Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200900002 Review Comments Bond Estimate 2010-02-19
BOND ESTIMATE - EROSION CONTROL PROJECT NAME: WHITEHOUSE COMMERCIAL PROJECT NUMBER: WPO200900002 DATE OF ESTIMATE: 02/17/10 ESTIMATE BY: JPD BASED ON: WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 4.62 $1,500.00 $6,930.00 SILT FENCE LF 555 $5.00 $2,775.00 SAFETY FENCE LF 0 $3.00 $0.00 TEMPORARY FILL DIVERSION LF 0 $3.00 $0.00 DIVERSION DIKE LF 369 $3.00 $1,107.00 TEMPORARY SLOPE DRAIN LF 0 $20.00 $0.00 SEDIMENT TRAP 1 ACRES 0 $1,000.00 $0.00 SEDIMENT TRAP2 ACRES 0 $1,000.00 $0.00 CULVERT INLET PROTECTION EA 1 $500.00 $500.00 INLET PROTECTION EA 16 $200.00 $3,200.00 OUTLET PROTECTION EA 0 $200.00 $0.00 EC -2 & 3 DITCH PROTECTION LF 0 $10.00 $0.00 RIP -RAP LF 0 $55.00 $0.00 CHECK DAMS SQ.YD. 0 $30.00 $0.00 STREAM CROSSING TYPE I EA 0 $1,000.00 $0.00 STREAM CROSSING TYPE II EA 0 $3,000.00 $0.00 STREAM CROSSING TYPE III EA 0 $5,000.00 $0.00 PAVED CONSTRUCTION ENTRANCE EA 1 $2,000.00 $2,000.00 SUBTOTAL 16512.00 PROJECT MANAGEMENT LS 15% 2476.80 TOTAL 18988.80 PROJECT ADMINISTRATION 10% 1898.88 BOND AMOUNT REQUIRED jj 20900.00 readsheet last revised:12 -5 -01