Loading...
HomeMy WebLinkAboutSUB201000025 Review Comments Bond Estimate 2010-03-05Development Name Liberty Hall SUB201000025 / SDP200900102 ROAD Construction Bond Estimate (roads, site work, storm sewer) Updated 11120109 with changes to VDOT fees Road Name Pioneer Lane (PVT one -way) Road Length 345.0 ft Item Item No. Unit Unit Cost Cost Number installed 1 aggregate base 8.0 in d 345.0 ft L 12.0 ft W 102.2 cy $43.09 $4,404.96 2 blotted or prime &double seal 345.0 ft L 0.0 ft W 0.0 sy $7.56 $0.00 3 asphalt base 3.0 in d 345.0 ft L 12.0 ft W 58.0 tons $88.20 $5,112.07 4 asphalt surface 2.0 in d 345.0 ft L 12.0 ft W 38.6 tons $98.28 $3,797.54 6 curb CG -2 0.0 ft $10.08 $0.00 7 curb CG -6 100.0 ft $16.59 $1,659.42 8 sidewalk, asphalt 0.0 in d 345.0 ft L 0.0 ft W 0.0 tons $88.20 $0.00 9 sidewalk, concrete S width 0.0 ft $13.99 $0.00 10 ramp CG -12 4 $378.00 $1,512.00 11 street name sign 1 $78.00 $78.00 12 traffic control sign 4 $59.22 $236.88 13 guardrail (or rebuild wall in right -of -way) 0 ES @ $3700 0.0 ft $20.16 $0.00 14 street trees 0.0 each $100.00 $0.00 15 manhole or drop inlet 1 $1,638.00 $1,638.00 16 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 45.0 ft $27.72 $1,247.40 17 pipe, rcp (54 to 72 ") 54.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $189.00 $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $7.56 $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 2 ES -1,2 $250 1 EC -1 $200 0.0 ft $27.72 $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $175.20 $0.00 21 rip -rap, placed 0.0 ton $37.80 $0.00 22 E &S fabric,EC -2,3 0 ft L 0 ft W 0.0 sy $12.60 $0.00 23 clear and grub (for wooded sites) 345.0 ft L 49.0 ft W 0.2 acre $12,600.00 $1,990.80 24 grading (per cy for cut or import only) 0.0 cy fill 0.0 cy cut 0.0 cy $3.78 $0.00 24 CBR tests (1 every 0.1 mi. per road) 345.0 ft L 0.69 !no of 500' 2 $189.00 $321.30 25 as -built drawings (1k+ price per 0.1 mi.) 345.0 ft L 0.0653 mi. 1 $1,260.00 $1,260.00 26 survey and layout (price per 0.1 mi.) 345.0 ft L 0.0653 mi. 1 $630.00 $630.00 27 mobilization 1 $630.00 $630.00 28 VDOT surety (per 1/10 lane- mile)` 0.0 ft L 0 1/10 mi. 1 Lanes $3,000.00 $0.00 29 VDOT inspection fee (per 1/10 mile)' 0.0 ft L 0 1/10 mi. $500 +$125'1/10 centerline milt $125.00 $0.00 30 VDOT admin. cost recovery fee(per center lane mile 0.0 ft L 0 1/10 mi. $500 +$250'1/10 centerline milt $250.00 $0.00 cost sum $24,518.37 project management 15% $3,677.76 subtotal $28,196.13 contigency 10% $2,619.61 Total $31,100 3/5/2010