Loading...
HomeMy WebLinkAboutWPO200900028 Review Comments Erosion Control Plan 2010-03-10� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: North Fork Regional Pump Station [SDP200900046, WP02009000281 Plan preparer: Charles Luck P.E. [cluck @wrallp.com] Owner or rep.: University of Virginia Foundation Plan received date: 8 June 2009 Rev 1: 1 March 2009 Date of comments: 30 June 2009 Rev 1: 10 March 2009 Reviewer: John P. Diez — Current Development - Engineering Technician A. Final site plan (SDP200900046) 1. Please provide VDOT designations for the proposed guardrails by the entrance. [18- 32.7.2] (Rev. 1) Comment has been addressed. 2. All entrances must show VDOT designations (PE -1, CG -9a, etc.) (Rev. 1) Comment has been addressed. 3. VDOT approval must be obtained by any plan affecting public right -of -way. (Rev. 1) Comment has been addressed. 4. The length of the turn and taper lane seems to be less than the required 144' for the 12' wide lane. (Rev. 1) Comment has been addressed. 5. Please provide updated Albemarle County general construction notes. Please refer to the Design Standards Manual. (Rev. 1) Comment has been addressed. 6. There appears to be a king of lining on the north side of the entrance. Please label it and include it in the limits of disturbance. (Rev. 1) Comment has been addressed. B. Erosion Control Plan (WP0200900028) 7. Please provide updated County erosion control notes. Please refer to the Design Standards Manual. (Rev. 1) Comment has been addressed. The Erosion & Sediment Control Plan (WP0200900028) submitted 1 March 2010 have received Engineering Review and meet Albemarle County minimum checklist items for approval. Please submit 5 paper copies of the Plan to Current Development Engineering. The E &SC bond amount is $43,300.00. The forms and instructions to post the Water Protection Ordinance Bond can be found on the Community Development Department Web site on www.albemarle.org. Engineering Review Comments Page 2 of 2 Once the E &SC bond has been posted, you may contact the Department of Community Development to arrange a pre - construction meeting with a County Erosion & Sediment Control Inspector. Should the County Inspector find the limits of disturbance increased or the need for additional control measures required to protect the site, additional fees will be required. If you have any questions, you can reach me, John Diez, at (434) 296 -5832 ext. 3025, or my email: j diez @ albemarle. or ,a. \\ Cob- dts01 \cityviewlnk\Docs \2009 \SDP \SDP200900046 North Fork Regional Pump Station - Final \CDE2- fsp,esc_JPD_North Fork Regional Pump Station.doc