Loading...
HomeMy WebLinkAboutSUB200900070 Review Comments Bond Estimate 2010-03-23Development Name ARDEN PLACE SUB200900070/SDP200900091 ROAD Construction Bond Estimate (roads, site work, storm sewer) Updated 11120109 with changes to VDOT fees Road Name Mallside Forest Court (PVT) 10 +00 to 12 +90 Road Length 290.0 ft Item Item No. Unit Unit Cost Cost Number installed 1 aggregate base 8.0 in d 290.0 ft L 20.0 ft W 143.2 cy $43.09 $6,171.20 2 blotted or prime &double seal 290.0 ft L 0.0 ft W 0.0 sy $7.56 $0.00 3 asphalt base 3.0 in d 290.0 ft L 20.0 ft W 81.2 tons $88.20 $7,161.84 4 asphalt surface 2.0 in d 290.0 ft L 20.0 ft W 54.1 tons $98.28 $5,320.22 6 curb CG -2 0.0 ft $10.08 $0.00 7 curb CG -6 580.0 ft $16.59 $9,624.64 8 sidewalk, asphalt 0.0 in d 290.0 ft L 0.0 ft W 0.0 tons $88.20 $0.00 9 sidewalk, concrete S width 580.0 ft $13.99 $8,111.88 10 ramp CG -12 4 $378.00 $1,512.00 11 street name sign 2 $78.00 $156.00 12 traffic control sign 3 $59.22 $177.66 13 guardrail (or rebuild wall in right -of -way) 0 ES @ $3700 55.0 ft $20.16 $1,108.80 14 street trees 10.0 each $100.00 $1,000.00 15 manhole or drop inlet 2 $1,638.00 $3,276.00 16 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 65.0 ft $27.72 $1,801.80 17 pipe, rcp (54 to 72 ") 54.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $189.00 $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $7.56 $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 2 ES -1,2 $250 1 EC -1 $200 0.0 ft $27.72 $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $175.20 $0.00 21 rip -rap, placed 0.0 ton $37.80 $0.00 22 E &S fabric,EC -2,3 0 ft L 0 ft W 0.0 sy $12.60 $0.00 23 clear and grub (for wooded sites) 290.0 ft L 49.0 ft W 0.3 acre $12,600.00 $4,110.33 24 grading (per cy for cut or import only) 0.0 cy fill 0.0 cy cut 0.0 cy $3.78 $0.00 24 CBR tests (1 every 0.1 mi. per road) 290.0 ft L 0.58 !no of 500' 2 $189.00 $302.40 25 as -built drawings (1k+ price per 0.1 mi.) 290.0 ft L 0.0549 mi. 1 $1,260.00 $1,260.00 26 survey and layout (price per 0.1 mi.) 290.0 ft L 0.0549 mi. 1 $630.00 $630.00 27 mobilization 1 $630.00 $630.00 28 VDOT surety (per 1/10 lane- mile)` 0.0 ft L 0 1/10 mi. 2 Lanes $3,000.00 $0.00 29 VDOT inspection fee (per 1/10 mile)' 0.0 ft L 0 1/10 mi. $500 +$125'1/10 centerline milt $125.00 $0.00 30 VDOT admin. cost recovery fee(per center lane mile 0.0 ft L 0 1/10 mi. $500 +$250'1/10 centerline milt $250.00 $0.00 cost sum $52,354.77 project management 15% $7,853.22 subtotal $60,207.99 contigency 10% $6,020.80 Total J $66,300 3/24/2010 Development Name ARDEN PLACE SUB200900070/SDP200900091 ROAD Construction Bond Estimate (roads, site work, storm sewer) Updated 11120109 with changes to VDOT fees Road Name Arden Creek Lane (PVT) 10 +00 to 11 +60 Road Length 160.0 ft Item Item No. Unit Unit Cost Cost Number installed 1 aggregate base 6.0 in d 160.0 ft L 22.0 ft W 65.2 cy $43.09 $2,808.96 2 blotted or prime &double seal 160.0 ft L 0.0 ft W 0.0 sy $7.56 $0.00 3 asphalt base 4.0 in d 160.0 ft L 22.0 ft W 65.7 tons $88.20 $5,795.33 4 asphalt surface 2.0 in d 160.0 ft L 22.0 ft W 32.9 tons $98.28 $3,228.83 6 curb CG -2 320.0 ft $10.08 $3,225.60 7 curb CG -6 320.0 ft $16.59 $5,310.14 8 sidewalk, asphalt 0.0 in d 160.0 ft L 0.0 ft W 0.0 tons $88.20 $0.00 9 sidewalk, concrete S width 320.0 ft $13.99 $4,475.52 10 ramp CG -12 0 $378.00 $0.00 11 street name sign 1 $78.00 $78.00 12 traffic control sign 3 $59.22 $177.66 13 guardrail (or rebuild wall in right -of -way) 0 ES @ $3700 0.0 ft $20.16 $0.00 14 street trees 7.0 ea $100.00 $700.00 15 manhole or drop inlet 2 $1,638.00 $3,276.00 16 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 32.0 ft $27.72 $887.04 17 pipe, rcp (54 to 72 ") 54.