Loading...
HomeMy WebLinkAboutWPO201000007 Review Comments Bond Estimate 2010-02-24BOND ESTIMATE - EROSION CONTROL PROJECT NAME: PROJECT NUMBER: DATE OF ESTIMATE ESTIMATE BY: BASED ON: Vierbuchen Residence W PO- 2010 -00007 02/24/10 PBC Drawing signed 2/17/10 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 3 1500 4500 SILT FENCE LF 840 5 4200 DIVERSION DIKE LF 270 3 810 TEMPORARY SLOPE DRAIN LF 50 20 1000 SEDIMENT TRAP 1 ACRES 0.9 1000 900 INLET PROTECTION EA 1 200 200 OUTLET PROTECTION EA 2 200 400 EC -2, EC -3 MATTING SY 150 10 1500 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal project management subtotal CONTINGENCY TOTAL BOND AMOUNT REQUIRED 15510.00 2326.50 17836.50 LS 10% 1783.65 19620.15 19700.00 last revised:12 -5 -01