COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project:
North Fork Regional Pump Station [SDP200900046, WP02009000281
Plan preparer:
Charles Luck P.E. [cluck @wrallp.com]
Owner or rep.:
University of Virginia Foundation
Plan received date:
8 June 2009
Rev 1:
1 March 2009
Date of comments:
30 June 2009
Rev 1:
10 March 2009
Reviewer:
John P. Diez — Current Development - Engineering Technician
A. Final site plan (SDP200900046)
1. Please provide VDOT designations for the proposed guardrails by the entrance. [18- 32.7.2]
(Rev. 1) Comment has been addressed.
2. All entrances must show VDOT designations (PE -1, CG -9a, etc.)
(Rev. 1) Comment has been addressed.
3. VDOT approval must be obtained by any plan affecting public right -of -way.
(Rev. 1) Comment has been addressed.
4. The length of the turn and taper lane seems to be less than the required 144' for the 12' wide lane.
(Rev. 1) Comment has been addressed.
5. Please provide updated Albemarle County general construction notes. Please refer to the Design
Standards Manual.
(Rev. 1) Comment has been addressed.
6. There appears to be a king of lining on the north side of the entrance. Please label it and include it
in the limits of disturbance.
(Rev. 1) Comment has been addressed.
B. Erosion Control Plan (WP0200900028)
7. Please provide updated County erosion control notes. Please refer to the Design Standards Manual.
(Rev. 1) Comment has been addressed.
The Erosion & Sediment Control Plan (WP0200900028) submitted 1 March 2010 have received
Engineering Review and meet Albemarle County minimum checklist items for approval. Please
submit 5 paper copies of the Plan to Current Development Engineering.
The E &SC bond amount is $43,300.00. The forms and instructions to post the Water
Protection Ordinance Bond can be found on the Community Development Department
Web site on www.albemarle.org.
Engineering Review Comments
Page 2 of 2
Once the E &SC bond has been posted, you may contact the Department of Community
Development to arrange a pre - construction meeting with a County Erosion & Sediment Control
Inspector. Should the County Inspector find the limits of disturbance increased or the need for
additional control measures required to protect the site, additional fees will be required.
If you have any questions, you can reach me, John Diez, at (434) 296 -5832 ext. 3025, or my email:
j diez @ albemarle. or ,a.