Loading...
HomeMy WebLinkAboutSDP200900080 Review Comments Final Site Plan and Comps. 2010-03-01Philip Custer From: Philip Custer Sent: Monday, March 01, 2010 9:45 AM To: 'Gregory Solis'; 'Gathright, Clark' Cc: Elizabeth Marotta Subject: RE: Engineering review of South Plains Presbyterian Church (WPO- 2009 - 00050) Good morning, Engineering has received the last submittal of the SWM plans for South Plains Presbyterian Church (WPO- 2009 - 00050). All comments regarding the SWM plan have been addressed and the SWM plan is hereby approved pending site plan approval. (The ESC plan had previously been approved —see below.) Now that the WPO plan has been approved, Engineering review has no objection to the approval of the site plan. The WPO bond amounts remain the same. The ESC bond has been computed to be $8,800. The SWM bond has been computed to be $3,600. The forms and instructions to post the Water Protection Ordinance Bond can be found on the Community Development Department Web site on www.albemarle.org. You may contact Ana Kilmer (Albemarle County Department of Community Development) at ext. 3246 for further information on bonding procedures. Once the site plan is approved by the planner and the WPO bonds posted, the applicant may schedule a pre- construction meeting with the Erosion and Sediment Control Inspector. Please contact me if you have any questions. Thanks, Phil 296 -5832 x3072 From: Philip Custer Sent: Monday, February 22, 2010 9:55 AM To: Gregory Solis; 'Gathright, Clark' Cc: Elizabeth Marotta Subject: Engineering review of South Plains Presbyterian Church (WPO- 2009 - 00050) Good morning, Engineering has received the last submittal of the ESC and SWM plans for South Plains Presbyterian Church (WPO -2009- 00050). All comments regarding the ESC plan have been addressed and the ESC plan is hereby approved pending site plan approval. The SWM plan can be approved after the following minor changes are made: - Increase the footprint of the infiltration trench by 18% and update the infiltration calculations with the data from the soil tests (the impervious area draining to this facility is 7247sf, not 6140sf). Also, the callout on sheet C3.1 specifies a footprint of 160sf and should be corrected. - Label the set on the Cover Sheet as Erosion and Sediment Control and Stormwater Management Plans - The professional seal must be signed and dated. - Remove the soil test note on the infiltration trench detail on sheet 3.2 (this is only a recommendation because another soil test is not required) Once these changes have been made, please submit 5 copies of the plans for approval. Another $300 review fee is not warranted. The ESC bond has been computed to be $8,800. The SWM bond has been computed to be $3,600. The forms and instructions to post the Water Protection Ordinance Bond can be found on the Community Development Department Web site on www.albemarle.org. You may contact Ana Kilmer (Albemarle County Department of Community Development) at ext. 3246 for further information on bonding procedures. Once the SWM plans have been officially approved, the site plan signed by the planner, and the WPO bonds posted, the applicant may schedule a pre- construction meeting with the Erosion and Sediment Control Inspector. Please contact me if you have any questions. Thanks, Phil 296 -5832 x3072