Loading...
HomeMy WebLinkAboutSDP201000009 Review Comments Final Site Plan and Comps. 2010-03-05Summer Frederick From: DeNunzio, Joel D., P.E. [ Joel .DeNunzio @VDOT.virginia.gov] Sent: Friday, March 05, 2010 4:04 PM To: Summer Frederick Cc: Max Greene; Pat Mullaney Subject: Preddy Creek Park Entrance Preddy Creek Park Entrance Summer, I have reviewed the above plan and have the following comment: • I recommend changing the typical road section with asphalt to show 2 inches surface and 8 inches of stone. The proposed design with 2 inches of intermediate does not provide any structural benefit and using only the surface at 2 inches and 8 inches of stone will make construction easier and lower the cost of the pavement. • A permit will be required for construction within the route 641 ROW and can be obtained from the VDOT Charlottesville Residency Office. If you have any questions, please let me know. Thanks Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 ioel . den unzioCcbvdot.vir4inia.00v