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $189.00 $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $7.56 $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 2 ES -1,2 $250 1 EC -1 $200 0.0 ft $27.72 $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $175.20 $0.00 21 rip -rap, placed 0.0 ton $37.80 $0.00 22 E &S fabric,EC -2,3 0 ft L 0 ft W 0.0 sy $12.60 $0.00 23 clear and grub (for wooded sites) 160.0 ft L 59.0 ft W 0.2 acre $12,600.00 $2,730.58 24 grading (per cy for cut or import only) 0.0 cy fill 0.0 cy cut 0.0 cy $3.78 $0.00 24 CBR tests (1 every 0.1 mi. per road) 160.0 ft L 0.32 !no of 500' 1 $189.00 $264.60 25 as -built drawings (1k+ price per 0.1 mi.) 160.0 ft L 0.0303 mi. 1 $1,260.00 $1,260.00 26 survey and layout (price per 0.1 mi.) 160.0 ft L 0.0303 mi. 1 $630.00 $630.00 27 mobilization 1 $630.00 $630.00 28 VDOT surety (per 1/10 lane- mile)` 0.0 ft L 0 1 /10 mi. 2 Lanes $3,000.00 $0.00 29 VDOT inspection fee (per 1/10 mile)' 0.0 ft L 0 1/10 mi. $500 +$125'1/10 centerline milt $125.00 $0.00 30 VDOT admin. cost recovery fee(per center lane mile 0.0 ft L 0 1/10 mi. $500 +$250'1/10 centerline milt $250.00 $0.00 cost sum $35,478.26 project management 15% $5,321.74 subtotal $40,799.99 contigency 10% $4,080.00 Total I $44,900 3/24/2010 Development Name ARDEN PLACE SUB200900070/SDP200900091 ROAD Construction Bond Estimate (roads, site work, storm sewer) Updated 11120109 with changes to VDOT fees Road Name Putt Putt Lane Improvements 10 +00 to 11 +60 Road Length 550.0 ft Total 1 $65,000 3/24/2010 (PVT) Item Item No. Unit Unit Cost Cost Number installed 1 aggregate base 8.0 in d 550.0 ft L 4.0 ft W 54.3 cy $43.09 $2,340.80 2 blotted or prime &double seal 550.0 ft L 0.0 ft W 0.0 sy $7.56 $0.00 3 asphalt base 4.0 in d 550.0 ft L 4.0 ft W 41.1 tons $88.20 $3,622.08 4 asphalt surface 1.5 in d 550.0 ft L 20.0 ft W 77.0 tons $98.28 $7,567.56 6 curb CG -2 0.0 ft $10.08 $0.00 7 curb CG -6 1100.0 ft $16.59 $18,253.62 8 sidewalk, asphalt 0.0 in d 550.0 ft L 0.0 ft W 0.0 tons $88.20 $0.00 9 sidewalk, concrete 5' width 550.0 ft $13.99 $7,692.30 10 ramp CG -12 2 $378.00 $756.00 11 street name sign 0 $78.00 $0.00 12 traffic control sign 0 $59.22 $0.00 13 guardrail (or rebuild wall in right -of -way) 0 ES @ $3700 0.0 ft $20.16 $0.00 14 street trees 0.0 ea $100.00 $0.00 15 manhole or drop inlet 3 $1,638.00 $4,914.00 16 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 50.0 ft $27.72 $1,386.00 17 pipe, rcp (54 to 72 ") 54.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $189.00 $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $7.56 $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 2 ES -1,2 $250 1 EC -1 $200 0.0 ft $27.72 $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $175.20 $0.00 21 rip -rap, placed 0.0 ton $37.80 $0.00 22 E &S fabric, EC -2,3 0 ft L 0 ft W 0.0 sy $12.60 $0.00 23 clear and grub (for wooded sites) 550.0 ft L 0.0 ft W 0.0 acre $12,600.00 $0.00 24 grading (per cy for cut or import only) 0.0 cy fill 0.0 cy cut 0.0 cy $3.78 $0.00 24 CBR tests (1 every 0.1 mi. per road) 550.0 ft L 1.1 inc of 500' 2 $189.00 $396.90 25 as -built drawings (1 k +price per 0.1 mi.) 550.0 ft 0.1042 mi. 2 $1,260.00 $2,520.00 26 survey and layout (price per 0.1 mi.) 550.0 ft L 0.1042 mi. 2 $630.00 $1,260.00 27 mobilization 1 $630.00 $630.00 28 VDOT surety (per 1/10 lane- mile)* 0.0 ft L 0 1/10 mi. 2 Lanes $3,000.00 $0.00 29 VDOT inspection fee (per 1/10 mile)* 0.0 ft L 0 1/10 mi. $500 +$125 *1/10 centerline mill $125.00 $0.00 30 VDOT admin. cost recovery fee(per center lane 1 0.0 ft L 0 1/10 mi. $500 +$250 *1/10 centerline mils $250.00 $0.00 cost sum $51,339.26 project management 15% $7,700.89 subtotal $59,040.15 contigency 10% $5,904.01 Total 1 $65,000 3/24/2010