pre - Construction Notification/Nationwide Permit Number 18 Request to Mr. Tucker Smith of the US Army Corps of Engineers on July 25, 2008. I received confirmation that he had received the Request on July 28, 2008. According to the regulations, the Army Corps of Engineers has 45 days to review and respond to a request. If they do not respond within that time -frame, the Permit is Authorized, contingent on the activities following the requirements of the related Permit. I verified that with him. through email, a copy of which is attached. Because the Corps has been very low on manpower, they did not get to review this request; therefore, this is now considered an authorized activity through default. For the impacts planned on your property, the applicable Permit requested was a Nationwide Number 18 Permit. I have attached here the General Conditions and wording of that Permit. While many of these conditions are general and some do not apply to your area, anyone in charge of the construction that will be impacting the stream and wetland areas should be aware of and follow it's contents. As the Project Owner, you should be aware that .you are required to complete the Certificate of Compliance at the back of the Permit when the project has been completed, and submit that to the US Army Corps of Engineers. I was glad to work with you on this project. If you have any further questions, feel free to contact me Best Regards, ENVIRONMENTAL CONTROL OPPORTUNITIES, LLC David L. Powell, MSEH, REM Environmental Scientist Cc: Steve Edwards, Terra Concepts > From: "Smith, Marshall (Tucker) T NAO" <Tucker.Smith @usace.army.mil> > To: "David Powell" <ecopow @ntelos.net> > Cc: "Iseli, Nora M NAO" <Nora.M.Iseli @usace.army.mil> > Sent: Tuesday, September 02, 2008 1:21 PM > Subject: RE: Wetland NWP Permits > > > According to NWP PCN authorization, after 45 days, the NWP is authorized. > I • will not be catching up on PCN's for a few weeks, so the two you • reference, after 45 days upon receipt in this office, are authorized. > Thank you. > Tucker Smith > Environmental Scientist > Army Corps of Engineers Regulatory Office Western Virginia Field > Office > 3527 Riverbend. Drive > Elkton, VA 22827 > tucker.smith @usace.army.mil > Phone: 434 - 390 -5716